Massachusetts Master Sheet Metal Exam (M-1 Unrestricted): Practice Test & Licensing Guide

The Massachusetts unrestricted master (M-1) sheet metal exam: 50 questions in 120 minutes on 271 CMR, estimating and bidding, financial management, taxes, labor law, contracts, project management, risk and safety. Open book, 70% to pass.

Questions
50
Time limit
2 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10MA Sheet Metal Rules and Regulations

A candidate for the M-1 license fails the Board's examination three times. Which statement about re-testing is correct under 271 CMR 3.01(1)?

Requirements at a glance

AgencyBoard of Examiners of Sheet Metal Workers (Division of Professional Licensure); exams by PSI
LicenseUnrestricted Master Sheet Metal (M-1; the M-2 Restricted exam has the same outline)
Format50 questions, 120 minutes, open book, 70% to pass
Fees$180 to PSI, plus $175 application and initial license fee to the Commonwealth

Journeyperson sheet metal workers applying for a Massachusetts Master Sheet Metal license from the Board of Examiners of Sheet Metal Workers.

How to get licensed, step by step

  1. Apply to the Board

    Submit the application with proof of your apprenticeship experience and education, and pay the application and initial license fee. Allow about 3 weeks for processing; PSI then emails your exam authorization.

    Board of Examiners of Sheet Metal Workers (opens in a new tab)

  2. Schedule the master sheet metal exam with PSI

    Schedule online or at (855) 746-8173. Cancel at least 2 days ahead or you forfeit your fees.

    Schedule with PSI (Massachusetts sheet metal workers) (opens in a new tab)

  3. Pass at 70%

    Bring your own copies of the allowed references, with permanent tabs only. If you fail, retake within 6 months of approval; after three failed attempts the Board wants proof of added study.

    Schedule with PSI (Massachusetts sheet metal workers) (opens in a new tab)

How to prepare

  • Financial management (8), estimating and bidding (7) and contracts (6) lead the outline; 271 CMR is 5 questions.
  • Only the NASCLA Basic guide (13th edition, 2020) and 271 CMR are allowed in the room; MGL Chapter 254 and OSHA 1926 are not.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NASCLA guide and 271 CMR. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • Basic Business and Project Management for Contractors, NASCLA, 13th edition (2020)
  • 271 CMR: Massachusetts Sheet Metal Regulation
  • MGL Chapter 254 (liens) and 29 CFR Part 1926 (OSHA) are exam sources but are not allowed in the exam room

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
MA Sheet Metal Rules and Regulations5
Estimating and Bidding7
Financial Management8
Lien Laws2
Tax Laws5
Labor Laws3
Project Management5
Contracts6
Business Structure and Organization2
Risk Management2
Environmental Issues and Safety5

Exam day details

  • Administered by PSI Services for the Massachusetts Board of Examiners of Sheet Metal Workers.
  • Fee: $180 PSI exam fee (re-examination $180, non-refundable) plus $175 for the application and initial license, paid to the Commonwealth with your application.
  • 50 questions in 120 minutes; 70% to pass. Open book. The M-2 Restricted Master exam has the same outline, so this one bank covers both.
  • Open book. Bring your own copies of the allowed references; they may be highlighted, underlined, annotated and indexed beforehand with permanent tabs only. You may not write in them during the exam, and loose papers and Post-it tabs are not allowed.
  • Candidates must have the required (or equivalent) apprenticeship experience and education, and the Board approves the application first. Allow about 3 weeks for processing.
  • If you fail, you have 6 months from the application approval date to retake. After three failed attempts you must give the Board proof of self-designed learning objectives or a completed exam preparation course.
  • PSI may add 5 to 10 unscored pretest questions. Cancel at least 2 days ahead or you forfeit the fee. Schedule at test-takers.psiexams.com/mametal or (855) 746-8173.

Frequently asked questions

What is on the Massachusetts master sheet metal exam?

50 questions: financial management 8, estimating and bidding 7, contracts 6, Massachusetts sheet metal rules 5, tax laws 5, project management 5, environmental issues and safety 5, labor laws 3, and smaller sections on liens, business structure and risk.

Is it open book?

Yes, but only the NASCLA guide and 271 CMR are allowed in the room.

What does it cost?

$180 to PSI, plus $175 for the application and initial license paid to the Commonwealth.

Free questions with answers

Show all 10 free questions and answers
  1. A candidate for the M-1 license fails the Board's examination three times. Which statement about re-testing is correct under 271 CMR 3.01(1)?

    Answer: The candidate must show completed self-designed learning objectives (or an exam prep course) based on the score-report weaknesses

    Candidates who fail have six months from the application date to re-take the exam, or they must submit a new application. After three unsuccessful attempts the candidate must document self-designed learning objectives tied to weaknesses on the score reports (or complete an exam preparation course) and include the score reports with the request.

    Reference: 271 CMR (Massachusetts Sheet Metal Regulation), 271 CMR 3.01(1)(a), Note 2

  2. A sheet metal subcontractor last furnished labor and material to a project on March 1 and no notice of substantial completion or termination has been recorded. A notice of contract was properly filed earlier. By what date must the subcontractor record the statement of amount due to keep the lien alive under G.L. c. 254, s. 8?

    Answer: June 29, which is 120 days after the last day of labor or materials

    Under Section 8 the lien is dissolved unless the statement is filed by the earliest of: 90 days after a recorded notice of substantial completion, 120 days after a recorded notice of termination, or 120 days after the last day labor or materials were furnished. With no notices recorded, the 120-day rule governs: March 1 plus 120 days is June 29. The 90-day distractor is the deadline to record a notice of contract, which is a different step.

    Reference: M.G.L. c. 254 (Liens on Buildings and Land), Section 8

  3. A sheet metal shop sells and installs commercial duct systems. It engages an installer on a 1099 basis who owns a truck and tools, is paid per job and signed an independent contractor agreement. The installer installs ductwork on the shop's own contracts. Under the Massachusetts independent contractor statute, how is the installer most likely classified?

    Answer: As an employee, because the service is performed within the usual course of the shop's business

    M.G.L. c. 149, s. 148B presumes a person is an employee unless all three prongs are met: free from control and direction, service outside the usual course of the employer's business, and customarily engaged in an independently established trade of the same nature. Installing ducts for a duct installation shop fails the second prong. Owning tools, per-job pay and a contract label do not satisfy the test.

    Reference: M.G.L. c. 149 (Independent Contractor Classification), Section 148B(a)

  4. A sheet metal contractor's one employee earns $1,500 gross in a weekly payroll, well below any wage base limit. What total social security and Medicare tax (employee share plus employer share) must be deposited for that paycheck?

    Answer: $229.50

    Each side pays 6.2% + 1.45% = 7.65%. The employee share is $1,500 x 0.0765 = $114.75, and the employer matches it with $114.75. Total: $114.75 x 2 = $229.50. $114.75 is only one share, $186.00 is 12.4% (social security only), and $217.50 is 14.5%.

    Reference: IRS Publication 15 (2026), Employer's Tax Guide, Social security and Medicare tax rates (6.2% and 1.45% each)

  5. Which business structure generally protects an owner's personal assets from the business's debts?

    Answer: A properly formed and operated corporation or limited liability company

    Owners of a properly formed corporation or LLC generally are not personally liable for the entity's debts. A sole proprietor and the partners in a general partnership are personally liable. Limited liability does not remove personal liability for one's own negligence or for personal guarantees.

    Reference: General business organization principles (trade knowledge), Business structures and owner liability

  6. A sheet metal installer uses a stepladder to hang duct below a ceiling. Which use of the stepladder does the OSHA construction ladder standard prohibit?

    Answer: Standing on the top or the top step of the stepladder to reach the duct

    29 CFR 1926.1053(b)(13) says the top or top step of a stepladder shall not be used as a step. The other choices are requirements, not violations: stepladders must have a spreader or locking device holding the sections open ((a)(8)), the user must face the ladder when climbing ((b)(20)), and at least one hand must grasp the ladder while moving up or down ((b)(21)). If the work cannot be reached without the top step, use a taller ladder or a lift.

    Reference: 29 CFR Part 1926 (OSHA Construction Standards), 1926.1053(a)(8), (b)(13), (b)(20) and (b)(21)

  7. Under the Code of Ethics in 271 CMR 5.01, what must be done before the final payment is made on a sheet metal job?

    Answer: A walk-through or inspection, with correction of deficient work

    271 CMR 5.01(5) (Completion) says job sites should be left clean and orderly, manufacturers' warranties and instructions provided for new equipment, and a walk-through or other inspection and correction of deficient work accomplished before the final payment.

    Reference: 271 CMR (Massachusetts Sheet Metal Regulation), 271 CMR 5.01(5)

  8. A takeoff calls for 40 feet of straight 24 in. x 12 in. rectangular duct. What is the sheet metal surface area?

    Answer: 240 square feet

    Perimeter = 2 x (24 + 12) = 72 in. = 6 ft. Surface area = perimeter x length = 6 ft x 40 ft = 240 sq ft. 120 sq ft uses only half the perimeter; 80 sq ft uses the cross-section area (2 sq ft) x 40; 480 sq ft double-counts the perimeter.

    Reference: Estimating principles (trade knowledge), Duct surface area takeoff

  9. A sheet metal contractor's balance sheet shows current assets of $280,000 and current liabilities of $175,000. What is its current ratio?

    Answer: 1.6

    Current ratio = current assets / current liabilities = $280,000 / $175,000 = 1.6. 0.63 inverts the ratio ($175,000 / $280,000). 0.6 and 0.38 divide working capital ($280,000 - $175,000 = $105,000) by current liabilities and by current assets; working capital is a dollar amount, not the current ratio.

    Reference: Contractor financial management principles (trade knowledge), Current ratio

  10. Which contract type pays the contractor's actual documented costs plus an additional fee?

    Answer: Cost-plus

    A cost-plus contract reimburses actual costs and adds a fee (fixed or a percentage). Unit price contracts pay a set price per installed unit, and lump sum and firm fixed price contracts pay one fixed amount regardless of actual cost.

    Reference: Contractor financial management principles (trade knowledge), Contract types