Requirements at a glance
| Agency | Florida DBPR, Electrical Contractors' Licensing Board (ECLB); Pearson VUE delivers the exams |
|---|---|
| Exams | Electrical Business plus Residential Electrical technical (100 questions, 5 hours, 75%) |
| Books allowed | 2023 NEC, 29 CFR 1926, 1910 and 1904 and the Contractors Manual |
| Fees | $196 application and $67.25 exam fee to DBPR, plus Pearson VUE ($82.50 technical, $41.25 business); $291 certification fee after you pass. Rule 61G6-8.001 |
Candidates for ECLB certification as a residential electrical contractor, in addition to the Electrical Business exam.
Official links
How to get licensed, step by step
Apply to the ECLB
Submit your application and experience documentation to DBPR. Confirm the current experience requirements on the DBPR page.
Florida DBPR: electrical examinations (ECLB) (opens in a new tab)Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Schedule with Pearson VUE
After DBPR approves you, schedule the exam with Pearson VUE. Passing is 75%.
Finish licensing
Send your results to DBPR and complete the remaining license requirements such as insurance and financial responsibility.
Florida DBPR: electrical examinations (ECLB) (opens in a new tab)
How to prepare
- The exams are open book, but only the approved, bound references on the January 2026 to December 2026 list are allowed. Underline or highlight, but no handwritten notes and no loose tabs.
- Florida uses the 2023 NEC until August 21, 2027, then the 2026 NEC.
- Nearly half of the exam is calculations: demand, neutral and appliance loads, service sizing, box fill, conduit fill and voltage drop. Practice with NEC Article 220 and Chapter 9.
- Plan reading and general theory are each about 13 to 15 questions.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC and the Contractors Manual. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2023 EditionEssential
Allowed in the exam room. Florida uses the 2023 NEC until August 21, 2027.
NFPA store (opens in a new tab)Read free (NFPA) (opens in a new tab)
Contractors Manual, Association of Builders and Contractors Institute (ABC)Essential
On the Business and Finance, general contractor and electrical business reference lists. The 2025 edition is used from February 1, 2026.
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code (NEC), 2023 edition
- 29 CFR Parts 1926, 1910 and 1904 (OSHA)
- Contractors Manual, Association of Builders and Contractors Institute
What's on the exam
Official content outline from Pearson VUE (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Theory | 14 | |
| Plan Reading | 13 | |
| Wiring and Protection | 7 | |
| OSHA/Safety | 9 | |
| Residential Life Safety and ADA | 5 | |
| Motors | 5 | |
| Box Fill | 5 | |
| Demand Loads | 6 | |
| Conduit Fill | 3 | |
| Grounding Conductors | 8 | |
| Neutral Loads | 4 | |
| Appliance Loads | 7 | |
| Service | 9 | |
| Voltage Drop | 5 |
Exam day details
- Administered by Pearson VUE for the Florida Electrical Contractors' Licensing Board (ECLB).
- Fee: $196 application fee and $67.25 exam fee to DBPR, plus Pearson VUE's administration fee: $82.50 for the technical/safety exam and $41.25 for the business exam. After you pass, the certification fee is $291 plus a $5 unlicensed-activity fee.
- 100 questions in 5 hours; 75% to pass. The board publishes the topics as ranges of questions; the weights here are the midpoints.
- Many questions are calculations: box fill, conduit fill, demand, neutral and appliance loads, service sizing and voltage drop.
- Florida uses the 2023 NEC until August 21, 2027, and then the 2026 NEC.
- Open book with approved references only. They must be bound and stay bound; underlining and highlighting are allowed, handwritten notes and loose tabs are not. The reference lists change each January.
- A score of 75% is required to pass. Questions are equally weighted and pretest items are not scored.
- DBPR approves your application first, then Pearson VUE schedules and delivers the exam.
- Electrical contractor candidates take a business exam and a technical exam.
- Fees are set by Board rule (61G6-8.001) and DBPR's test-administration fee table; confirm the current amounts with DBPR before you apply.
Frequently asked questions
What is on the Florida residential electrical exam?
General theory 13 to 15 questions, plan reading 12 to 14, OSHA and safety 8 to 10, service 8 to 10, grounding conductors 7 to 9, wiring and protection 6 to 8 and appliance loads 6 to 8. Demand loads, motors, box fill, life safety, neutral loads, voltage drop and conduit fill make up the rest.
What can a residential electrical contractor do?
The license is limited to residential work. See the Florida licensing page of the ECLB for the exact scope.
Free questions with answers
Show all 10 free questions and answers
Standard-method service calculation for a one-family dwelling at 120/240 volts, single phase: general lighting, small-appliance and laundry demand 5,415 VA; one 12-kW range (8,000 VA demand); one 5,500 W dryer; four fixed appliances (dishwasher 1,200 VA, disposer 900 VA, water heater 4,500 VA, trash compactor 600 VA); one 3,600 VA air conditioner with no electric heat. What is the calculated load in amperes?
Answer: 116.3 amperes
Fixed appliances: 1,200 + 900 + 4,500 + 600 = 7,200 VA x 0.75 = 5,400 VA. Total: 5,415 + 8,000 + 5,500 + 5,400 + 3,600 = 27,915 VA. Divided by 240 V = 116.3 A. 123.8 A omits the 75 percent factor on the appliances, 133.0 A uses the 12 kW range at 100 percent, and 135.0 A leaves out the lighting demand factor (uses 9,900 VA).
Reference: NEC 2023 (NFPA 70), 220.52, 220.53, 220.54, Table 220.55 and 220.60
A 2-horsepower, 230-volt, single-phase motor has a nameplate full-load current of 10.4 amperes. Table 430.248 lists 12 amperes for this rating. What is the minimum ampacity of the branch-circuit conductors?
Answer: 15.0 amperes
430.6(A)(1) requires the table full-load current to size conductors, and 430.22 requires 125 percent: 12 x 1.25 = 15.0 A. 13.0 A uses the nameplate, 12.0 A applies no 125 percent, and 30.0 A is the 250 percent short-circuit protection value.
Reference: NEC 2023 (NFPA 70), 430.6(A)(1), Table 430.248 and 430.22
A one-family dwelling has a 200-ampere service using 4/0 AWG aluminum service-entrance conductors. Using Table 250.66, what is the smallest copper grounding electrode conductor to a metal underground water pipe electrode?
Answer: 4 AWG
In Table 250.66 the aluminum row for 4/0 AWG or 250 kcmil lines up with a 4 AWG copper grounding electrode conductor. 2 AWG is the result of reading the table as if the conductors were 4/0 copper, which lands in the next row. 6 and 8 AWG are the rows for smaller service conductors.
Reference: NEC 2023 (NFPA 70), Table 250.66
A new one-family dwelling is being wired under the 2023 NEC. What does 230.85 require for the emergency disconnect?
Answer: A readily accessible outdoor disconnect marked as an emergency disconnect
230.85 requires one- and two-family dwelling units to have an emergency disconnect, installed in a readily accessible outdoor location, with all service conductors terminating in it, and marked as an emergency disconnect. It can be the service disconnect itself, a meter disconnect or another listed device, and it applies regardless of service size.
Reference: NEC 2023 (NFPA 70), 230.85
A 4,500-watt, 240-volt storage-type water heater of 80-gallon capacity is installed in a dwelling. Treating it as a continuous load, what is the minimum ampacity of the branch-circuit conductors?
Answer: 23.4 amperes
Rated current: 4,500 / 240 = 18.75 A. 422.13 treats a storage-type water heater of 120 gallons or less as a continuous load, so the circuit is sized at 125 percent: 18.75 x 1.25 = 23.4 A. 18.8 A skips the 125 percent, 28.1 A uses 150 percent and 37.5 A uses 200 percent.
Reference: NEC 2023 (NFPA 70), 422.13 and 422.10(A)
Type NM cable passes through holes bored in wood studs. What is the minimum distance from the edge of the stud to the nearest edge of the hole, unless a steel plate is used?
Answer: 1 1/4 inches
300.4(A)(1) requires bored holes to be at least 1 1/4 inch from the nearest edge of the framing member. If that distance cannot be kept, the cable must be protected by a steel plate or bushing at least 1/16 inch thick. The other distances are not the Code minimum.
Reference: NEC 2023 (NFPA 70), 300.4(A)(1)
A new house has an attached garage. Under the Florida Building Code, Residential, where must the carbon monoxide alarm be installed?
Answer: Within 10 feet of each room used for sleeping
R315.1 requires a carbon monoxide alarm within 10 feet of each sleeping room in new construction that has a fossil-fuel appliance, a fireplace, an attached garage or other carbon monoxide source. The alarm is required near the bedrooms, not in the garage or the kitchen.
Reference: Florida Building Code, Residential, 8th Edition (2023), R315.1
Three resistors of 10, 15 and 25 ohms are connected in series across 120 volts. What is the circuit current?
Answer: 2.4 amperes
Series resistances add: 10 + 15 + 25 = 50 ohms. I = 120 / 50 = 2.4 A. 12 A uses only the 10 ohm resistor, 0.42 A uses the inverse of the ratio (50 / 120), and 7.2 A uses 120 x 0.06.
Reference: General electrical theory (Ohm's law and power formulas), Series circuits, Ohm's law
On a floor plan drawn at 1/4 inch = 1 foot, a branch-circuit run measures 5 3/4 inches. What is the actual length?
Answer: 23 feet
At 1/4 inch per foot, each inch is 4 feet: 5.75 x 4 = 23 ft. 5.75 ft ignores the scale, 11.5 ft uses 2 ft per inch, and 46 ft uses 8 ft per inch (1/8-inch scale).
Reference: Architect's scale conversion (1/4 inch = 1 foot) applied to electrical plans, Plan scale conversion
A temporary guardrail is built at an open floor edge. At what height must the top edge of the top rail be above the walking surface?
Answer: 42 inches, plus or minus 3 inches
1926.502(b)(1) requires the top edge height of top rails to be 42 inches plus or minus 3 inches above the walking/working level. Midrails are installed halfway between the top rail and the walking surface, and the top rail must withstand at least 200 pounds of force.
Reference: 29 CFR Part 1926 (OSHA construction standards), 1926.502(b)(1)
Sources
- Florida DBPR: electrical examinations (ECLB) (opens in a new tab)
- Pearson VUE: Florida electrical exams (opens in a new tab)
- Florida Statutes Chapter 489 (contracting) (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.