Requirements at a glance
| Agency | Georgia Construction Industry Licensing Board (Division of Low Voltage Contractors); exams by PSI |
|---|---|
| Experience | At least 1 year of low-voltage wiring experience in the license category; electronics coursework counts for up to 6 months (Rule 121-3-.06(4)) |
| Exam | 90 questions, 4 hours, open book, 70 to pass (Alarm, General and Telecommunications are shorter exams from the same outline) |
| Books allowed | 2023 NEC, NFPA 72 (2016), NFPA 101 (2015), UL 681 and UL 1076 (2018), BICSI TDMM 13th Edition, the NASCLA Georgia guide, IRS Circular E, 29 CFR 1926 and the ADA employer guide |
| Fees | $40 application fee ($30 plus a $10 processing fee) per the Secretary of State form. The PSI exam fee and license fee are not published in the candidate bulletin; confirm them with PSI and the Board. |
Qualifying agents for an unrestricted Georgia low voltage contractor license from the Construction Industry Licensing Board. Applicants need at least 1 year of low-voltage wiring experience in the license category (Rule 121-3-.06(4)); electronics coursework counts for up to 6 months. The Alarm, General and Telecommunications licenses use shorter exams from the same outline.
Official links
How to get licensed, step by step
Apply to the Board
Submit the application, three references on the Board's form and the $40 fee to the Construction Industry Licensing Board (Macon; (404) 424-9966). The Board must approve you before you can register with PSI.
Georgia Division of Low Voltage Contractors (CILB) (opens in a new tab)Georgia Rules 121-3 (CILB license requirements) (opens in a new tab)
Register with PSI
After approval, register and pay PSI online or at 855-898-0711. Bring the allowed references and a silent, non-programmable calculator.
Schedule with PSI (Georgia CILB exams) (opens in a new tab)PSI bulletin: Georgia low voltage contractors (opens in a new tab)
Take the exam
Scaled score, 70 to pass. If you fail twice, the PSI bulletin requires a Board-approved review course before a third attempt.
PSI bulletin: Georgia low voltage contractors (opens in a new tab)
Finish licensing
Send your results and the license fee to the Board.
Georgia Division of Low Voltage Contractors (CILB) (opens in a new tab)
How to prepare
- Georgia's exams are scaled with 70 to pass. The Board's 2026 reference lists apply to exams through December 31, 2026; check for the updated list if you test later.
- Tab your books with permanent tabs before exam day. Highlighting and underlining are allowed; notes, sticky flags and loose papers are not.
- Interior cable (20), regulations (19) and exterior cable (18) are 57 of the 90 questions.
- Know NEC Chapter 7 and 8 rules for communications and fire alarm circuits, and NFPA 72 for alarm systems.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2023 NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2023 Edition (or the NEC Handbook), with Georgia amendmentsEssential
Allowed in the exam room. The Georgia State Electrical Code. Tab Articles 100, 110, 210, 220, 230, 240, 250, 310, 430, 450 and Chapter 9.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
NFPA 72 (2016) National Fire Alarm Code and NFPA 101 (2015) Life Safety Code
On the low voltage list for the alarm and unrestricted licenses.
BICSI Telecommunications Distribution Methods Manual (TDMM), 13th Edition
On the low voltage list for the telecommunications and unrestricted licenses. Cable distribution and pathways.
Contractors Guide to Business, Law, and Project Management: Georgia Construction Industry Licensing Board, 5th Edition (NASCLA)
On the Board's reference lists for the electrical, conditioned air and plumbing exams.
Ugly's Electrical References, 2023 Edition
On the electrical and low voltage lists. Formulas for voltage drop, power, motors and transformers.
Official reference list (as published by the testing agency)
- Georgia State Electrical Code: 2023 NEC or NEC Handbook with Georgia amendments (NFPA 70)
- NFPA 72 (2016), National Fire Alarm Code, and NFPA 101 (2015), Life Safety Code
- UL 681 (2018) and UL 1076 (2018)
- BICSI Telecommunications Distribution Methods Manual, 13th Edition
- Contractors Guide to Business, Law, and Project Management, Georgia Construction Industry Licensing Board, 5th Edition (NASCLA)
- Employer's Tax Guide (IRS Circular E), 29 CFR Part 1926 (OSHA), ADA employer guide (EEOC), Printreading Based on 2020 NEC and Ugly's Electrical References, 2023 (the PSI list is the authority)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Laws | 4 | |
| Regulations | 19 | |
| Read Blueprints | 10 | |
| Distribution Methods | 14 | |
| Interior Cable | 20 | |
| Exterior Cable | 18 | |
| Documentation | 5 |
Exam day details
- Administered by PSI Services for the Georgia Construction Industry Licensing Board.
- Fee: The Board's initial application fee is $40 ($30 plus a $10 processing fee). The PSI exam fee and the license fee are not published in the candidate bulletin, so check PSI and the Board before you apply.
- 90 scored questions plus 15 unscored pretest questions in 4 hours.
- Open book: only the references on the Board's list are allowed. The unrestricted license uses all eight references on the list.
- The Alarm (75 questions), General (50) and Telecommunications (75) exams come from the same outline, so this bank also prepares you for them.
- The Board must approve your application before you can register with PSI. Scores are scaled and you need 70 to pass.
- The time limit includes the unscored beta (pretest) questions mixed into the exam.
- If you fail twice, the PSI bulletin requires a Board-approved review course before a third attempt.
- Georgia has no statewide journeyman or master electrician exam and no statewide HVAC technician exam; local jurisdictions license those workers.
Frequently asked questions
What's on the Georgia unrestricted low voltage exam?
90 scored questions: interior cable 20, regulations 19, exterior cable 18, distribution methods 14, reading blueprints 10, documentation 5 and laws 4.
Is there a separate exam for alarm and telecommunications?
Yes. Alarm (75 questions), General (50), Telecommunications (75) and Unrestricted (90) are separate exams with a 4-hour limit, all built from the same outline.
Which NEC edition is on the exam?
The 2023 NEC (or the NEC Handbook) with Georgia amendments, per the Board's 2026 reference list.
Free questions with answers
Show all 10 free questions and answers
A low voltage contractor pays an installer a gross weekly wage of $1,200. Using the employer rates in the Employer's Tax Guide, what is the employer's own share of social security and Medicare tax on that wage?
Answer: $91.80 (6.2% social security plus 1.45% Medicare, which is 7.65% of $1,200)
The employer pays 6.2% for social security plus 1.45% for Medicare, a combined 7.65%: 1,200 x 0.0765 = $91.80. The employee pays a matching 7.65% that is withheld from pay. $74.40 omits Medicare, $183.60 doubles the rate, and $17.40 omits social security.
Reference: IRS Publication 15 (Circular E), Employer's Tax Guide, Section 'Social Security and Medicare Taxes' (employer and employee rates)
A technician installs a conduit run on a flat roof that has no parapet or guardrail, and the work surface is 12 feet above the level below. Under OSHA's construction fall protection rule, what is required at this height?
Answer: A guardrail, safety net or personal fall arrest system, because the trigger height is 6 feet
29 CFR 1926.501(b)(1) requires fall protection for employees on an unprotected side or edge 6 feet or more above a lower level, using guardrails, safety nets or a personal fall arrest system. The 15-foot and warning-line answers use values that belong to other settings, and a hard hat is not fall protection.
Reference: 29 CFR Part 1926 (OSHA construction standards), 1926.501(b)(1)
An employee on a low voltage job dies from a fall. By when must the employer report the work-related fatality to OSHA?
Answer: Within 8 hours of learning of the death
29 CFR 1904.39(a)(1) requires an employer to report a work-related fatality to OSHA within 8 hours of learning of it. The 24-hour limit applies to in-patient hospitalizations, amputations and loss of an eye, and the seven-day limit is for recording the case on the injury log.
Reference: 29 CFR Part 1904 (OSHA recordkeeping and reporting), 1904.39(a)(1)
On a floor plan drawn at 1/4 inch = 1 foot, a cable route measures 5-3/8 inches with an architect's rule. What is the actual horizontal length of the route?
Answer: 21.5 feet (5.375 in x 4 ft per inch)
At 1/4 inch = 1 foot, each inch of drawing is 4 feet: 5.375 x 4 = 21.5 feet. Using the 1/8 scale gives 43 feet, using 3 per inch gives about 16.1 feet, and 5.4 feet ignores the scale.
Reference: General low voltage trade practice, Plan scale and measuring cable runs
A technician must run alarm circuit conduit into a Class I, Division 1 location. Which wiring method is generally acceptable there?
Answer: Threaded rigid metal conduit
Class I, Division 1 wiring methods are limited to threaded rigid metal conduit, threaded steel intermediate metal conduit, Type MI cable and certain listed cables with fittings (Section 501.10(A)). EMT, nonmetallic-sheathed cable and nonmetallic flexible conduit are not permitted in Division 1.
Reference: NEC 2023 (NFPA 70), Section 501.10(A)
A power-limited fire alarm cable will be run exposed above a hung ceiling that is used as a return-air plenum, with no raceway. Which cable type is required?
Answer: Type FPLP plenum-rated cable
Power-limited fire alarm cable in ducts, plenums and other air-handling spaces must be listed plenum cable, Type FPLP, unless it is installed in a suitable metal raceway (Section 760.154). FPLR is the riser type and FPL is general purpose, so neither is listed for plenum use. There is no 'NPLFA-R' cable type.
Reference: NEC 2023 (NFPA 70), Section 760.154 (listed PLFA cable applications)
A technician wants to staple unshielded Cat 6 cable on a wall right next to open 120 volt branch-circuit conductors that are not in a raceway or metal-sheathed cable. What minimum separation does the NEC require between them?
Answer: 2 inches (50 mm)
Section 800.133(B) requires communications cables to be separated at least 50 mm (2 in.) from electric light, power, Class 1 and non-power-limited fire alarm conductors, unless the power conductors are in a raceway or metal-sheathed or similar cable or a permanent barrier is used. 1/4 inch is a figure for specific enclosure cases, not for open wiring.
Reference: NEC 2023 (NFPA 70), Section 800.133(B)
A crew plans to trench for direct-buried alarm cable across a customer's front yard. What must the crew do before any digging starts?
Answer: Notify Georgia 811 so that utility owners can mark underground facilities
Georgia law requires excavators to notify the utility protection center (Georgia 811) before digging so facility owners can mark their underground lines. Customers do not always know the layout, random probing does not find lines, and all utility types are marked through the one-call system.
Reference: Georgia Utility Facility Protection Act, O.C.G.A. 25-9 (Georgia 811 Dig Law text), O.C.G.A. 25-9-6(a) (locate request before excavating)
A crew has dug a 5-foot-deep trench for conduit. Where should the excavated soil (spoil) be placed?
Answer: At least 2 feet from the edge of the excavation
29 CFR 1926.651(j)(2) requires excavated or other materials to be kept at least 2 feet from the edge of the excavation, or to be restrained by retaining devices, so material does not fall in on workers. Closer piles add load at the edge and risk a cave-in.
Reference: 29 CFR Part 1926 (OSHA construction standards), 1926.651(j)(2)
A contractor finishes a camera installation in which three cable routes were changed from the original plan. What documentation should reflect these changes?
Answer: As-built drawings that show the installed cable routes and device locations
As-built (record) drawings document how the system was actually installed, including route changes, so later service and additions can be made. The bid drawings, shipping documents and permit application show planned or purchased items only.
Reference: General low voltage trade practice, Documentation: as-built drawings
Sources
- PSI: Georgia Low Voltage Contractors Candidate Information Bulletin (opens in a new tab)
- Georgia State Board of Low Voltage Contractors (Secretary of State) (opens in a new tab)
- Georgia Rules 121-3 (Construction Industry Licensing Board) (opens in a new tab)
Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.