Hawaii licensing exam

Hawaii Journey Worker Plumber Exam: Practice Test & Licensing Guide

The PSI exam for Hawaii's journey worker plumber license: 100 questions on the 2018 UPC covering drainage, water supply, backflow, fixtures, fuel gas, isometrics and plumbing math. Closed book.

Questions
100
Time limit
3 hours
Passing score
70%
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Drain, Waste and Vent Systems, including Pipe Sizing

A small dwelling has one bathroom group (1.6 gpf gravity-tank water closet, lavatory, bathtub with shower), a kitchen sink, a dishwasher with its own independent drain, and a clothes washer standpipe. Using the private values in Table 702.1, what is the total drainage fixture unit load?

Requirements at a glance

AgencyHawaii Board of Electricians and Plumbers (DCCA PVL); exams by PSI
ExperienceAt least 5 years (not less than 10,000 hours) as a journey worker's or master plumber's helper (HRS 448E-5(b))
ExamJourney worker plumber: 100 questions, 3 hours, 70%
Books allowedNone; closed book
Fee$90 to PSI, plus the Board's application and license fees

Plumbers applying for a Hawaii journey worker plumber license from the Board of Electricians and Plumbers.

How to get licensed, step by step

  1. Apply to the Board

    Send the Board of Electricians and Plumbers your application with proof of your experience. You can't register with PSI until it approves you.

    Board of Electricians and Plumbers (opens in a new tab)Hawaii Revised Statutes chapter 448E (electricians and plumbers) (opens in a new tab)Hawaii Administrative Rules 16-80 (electricians and plumbers) (opens in a new tab)

  2. Schedule the journey worker plumber exam with PSI

    Register online or call PSI at 833-333-4754. Your approval is good for 2 years and you can test as often as you like in that time.

    Schedule with PSI (Hawaii trade exams) (opens in a new tab)

  3. Get licensed

    PSI reports your result to the Board; follow the Board's instructions for the license fee and any remaining requirements.

    Board of Electricians and Plumbers (opens in a new tab)

How to prepare

  • Hawaii's trade exams are PSI exams on specific editions: the 2020 NEC, the 2018 UPC, IMC, IFGC and IBC. Hawaii's state electrical code is older than the 2020 NEC, so study to the editions on PSI's bulletin, and check the bulletin again before test day.
  • Contractor exams are closed book except C-13, where PSI provides the NEC. Electrician exams provide the NEC too. Plumber and other contractor exams allow no reference books.
  • General knowledge and regulations (21) is the biggest section; drain, waste and vent and water supply (16 each) follow.
  • Isometrics (6), sewer (6) and plumbing math (6) reward practice: size drains and vents from the UPC tables and work pipe-offset and volume problems.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • Uniform Plumbing Code (UPC), 2018 edition, IAPMO (not allowed in the exam room)
  • Mathematics for Plumbers and Pipefitters, 8th edition, 2013, Delmar Cengage Learning (not allowed)
  • 29 CFR Part 1926 (OSHA construction standards) (not allowed)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Drain, Waste and Vent Systems, including Pipe Sizing16
Water Supply and Distribution, including Pipe Sizing16
Backflow Prevention5
Storm and Roof Drainage3
Fixtures and Water Heaters10
General Knowledge and Regulations21
Fuel Gas Systems, including Pipe Sizing8
Safety OSHA3
Isometrics6
Sewer6
Plumbing Math6

Exam day details

  • Administered by PSI Services for the Hawaii Board of Electricians and Plumbers.
  • Fee: $90 to PSI. Board application and license fees are separate.
  • 100 scored questions in 3 hours; 70 correct (70%) to pass. The exam is closed book.
  • The Board must approve your application before you can register with PSI. Your eligibility lasts 2 years, and you can test as often as you like within it.
  • PSI may add up to 10 unscored pretest questions; they do not count against your time.
  • PSI provides an online calculator, or you can bring a silent, non-programmable one.

Frequently asked questions

What's on the Hawaii journey worker plumber exam?

100 scored questions: general knowledge and regulations 21, drain, waste and vent 16, water supply and distribution 16, fixtures and water heaters 10, fuel gas 8, isometrics 6, sewer 6, plumbing math 6, backflow prevention 5, storm and roof drainage 3 and safety 3.

Which code edition is on the exam?

The 2018 Uniform Plumbing Code (IAPMO).

Can I bring books?

No. The exam is closed book and personal reference material stays in storage.

Free questions with answers

Show all 10 free questions and answers
  1. A small dwelling has one bathroom group (1.6 gpf gravity-tank water closet, lavatory, bathtub with shower), a kitchen sink, a dishwasher with its own independent drain, and a clothes washer standpipe. Using the private values in Table 702.1, what is the total drainage fixture unit load?

    Answer: 13

    Private values from Table 702.1: water closet 3, lavatory 1, bathtub/shower 2 (bath group 6), kitchen sink 2, dishwasher 2, clothes washer standpipe 3. Total = 6 + 2 + 2 + 3 = 13. Leaving out the dishwasher gives 11, and leaving out the washer gives 10.

    Reference: 2018 Uniform Plumbing Code, Table 702.1

  2. What type of strainer must a roof drain have, other than flat strainers permitted on sun decks and parking decks that are regularly maintained?

    Answer: A dome strainer

    Section 1102.2 requires roof drains to have domed strainers. The exception allows flat-surface strainers level with the deck on sun decks, parking decks and similar areas that are normally serviced and maintained.

    Reference: 2018 Uniform Plumbing Code, Section 1102.2

  3. Where is an abandoned building (house) sewer required to be plugged or capped?

    Answer: Within 5 feet of the property line

    Section 722.1 requires an abandoned building sewer, or part of it, to be plugged or capped in an approved manner within 5 feet of the property line.

    Reference: 2018 Uniform Plumbing Code, Section 722.1

  4. A two-story house has a second-floor bath group (water closet, lavatory, bathtub) and a first-floor bath group of the same fixtures, a kitchen sink, and a clothes washer standpipe, all discharging to one building drain laid at 1/4 inch per foot. Using Table 702.1 private values (water closet 3, lavatory 1, bathtub 2, kitchen sink 2, washer 3) and Table 703.2, what is the smallest building drain size?

    Answer: 3 inches

    Load = 6 + 6 + 2 + 3 = 17 drainage fixture units with two water closets. Table 703.2 allows 8 units on a 2 inch horizontal drain, which is too small, and 35 units on a 3 inch drain with no more than three water closets. Three inches is the smallest.

    Reference: 2018 Uniform Plumbing Code, Table 702.1 and Table 703.2

  5. The water main cannot provide at least how much residual pressure, after friction and other losses, before the UPC requires a tank and pump or other approved system?

    Answer: 15 psi

    Section 608.1 requires a tank and pump or other approved means where the residual pressure from the main would be less than 15 psi after allowing for friction and other losses. Eight psi is the flush tank residual used in sizing, not the Section 608.1 trigger.

    Reference: 2018 Uniform Plumbing Code, Section 608.1

  6. A hose bibb on the outside of a building is protected by an atmospheric vacuum breaker rather than a hose bibb type device. How must the vacuum breaker be installed?

    Answer: At least 6 inches above the highest point of use, on the discharge side of the last valve

    Section 603.5.7 allows an atmospheric vacuum breaker for outlets with hose attachments if it is installed not less than 6 inches above the highest point of usage and on the discharge side of the last valve.

    Reference: 2018 Uniform Plumbing Code, Section 603.5.7

  7. A shower receptor has a finished curb. Measured from the top of the curb to the top of the drain, what depth is the curb required to have?

    Answer: At least 2 inches and not more than 9 inches

    Section 408.5 requires the dam, curb or threshold to be at least 1 inch lower than the sides and back of the receptor, and in no case less than 2 inches or more than 9 inches in depth measured from the top of the dam to the top of the drain.

    Reference: 2018 Uniform Plumbing Code, Section 408.5

  8. A gas outlet is roughed in, but the appliance will not be connected for several weeks. How must the outlet be left?

    Answer: Closed gastight with a threaded plug or cap until the appliance is connected

    Section 1210.7.1 requires each outlet, including a valve, to be closed gastight with a threaded plug or cap immediately after installation and left closed until the appliance or equipment is connected.

    Reference: 2018 Uniform Plumbing Code, Section 1210.7.1

  9. A cylindrical storage tank is 3 feet in diameter and 5 feet tall. Using pi = 3.1416 and 7.48 gallons per cubic foot, how many gallons does it hold when full?

    Answer: 264 gallons

    Radius = 1.5 ft. Volume = 3.1416 x 1.5 x 1.5 x 5 = 35.34 cubic feet. Gallons = 35.34 x 7.48 = 264 gallons. Using the diameter as the radius gives 1,057 gallons, stopping at cubic feet gives 35, and using a 0.75 ft radius gives 66.

    Reference: Mathematics for Plumbers and Pipefitters, 8th edition, General practice: volume of a cylinder and 7.48 gal/ft3

  10. A permit expired because work was suspended for more than 180 days but less than one year. No changes will be made to the original construction documents. What fee is required for the new permit before work resumes?

    Answer: One-half of the amount required for a new permit

    Section 104.4.3 requires a new permit before the work is recommenced, at one-half the amount required for a new permit, provided no changes have been or will be made to the original construction documents and the suspension did not exceed one year.

    Reference: 2018 Uniform Plumbing Code, Section 104.4.3

Sources

Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.