Requirements at a glance
| Agency | Electricians' Examining Board; exam by Prov |
|---|---|
| Exam | 100 questions, 4 hours, open book, 70% to pass |
| Experience | 4,000 hours as a journeyman electrician, or 12,000 hours of electrical installation experience (limited-license hours don't count), plus a 576-hour program of study: 450 hours of required courses and 126 hours of degree-related courses (confirm with the board) |
| Books allowed | 2026 NEC; Maine Laws & Rules; American Electrician's Handbook 17th ed.; Holt's Understanding Electrical Theory (2022) |
| Fees | $90 to Prov; board application and license fees are separate |
Electricians applying to the Maine Electricians' Examining Board for a master license. You need 4,000 hours as a journeyman or 12,000 hours in total (limited-license hours don't count), plus a 576-hour program: 450 course hours and 126 degree-related hours.
Official links
How to get licensed, step by step
Meet the experience and course requirements
Log 4,000 hours as a journeyman or 12,000 hours in total, and finish the 450-hour course plus 126 degree-related hours.
Maine Office of Professional and Occupational Regulation (opens in a new tab)Maine Revised Statutes Title 32, Chapter 17 (electricians) (opens in a new tab)
Apply to the Electricians' Examining Board
The board reviews your application and approves you to test.
Maine Office of Professional and Occupational Regulation (opens in a new tab)
Schedule with Prov
After the board approves you, book at provexam.com/scheduler (3 Maine centers, or remote through Examroom). If you fail, wait 1 day; there is no attempt limit. You can reschedule free up to 3 days ahead.
Schedule with Prov (opens in a new tab)Prov: Maine OPOR Candidate Information Bulletin (opens in a new tab)
How to prepare
- Wiring methods and materials (24) and wiring and protection (19) are 43 of 100 questions.
- You have 4 hours for 100 questions, so the time is generous; use it to look answers up in the NEC.
- Maine adopted the 2026 NEC effective July 1, 2026 (Ch. 120), keeping 110.16 at the 2023 text. The bulletin prints the 2026 NEC for this exam. Confirm the edition before you buy a book.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2026 NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2026 National Electrical Code (NEC), NFPA 70Essential
Allowed in the exam room. Most of the electrician exam comes from it.
American Electrician's Handbook, 17th Edition
Allowed in the exam room. Tables, formulas and theory for the electrician exams.
Mike Holt's Understanding Electrical Theory for NEC Applications (2022)
Allowed in the exam room. Covers the theory questions.
Official reference list (as published by the testing agency)
- NFPA 70 National Electrical Code, 2026 (open book)
- Maine Laws & Rules, Office of Professional and Occupational Regulation (open book)
- American Electrician's Handbook, 17th Edition, McGraw Hill (open book)
- Mike Holt's Understanding Electrical Theory for NEC Applications, 2022 (open book)
What's on the exam
Official content outline from Prov, Inc. (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Electrical Knowledge | 15 | |
| Communication Systems | 2 | |
| Equipment for General Use | 15 | |
| Service Feeders and Branch Circuits | 4 | |
| Motors & Controls | 4 | |
| Special Conditions | 4 | |
| Special Equipment | 7 | |
| Special Occupancies | 6 | |
| Wiring & Protection | 19 | |
| Wiring Methods & Materials | 24 |
Exam day details
- Administered by Prov, Inc. for the Maine Office of Professional and Occupational Regulation.
- Fee: $90 to Prov. Board application and license fees are separate.
- 100 questions in 4 hours; 70 correct (70%) to pass.
- Open book: the four references above are permitted in the exam room.
- The licensing board approves your application first; then you schedule with Prov at a Maine test center or remotely through Examroom.
- If you fail, wait 1 day to retake. There is no limit on attempts. You can reschedule free up to 3 days before your appointment.
Note: The Prov bulletin lists the 2026 NEC for this exam. Maine adopted the 2026 NEC effective July 1, 2026 (Chapter 120), keeping 110.16 at the 2023 text. The Prov bulletin lists the 2023 NEC for the limited house wiring exam, so editions on Prov's pages are mixed. Check the current bulletin before your test date.
Frequently asked questions
What's on the Maine master electrician exam?
100 questions: wiring methods and materials 24, wiring and protection 19, general electrical knowledge 15, equipment for general use 15, special equipment 7, special occupancies 6, service feeders and branch circuits 4, motors and controls 4, special conditions 4 and communication systems 2.
How long is the master electrician exam?
4 hours (240 minutes) for 100 questions.
Is the master exam open book?
Yes. The 2026 NEC, Maine Laws & Rules, the American Electrician's Handbook and Holt's Understanding Electrical Theory are permitted.
Free questions with answers
Show all 10 free questions and answers
An ideal single-phase transformer steps 480 volts down to 120 volts. The primary draws 4 amperes at full load. What is the secondary current?
Answer: 16 A
The turns ratio is 480 / 120 = 4:1. Current changes inversely with voltage, so the secondary current = 4 A x 4 = 16 A (VA in = VA out: 480 x 4 = 1,920 = 120 x 16). 1 A divides instead of multiplying, 4 A ignores the ratio, and 64 A applies the ratio twice.
Reference: Basic electrical theory (Ohm's law and power formulas), Transformer voltage and current ratios
A 5,500-watt, 240-volt, 50-gallon fixed storage-type water heater is on its own branch circuit. Using 422.13, 210.20(A) and Table 240.6(A), what is the minimum standard rating of the circuit breaker?
Answer: 30 A
A fixed storage-type water heater of 120 gallons or less is a continuous load. Load current = 5,500 / 240 = 22.9 A; x 1.25 = 28.6 A; the next standard size is 30 A. 25 A comes from using the unadjusted 22.9 A, while 35 A and 40 A are larger than the next standard rating above the calculated value.
Reference: NFPA 70, National Electrical Code, 2026, 422.13; 210.20(A); Table 240.6(A)
Trade size 2 rigid PVC conduit is installed exposed in a horizontal run along a wall. What is the maximum spacing between supports under Table 352.30(B)?
Answer: 5 ft
Table 352.30(B) lists 3 ft for trade sizes 1/2 through 1, 5 ft for 1-1/4 through 2, 6 ft for 2-1/2 and 3, 7 ft for 3-1/2 through 5, and 8 ft for trade size 6. Trade size 2 falls in the 1-1/4 to 2 group, so 5 ft applies. Section 352.30(A) also requires fastening within 3 ft of each box or termination.
Reference: NFPA 70, National Electrical Code, 2026, 352.30(B), Table 352.30(B)
A concrete-encased electrode is made of reinforcing steel in a building footing. What is the minimum length of 1/2-inch or larger rebar required for it to qualify as an electrode?
Answer: 20 ft
Section 250.52(A)(3) requires at least 20 ft of one or more bare, zinc-galvanized or conductive-coated reinforcing bars of 1/2 in. or larger, in one continuous length or joined together, encased by at least 2 in. of concrete in a foundation or footing in direct contact with the earth. A bare 4 AWG copper conductor of at least 20 ft is the alternative. 8 ft is the rod length; 10 ft and 25 ft are not the electrode length.
Reference: NFPA 70, National Electrical Code, 2026, 250.52(A)(3)
At a new dwelling service, an intersystem bonding termination (IBT) is installed for the telephone, CATV and satellite systems. Under 250.94(A), what is the minimum number of intersystem bonding conductors it must be able to accept?
Answer: Three
Section 250.94(A) requires the IBT to have a set of terminals with the capacity to connect not fewer than three intersystem bonding conductors, so that communications systems can be bonded to the service grounding system. It must also be accessible and must not interfere with opening the service or meter enclosure.
Reference: NFPA 70, National Electrical Code, 2026, 250.94(A)
Under the 2026 NEC, where must the service disconnect for a new one-family dwelling be located when no separate emergency disconnect complying with 225.41 is installed?
Answer: Outdoors, in a readily accessible location on the dwelling or within sight of it
The 2026 NEC deleted 230.85 and moved the location requirement into 230.70(A)(1): for one- and two-family dwellings the service disconnect must be at a readily accessible outdoor location, on or within sight of the dwelling. The nearest-point-of-entrance rule now applies to other buildings under 230.70(A)(2).
Reference: NFPA 70, National Electrical Code, 2026, 230.70(A)(1)
A 30-hp, 230-volt, three-phase continuous-duty induction motor is supplied by THWN copper conductors terminating on 75 degrees C terminals. Using Table 430.250 (80 A), 430.22 and Table 310.16, what is the smallest copper conductor?
Answer: 3 AWG
Branch-circuit conductors for a single continuous-duty motor must have an ampacity of at least 125 percent of the Table 430.250 full-load current: 80 x 1.25 = 100 A. At 75 degrees C, 3 AWG copper = 100 A. 4 AWG is only 85 A, and 2 AWG (115 A) and 1 AWG (130 A) are larger than required.
Reference: NFPA 70, National Electrical Code, 2026, 430.22; Table 430.250; Table 310.16
An office building has a legally required standby system under Article 701 that supplies smoke-control fans. What is the maximum time after loss of normal power in which the system must have power available?
Answer: 60 seconds
Section 701.12 allows legally required standby power to be available within the time required for the application, but not more than 60 seconds. The 10 second limit is for emergency systems (700.12), and optional standby systems have no required time.
Reference: NFPA 70, National Electrical Code, 2026, 701.12
An arc welder's nameplate shows a rated primary current of 50 A and a 50 percent duty cycle. Using 630.11(A) and Table 630.11(A) (multiplier 0.71 for 50 percent duty cycle on a non-motor-generator welder), what is the minimum supply conductor ampacity?
Answer: 35.5 A
Supply conductor ampacity for an individual welder is the rated primary current times the duty-cycle multiplier: 50 A x 0.71 = 35.5 A. 50 A ignores the duty cycle, 62.5 A applies a 125 percent continuous-load factor, which is not used for welders, and 25 A applies 50 percent directly instead of 0.71.
Reference: NFPA 70, National Electrical Code, 2026, 630.11(A); Table 630.11(A)
Which of the following describes a Class II location as defined in 500.5?
Answer: A location that is hazardous because of the presence of combustible dust
Section 500.5 groups hazardous locations by the type of material: Class I for flammable gases, flammable liquid-produced vapors and combustible liquid-produced vapors; Class II for combustible dust; and Class III for fibers/flyings. Locations hazardous only under abnormal conditions describe a Division 2, not a class. The divisions describe how likely the hazard is to be present.
Reference: NFPA 70, National Electrical Code, 2026, 500.5
Sources
- Prov: Maine OPOR Candidate Information Bulletin (v1.1, November 9, 2026) (opens in a new tab)
- Maine Office of Professional and Occupational Regulation (opens in a new tab)
- Maine Revised Statutes Title 32, Chapter 17 (electricians) (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.