Requirements at a glance
| Agency | Your Kansas city or county licenses you; the International Code Council (ICC) gives the exam through Pearson VUE. There is no statewide license |
|---|---|
| Experience | Set by your city or county. Sedgwick County/Wichita: 2 years in the field, or 1 year in the field plus 1 year of trade school, for a journeyman certificate |
| Exam | KGG: 50 questions, 3 hours, 75% |
| Books allowed | 2018 International Mechanical Code and 2018 International Fuel Gas Code |
| Fees | $115 per ICC exam (national T-series exams are $120), plus your city or county's certificate or license fees |
HVAC and mechanical workers applying for a journeyman certificate or license from a Kansas city or county that accepts the ICC standard exam, such as Sedgwick County/Wichita or Johnson County.
Official links
How to get licensed, step by step
Ask your city or county which exam it accepts
Kansas law lets each jurisdiction name the standard examinations it accepts as proof of competency. Confirm the exam and the experience rules before you pay.
Sedgwick County MABCD: master and journeyman trade certificates (opens in a new tab)Johnson County Contractor Licensing: exam information (opens in a new tab)Kansas statute K.S.A. 12-1525 (standard examinations) (opens in a new tab)
Register for the journeyman mechanical exam (KGG) with ICC and Pearson VUE
Create an ICC account, pick the Kansas standard exam from the Exam Catalog and schedule a Pearson VUE appointment. If you fail, wait 10 days to retake.
Schedule with Pearson VUE (ICC exams) (opens in a new tab)ICC: State of Kansas exam bulletin (PDF) (opens in a new tab)
Pass at 75% with your books
The exam is open book with four-option multiple choice and no penalty for guessing. Bring only the approved references.
ICC: State of Kansas exam bulletin (PDF) (opens in a new tab)
Apply to your city or county
Send your passing score and proof of experience to the jurisdiction, with its fee. It issues the certificate or license and sets renewal rules.
Sedgwick County MABCD: master and journeyman trade certificates (opens in a new tab)Johnson County Contractor Licensing: exam information (opens in a new tab)
How to prepare
- Study the edition the exam is built on: the 2017 NEC for electrical and the 2018 IPC, IMC and IFGC for plumbing and mechanical. Your city's adopted code can be newer.
- The exam is open book, but there is not time to look up every answer. Tab your books by chapter and table before exam day.
- The 2014 NEC / 2015 I-Code Kansas exams end December 1, 2026. If your jurisdiction wants a 2021-based exam, ask about the national ICC T-series instead.
- Administration (22%) and appliances and mechanical equipment (22%) lead: IMC Chapter 1, Chapter 3 and Chapter 9 (specific appliances).
- Duct systems (16%) and exhaust and ventilation (14%) come from IMC Chapters 4 through 6.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 International Mechanical Code (IMC)Essential
Allowed in the exam room. The core of the mechanical exams: appliances, ducts, exhaust, combustion air and venting.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
2018 International Fuel Gas Code (IFGC)
Allowed in the exam room. Gas piping, sizing tables, combustion air, appliance venting and installation.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
Official reference list (as published by the testing agency)
- 2018 International Mechanical Code (IMC) (allowed in the exam room)
- 2018 International Fuel Gas Code (IFGC) (allowed in the exam room)
What's on the exam
Official content outline from International Code Council (ICC), delivered by Pearson VUE, (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Administration and General Regulations | 22 | |
| Appliances and Mechanical Equipment | 22 | |
| Exhaust and Ventilation Systems | 14 | |
| Duct Systems | 16 | |
| Combustion Air | 8 | |
| Chimneys and Vents | 10 | |
| Fuel Supply Systems | 8 |
The outline totals 100; the other items on the 50-question exam are unscored or unassigned.
Exam day details
- Administered by International Code Council (ICC), delivered by Pearson VUE, for Kansas cities and counties.
- Fee: $115 to ICC through Pearson VUE per exam. Your city or county's license fees are separate.
- 50 multiple-choice questions in 3 hours; 38 correct (75%) to pass.
- Open book: bring the approved references. Questions are four-option multiple choice with no penalty for guessing; 75% to pass.
- Kansas has no statewide electrician, plumber or mechanical license. ICC only tests; the city or county where you want to work sponsors you and issues the license.
- If you fail, wait 10 days to retake.
- The 2014 NEC / 2015 I-Code exams stop being offered December 1, 2026. These Kansas standard exams are based on the 2017 NEC and 2018 I-Codes; the national T-series exams cover the 2020 NEC and 2021 I-Codes.
Frequently asked questions
What's on the Kansas journeyman mechanical exam?
50 questions by weight: administration and general regulations 22%, appliances and mechanical equipment 22%, duct systems 16%, exhaust and ventilation 14%, chimneys and vents 10%, combustion air 8% and fuel supply systems 8%.
Which code books does the Kansas mechanical exam use?
The 2018 International Mechanical Code and the 2018 International Fuel Gas Code.
Does it cover refrigerant handling?
No. Federal EPA 608 certification for refrigerants is a separate exam.
Free questions with answers
Show all 10 free questions and answers
An installer replaces a furnace and starts the work before any permit is issued, with no emergency involved. What additional charge does the IMC say applies to this person?
Answer: A fee of 100 percent of the usual permit fee, added to the permit fees
Section 106.5.1 says a person who begins mechanical work before getting the required permits is subject to 100 percent of the usual permit fee in addition to the permit fees. Only the emergency exception in 106.1 allows the application to follow the work, and then only by the next working business day.
Reference: 2018 International Mechanical Code, Section 106.5.1
A vented wall furnace is being located next to a swinging door. Under IMC Section 909.3, how close may the door swing to an air inlet or outlet of the furnace?
Answer: No closer than 12 inches, and doorstops or closers may not be used to get it
Section 909.3 requires a wall furnace to be located so a door cannot swing within 12 inches of an air inlet or outlet, measured at right angles to the opening. Doorstops or door closers may not be installed to obtain that clearance.
Reference: 2018 International Mechanical Code, Section 909.3
A cooling tower is being sited so its discharge plume does not enter a building. Under IMC Section 908.3, plume discharge must be at least how far from any ventilation inlet to a building?
Answer: 5 feet above or 20 feet away
Section 908.3 locates cooling towers, evaporative condensers and fluid coolers so plumes cannot enter occupied spaces. Plume discharges must be not less than 5 feet above or 20 feet away from any ventilation inlet to a building.
Reference: 2018 International Mechanical Code, Section 908.3
An outdoor air intake is to be located near a loading dock. Under IMC Section 401.4, how far horizontally from a hazardous or noxious contaminant source such as a loading dock or vent must the intake generally be?
Answer: At least 10 feet
Section 401.4 requires outdoor air intakes to be at least 10 feet horizontally from contaminant sources such as vents, streets, alleys, parking lots and loading docks (with limited exceptions), and at least 10 feet from lot lines or buildings on the same lot.
Reference: 2018 International Mechanical Code, Section 401.4
An office space of 2,000 square feet is designed using Table 403.3.1.1 values of 5 people per 1,000 square feet, 5 cfm per person and 0.06 cfm per square foot. Ignoring zone air distribution effectiveness, what is the breathing zone outdoor airflow rate?
Answer: 170 cfm
People: 2,000 / 1,000 x 5 = 10 people; 10 x 5 cfm = 50 cfm. Area: 2,000 x 0.06 = 120 cfm. Total breathing zone outdoor airflow = 50 + 120 = 170 cfm. Using only the area term gives 120, only the people term gives 50.
Reference: 2018 International Mechanical Code, Section 403.3.1.1.1.1 and Table 403.3.1.1
A return air grille is being placed in a room that also contains a gas-fired water heater with a draft hood. Under IMC Section 601.5, how far must the opening be from the draft hood, measured in any direction?
Answer: At least 10 feet
Section 601.5 requires return air openings to be at least 10 feet, measured in any direction, from an open combustion chamber or draft hood of another appliance in the same room or space.
Reference: 2018 International Mechanical Code, Section 601.5
A designer wants to use a stud wall cavity as an air plenum. Which use is prohibited by IMC Section 602.3?
Answer: Using the cavity as a plenum for supply air
Section 602.3 says stud cavities and joist spaces used as plenums may not serve as supply air plenums, may not be part of a fire-resistance-rated assembly, may not convey air from more than one floor, and may not be in outside walls of the building envelope. Return air use in an isolated, fireblocked interior cavity is permitted.
Reference: 2018 International Mechanical Code, Section 602.3
An exterior combustion air intake opening is being installed in a wall. Under IFGC Section 304.11, how far above the adjoining finished ground level must its lowest side be?
Answer: At least 12 inches
Section 304.11 requires combustion air intake openings on the exterior of a building to have the lowest side at least 12 inches vertically above the adjoining finished ground level. Combustion air ducts must also serve a single enclosure and not be screened where they end in an attic.
Reference: 2018 International Fuel Gas Code, Section 304.11
A Type B gas vent serves a draft hood. Under IFGC Section 503.6.6, what is the minimum vertical height of the vent above the draft hood outlet or flue collar?
Answer: 5 feet
Section 503.6.6 requires a Type B or Type L gas vent to terminate at least 5 feet in vertical height above the highest connected appliance draft hood or flue collar. A Type B-W vent must reach 12 feet above the bottom of the wall furnace it serves.
Reference: 2018 International Fuel Gas Code, Section 503.6.6
A buried individual gas line runs to a grill post on a patio. It is approved and not susceptible to physical damage. Under IFGC Section 404.12.1, what is the minimum burial depth below finished grade?
Answer: 8 inches
Section 404.12 requires underground gas piping to be at least 12 inches below grade, but 404.12.1 allows individual lines to outdoor lights, grills and other appliances to be at least 8 inches below finished grade when approved and not susceptible to damage.
Reference: 2018 International Fuel Gas Code, Section 404.12.1
Sources
- ICC: State of Kansas Contractor/Trades Examination Information Bulletin (10/12/2026) (opens in a new tab)
- Pearson VUE: ICC exams (opens in a new tab)
- Sedgwick County MABCD: master and journeyman trade certificates (opens in a new tab)
- Johnson County Contractor Licensing: exam information (opens in a new tab)
Questions last verified November 4, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.