The ECLB technical exam for unlimited electrical contractors: 100 questions on the 2023 NEC, plan reading, special occupancies, life safety and alarms. Open book, 75% to pass.

Questions
100
Time limit
5 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Alarms/Limited Energy

A new fire alarm control panel is being connected in a tenant space. Which statement describes the branch circuit that feeds the panel?

Requirements at a glance

AgencyFlorida DBPR, Electrical Contractors' Licensing Board (ECLB); Pearson VUE delivers the exams
ExamsElectrical Business plus Unlimited Electrical technical (100 questions, 5 hours, 75%)
Books allowed2023 NEC, NFPA 72 (2019), NFPA 101 (2018), NFPA 780 (2017) and 29 CFR 1926, 1910 and 1904
Fees$196 application and $67.25 exam fee to DBPR, plus Pearson VUE ($82.50 technical, $41.25 business); $291 certification fee after you pass. Rule 61G6-8.001

Candidates for ECLB certification as an unlimited electrical contractor, in addition to the Electrical Business exam.

How to get licensed, step by step

  1. Apply to the ECLB

    Submit your application and experience documentation to DBPR. Confirm the current experience requirements on the DBPR page.

    Florida DBPR: electrical examinations (ECLB) (opens in a new tab)Florida Statutes Chapter 489 (contracting) (opens in a new tab)

  2. Schedule with Pearson VUE

    After DBPR approves you, schedule the exam with Pearson VUE. Passing is 75%.

    Pearson VUE: Florida electrical exams (opens in a new tab)

  3. Finish licensing

    Send your results to DBPR and complete the remaining license requirements such as insurance and financial responsibility.

    Florida DBPR: electrical examinations (ECLB) (opens in a new tab)

How to prepare

  • The exams are open book, but only the approved, bound references on the January 2026 to December 2026 list are allowed. Underline or highlight, but no handwritten notes and no loose tabs.
  • Florida uses the 2023 NEC until August 21, 2027, then the 2026 NEC.
  • General theory (19 to 21 questions) and alarms and limited energy (14 to 16) are the biggest sections. Tab NEC Chapter 7 and 8 and NFPA 72.
  • Wiring and protection, wiring methods and special occupancies are about 13 to 15 questions each: tab NEC Chapters 3 and 5.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • NFPA 70: National Electrical Code (NEC), 2023 edition
  • NFPA 72 (2019), NFPA 101 (2018) and NFPA 780 (2017)
  • 29 CFR Parts 1926, 1910 and 1904 (OSHA)

What's on the exam

Official content outline from Pearson VUE (number of questions per topic):

TopicQuestions
General Theory and Electrical Principles20
Plan and Specification Reading8
Wiring and Protection14
Wiring Methods and Materials12
Special Occupancies14
OSHA, Safety, Testing, Tools9
Life Safety and ADA5
Signs, Outline Lighting, Structural3
Alarms/Limited Energy15

Exam day details

  • Administered by Pearson VUE for the Florida Electrical Contractors' Licensing Board (ECLB).
  • Fee: $196 application fee and $67.25 exam fee to DBPR, plus Pearson VUE's administration fee: $82.50 for the technical/safety exam and $41.25 for the business exam. After you pass, the certification fee is $291 plus a $5 unlicensed-activity fee.
  • 100 questions in 5 hours; 75% to pass. The board publishes the topics as ranges of questions; the weights here are the midpoints.
  • Florida uses the 2023 NEC until August 21, 2027, and then the 2026 NEC. NFPA 72 moves to the 2025 edition on the 2027 list.
  • Open book with approved references only. They must be bound and stay bound; underlining and highlighting are allowed, handwritten notes and loose tabs are not. The reference lists change each January.
  • A score of 75% is required to pass. Questions are equally weighted and pretest items are not scored.
  • DBPR approves your application first, then Pearson VUE schedules and delivers the exam.
  • Electrical contractor candidates take a business exam and a technical exam.
  • Fees are set by Board rule (61G6-8.001) and DBPR's test-administration fee table; confirm the current amounts with DBPR before you apply.

Frequently asked questions

What is on the Florida unlimited electrical exam?

General theory 19 to 21 questions, alarms and limited energy 14 to 16, wiring and protection 13 to 15, special occupancies 13 to 15, wiring methods and materials 11 to 13, OSHA and safety 8 to 10, plan reading 7 to 9, life safety and ADA 4 to 6, and signs, outline lighting and structural 2 to 4.

Which NEC edition does Florida use?

The 2023 NEC until August 21, 2027, after which the 2026 NEC applies.

Free questions with answers

Show all 10 free questions and answers
  1. A new fire alarm control panel is being connected in a tenant space. Which statement describes the branch circuit that feeds the panel?

    Answer: It serves no other loads and is not supplied through a ground-fault or arc-fault circuit interrupter

    760.121(B) requires the fire alarm branch circuit to supply no other loads and prohibits supplying it through GFCI or AFCI devices, because a nuisance trip would silently disable the system. Sharing the circuit with receptacles or lighting breaks the no-other-loads rule however lightly it is loaded.

    Reference: NEC 2023 (NFPA 70), 760.121(B)(1) and (B)(2)

  2. A 240-volt circuit feeds a resistive load with a resistance of 12 ohms. What current flows?

    Answer: 20 amperes

    Ohm's law: I = E / R = 240 V / 12 ohms = 20 A. Multiplying (240 x 12 = 2,880) or adding (240 + 12 = 252) the numbers, or inverting the fraction (12/240 = 0.05), are the usual mistakes.

    Reference: Basic electrical theory (Ohm's law and the power formula), I = E / R

  3. A 12-ohm resistor and a 24-ohm resistor are connected in parallel. What is the equivalent resistance?

    Answer: 8 ohms

    For two parallel resistors, R = (R1 x R2) / (R1 + R2) = (12 x 24) / (12 + 24) = 288 / 36 = 8 ohms. Adding them gives the series value of 36 ohms, averaging gives 18 ohms, and 6 ohms is half of the smaller resistor.

    Reference: Basic electrical theory (Ohm's law and the power formula), Parallel circuit: R = (R1 x R2) / (R1 + R2)

  4. A service uses 500 kcmil copper ungrounded conductors, and the grounding electrode conductor runs to a metal underground water pipe electrode. What is the minimum size copper grounding electrode conductor?

    Answer: 1/0 AWG

    Table 250.66 requires 1/0 AWG copper for service conductors over 350 kcmil through 600 kcmil. 2 AWG is the value for over 3/0 through 350 kcmil, which is one size range too small. 2/0 AWG is above what the table requires for this size range.

    Reference: NEC 2023 (NFPA 70), 250.66 and Table 250.66

  5. A 250-ft straight run of PVC conduit is exposed to sunlight and will see an 80 degree F temperature change. Table 352.44 gives 3.24 in. of expansion per 100 ft for an 80 degree F change. How much expansion must the fittings accommodate?

    Answer: 8.10 in.

    Scale the table value to the run length: 3.24 in. per 100 ft x 2.5 = 8.10 in. Using 3.24 in. ignores length, 6.48 in. uses 200 ft and 12.96 in. uses 400 ft.

    Reference: NEC 2023 (NFPA 70), Table 352.44 and 352.44

  6. A standby generator is rated 30,000 volt-amperes at 240 volts single phase. What is the minimum ampacity of the conductors from the generator terminals to the first distribution device?

    Answer: 143.8 amperes

    Nameplate current = 30,000 / 240 = 125 A. 445.13(A) requires conductors from generator terminals to the first distribution device to have at least 115 percent of that current: 125 x 1.15 = 143.8 A. 125 A applies no factor, 156.3 A uses 125 percent and 187.5 A uses 150 percent.

    Reference: NEC 2023 (NFPA 70), 445.13(A)

  7. At a construction site, 120-volt, 15- and 20-ampere temporary receptacle outlets that are not part of the building's permanent wiring are in use by employees. How must employees be protected under 29 CFR 1926.404(b)(1)?

    Answer: With approved GFCIs, or with an assured equipment grounding conductor program

    1926.404(b)(1)(i) requires the employer to use either GFCIs meeting (b)(1)(ii) or an assured equipment grounding conductor program meeting (b)(1)(iii) on construction sites, in addition to any equipment grounding conductor requirements. AFCIs, megger tests, isolation transformers and warning signs are not the options the rule offers.

    Reference: 29 CFR Part 1926 (OSHA construction standards), 1926.404(b)(1)(i) through (iii)

  8. An electrical contractor is mounting a wall switch that is an operable part and must be reachable from a wheelchair with an unobstructed forward reach. What is the allowable height range above the finish floor?

    Answer: 15 in. minimum to 48 in. maximum

    ADA 308.2.1 sets the unobstructed forward reach at 48 in. maximum high and 15 in. minimum low above the finish floor or ground. Operable parts must fall within these ranges under 309.3.

    Reference: 2010 ADA Standards for Accessible Design, 308.2.1 and 309.3

  9. A conduit takeoff shows 30 ft of horizontal run scaled from the plan plus two vertical drops of 9 ft each taken from the elevation. The estimator adds 10 percent for waste and fittings. How much conduit should be priced, to the nearest foot?

    Answer: 53 ft

    Total run = 30 + 9 + 9 = 48 ft. Adding 10 percent: 48 x 1.10 = 52.8 ft, which rounds up to 53 ft. 48 ft omits the allowance, 30 ft omits the drops, and 58 ft adds the allowance twice.

    Reference: Construction plan reading and estimating, Material takeoff from plans and elevations

  10. Which disconnect arrangement meets 600.6 for a 240-volt, two-wire sign circuit?

    Answer: An externally operable breaker opening both ungrounded conductors, serving only that sign

    600.6 requires each sign and its feeder or branch circuit to be controlled by an externally operable switch or circuit breaker that opens all ungrounded conductors and controls no other load. A switch behind the sign face is not externally operable, and a single pole leaves one ungrounded conductor energized.

    Reference: NEC 2023 (NFPA 70), 600.6