Requirements at a glance
| Agency | Electricians' Examining Board; exam by Prov |
|---|---|
| Exam | 80 questions, 3 hours, open book, 70% to pass |
| Experience | 8,000 hours as a licensed apprentice plus a 576-hour approved course (including a 45-hour NEC course). Alternatives: 7,000 hours plus a 2-year applied technology high school electrical program, 4,000 hours plus a Maine community college electrical program, or an approved apprenticeship program with 4,000 hours (confirm with the board) |
| Books allowed | 2026 NEC; American Electrician's Handbook 17th ed.; Maine Laws & Rules; Holt's Understanding Electrical Theory (2022) |
| Fees | $90 to Prov; board application and license fees are separate |
Electricians applying to the Maine Electricians' Examining Board for a journeyman license. You need 8,000 hours of experience and a 576-hour approved course (including a 45-hour NEC course) before you test, or one of the shorter school or apprenticeship routes.
Official links
How to get licensed, step by step
Meet the experience and course requirements
Work as a licensed apprentice for 8,000 hours and finish the 576-hour approved course, or qualify through one of the shorter school or apprenticeship routes the board lists.
Maine Office of Professional and Occupational Regulation (opens in a new tab)Maine Revised Statutes Title 32, Chapter 17 (electricians) (opens in a new tab)
Apply to the Electricians' Examining Board
The board reviews your application and approves you to test.
Maine Office of Professional and Occupational Regulation (opens in a new tab)
Schedule with Prov
After the board approves you, book at provexam.com/scheduler (3 Maine centers, or remote through Examroom). If you fail, wait 1 day; there is no attempt limit. You can reschedule free up to 3 days ahead.
Schedule with Prov (opens in a new tab)Prov: Maine OPOR Candidate Information Bulletin (opens in a new tab)
Get licensed
Prov sends your result to the board, which issues the license.
Maine Office of Professional and Occupational Regulation (opens in a new tab)
How to prepare
- Tab your NEC for Chapter 9 tables, Article 310 ampacities, Article 430 motors and Article 250 grounding.
- Motors and controls (11) and wiring and protection (16) are 27 of 80 questions.
- Maine adopted the 2026 NEC effective July 1, 2026 (Ch. 120), keeping 110.16 at the 2023 text. The Prov bulletin prints the 2026 NEC for this exam and the 2023 NEC for limited licenses. Confirm the edition before you buy a book.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2026 NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2026 National Electrical Code (NEC), NFPA 70Essential
Allowed in the exam room. Most of the electrician exam comes from it.
American Electrician's Handbook, 17th Edition
Allowed in the exam room. Tables, formulas and theory for the electrician exams.
Mike Holt's Understanding Electrical Theory for NEC Applications (2022)
Allowed in the exam room. Covers the theory questions.
Official reference list (as published by the testing agency)
- NFPA 70 National Electrical Code, 2026 (open book)
- American Electrician's Handbook, 17th Edition, McGraw Hill (open book)
- Maine Laws & Rules, Office of Professional and Occupational Regulation (open book)
- Mike Holt's Understanding Electrical Theory for NEC Applications, 2022 (open book)
What's on the exam
Official content outline from Prov, Inc. (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Electrical Theory & Principles | 10 | |
| Wiring & Protection | 16 | |
| Service Feeders and Branch Circuits | 5 | |
| Wiring Methods & Materials | 12 | |
| Motors & Controls | 11 | |
| Equipment for General Use | 12 | |
| Special Occupancies | 5 | |
| Special Equipment | 5 | |
| Special Conditions | 2 | |
| Communication Systems | 2 |
Exam day details
- Administered by Prov, Inc. for the Maine Office of Professional and Occupational Regulation.
- Fee: $90 to Prov. Board application and license fees are separate.
- 80 questions in 3 hours; 56 correct (70%) to pass.
- Open book: the four references above are permitted in the exam room.
- The licensing board approves your application first; then you schedule with Prov at a Maine test center or remotely through Examroom.
- If you fail, wait 1 day to retake. There is no limit on attempts. You can reschedule free up to 3 days before your appointment.
Note: The Prov bulletin lists the 2026 NEC for this exam. Maine adopted the 2026 NEC effective July 1, 2026 (Chapter 120), keeping 110.16 at the 2023 text. The Prov bulletin lists the 2023 NEC for the limited house wiring exam, so editions on Prov's pages are mixed. Check the current bulletin before your test date.
Frequently asked questions
What's on the Maine journeyman electrician exam?
80 questions: wiring and protection 16, wiring methods and materials 12, equipment for general use 12, motors and controls 11, general electrical theory 10, service feeders and branch circuits 5, special occupancies 5, special equipment 5, special conditions 2 and communication systems 2.
Which NEC edition does Maine use?
Prov's bulletin lists the 2026 NEC for the journeyman and master exams, and Maine's rule adopts the 2026 NEC for installations from July 1, 2026.
Who gives the exam?
Prov, after the Electricians' Examining Board approves your application.
Free questions with answers
Show all 10 free questions and answers
Three resistors of 15, 25 and 20 ohms are connected in series across a 120-volt source. What is the voltage drop across the 25-ohm resistor?
Answer: 50 volts
Total resistance in series is 15 + 25 + 20 = 60 ohms, so current is 120 / 60 = 2 A. The drop across the 25-ohm resistor is 2 A x 25 ohms = 50 V. 40 V would split the source evenly across three resistors, and 120 V is the whole source voltage, which divides among the resistors.
Reference: Basic electrical theory (Ohm's law and power formulas), Series circuit: E = I x R
A copper equipment grounding conductor is run with feeder conductors protected by a 400-ampere circuit breaker. What is the minimum size of the copper equipment grounding conductor?
Answer: 3 AWG
Table 250.122 lists 3 AWG copper for an overcurrent device rated up to 400 A. 4 AWG is the 300-A row, 2 AWG is the 500-A row, and 1 AWG is the 600-A row. The table is entered by the rating of the device ahead of the equipment, not by the conductor size.
Reference: NFPA 70, National Electrical Code, 2026, Table 250.122
The calculated load for a one-family dwelling is only 62 amperes. What is the minimum rating of the service disconnecting means?
Answer: 100 amperes
Section 230.79(C) requires a one-family dwelling's service disconnecting means to be rated at least 100 A regardless of the calculated load. 60 A is the minimum for installations other than one-family dwellings under 230.79(D). 70 A and 125 A are not Code minimums.
Reference: NFPA 70, National Electrical Code, 2026, Section 230.79(C)
What is the maximum interval at which EMT must be securely fastened, in addition to the rule about fastening near boxes?
Answer: 10 ft
Section 358.30(A) requires EMT to be securely fastened at intervals not exceeding 10 ft and within 3 ft of each outlet box, junction box, cabinet or conduit body termination. 3 ft is the distance from a termination, and 5 ft is permitted only for unbroken lengths where framing does not allow 3 ft fastening.
Reference: NFPA 70, National Electrical Code, 2026, Section 358.30(A)
A 10-hp, 230-volt, three-phase motor has a full-load current of 28 amperes in Table 430.250. What is the maximum rating of an inverse time circuit breaker for the branch-circuit short-circuit and ground-fault protection, using the basic table percentage?
Answer: 70 amperes
Table 430.52(C)(1) permits an inverse time breaker up to 250 percent of the full-load current: 28 x 2.5 = 70 A, which is a standard rating. 50 A would be about 175 percent, and 60 A is a smaller standard size than permitted. 80 A exceeds the 250 percent limit.
Reference: NFPA 70, National Electrical Code, 2026, Table 430.52(C)(1)
A 15-ampere, 125-volt receptacle is installed outdoors in a wet location. Which weatherproof enclosure requirement applies?
Answer: The enclosure must be weatherproof whether or not the attachment plug is inserted
Section 406.9(B)(1) requires 15- and 20-ampere, 125- and 250-volt receptacles in wet locations to have an enclosure that is weatherproof with the attachment plug cap inserted or removed. An outlet box hood must be listed and identified as extra-duty. A cover weatherproof only when closed does not comply.
Reference: NFPA 70, National Electrical Code, 2026, Section 406.9(B)(1)
A new recreational vehicle park is being built. Under Section 551.71(A), at what minimum percentage of the sites must a 50-ampere, 125/250-volt receptacle be provided?
Answer: 40 percent
Section 551.71(A) requires a 20-ampere receptacle at every site, a 30-ampere, 125-volt receptacle at a minimum of 70 percent of sites, and a 50-ampere, 125/250-volt receptacle at a minimum of 40 percent of new sites. 20 percent is the minimum for existing parks, and 70 percent is the 30-ampere requirement.
Reference: NFPA 70, National Electrical Code, 2026, Section 551.71(A)
Under the 2026 NEC pool rules for circuits rated 150 volts or less to ground, up to what rating of three-phase branch circuit does GFCI protection apply to pool equipment?
Answer: 100 amperes
Section 680.5(B) in the 2026 NEC sets Class A GFCI protection for single-phase branch circuits rated up to 60 A and three-phase branch circuits rated up to 100 A on circuits of 150 volts or less to ground. Earlier editions used 60 A for both, which makes 60 A the tempting wrong answer.
Reference: NFPA 70, National Electrical Code, 2026, Section 680.5(B)
A legally required standby generator serves a water treatment plant's pumps. After the utility fails, what is the maximum time before its power must be available?
Answer: 60 seconds
Section 701.12 requires a legally required standby system to supply power within 60 seconds of loss of normal power. The 10 second limit applies to emergency systems under Article 700.
Reference: NFPA 70, National Electrical Code, 2026, Section 701.12
A communications cable passes through a wall that has a fire-resistance rating. How must the opening around the cable be treated?
Answer: Firestopped by an approved method that maintains the wall's fire rating
The spread-of-fire rule requires openings around penetrations through fire-resistant walls, partitions, floors and ceilings to be firestopped using approved methods that maintain the fire-resistance rating. Ordinary foam is not approved unless it is listed for the assembly.
Reference: NFPA 70, National Electrical Code, 2026, Section 800.26
Sources
- Prov: Maine OPOR Candidate Information Bulletin (v1.1, November 9, 2026) (opens in a new tab)
- Maine Office of Professional and Occupational Regulation (opens in a new tab)
- Maine Revised Statutes Title 32, Chapter 17 (electricians) (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.