Requirements at a glance
| Agency | Colorado State Plumbing Board (DORA); exam by PSI |
|---|---|
| Experience | 5 full-time years (8,500 hours) of practical experience |
| Exam | 120 scored questions (plus unscored ones) in 270 minutes, 70% (84) to pass |
| Code book | 2024 IPC and 2024 IRC |
| Fees | $78 PSI exam ($73 retest), plus DORA's application fee |
Plumbers with five full-time years (8,500 hours) of practical experience.
Official links
How to get licensed, step by step
Get your hours
Work under a licensed plumber and keep records your supervisors can verify. 5 full-time years (8,500 hours) of practical experience.
Register with PSI
Register and schedule online or by phone. The exam fee is good for one year.
Schedule with PSI (Colorado plumbing) (opens in a new tab)PSI: Colorado plumbing candidate bulletin (opens in a new tab)
Pass the Master Plumber exam
120 scored questions (plus unscored ones) in 270 minutes, 70% (84) to pass. The 2024 IPC and 2024 IRC is provided at the test center.
Apply to DORA
After you pass, apply to the State Plumbing Board with your experience verification. Passing doesn't guarantee a license until the board approves your hours.
DORA: Plumbing Board applications and requirements (opens in a new tab)
How to prepare
- PSI hands you an unmarked code book: no tabs, highlights or notes. Practice with a clean copy and learn the index and the article/chapter layout instead of relying on tabs.
- There's no per-section minimum, so don't get stuck. Skip hard lookups, finish the easy ones, then come back.
- Isometric analysis is 10 questions on the master exam: size complete DWV systems from a drawing.
- You have 2.25 minutes per question. Practice full timed runs.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2024 IPC and the 2024 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2024 International Plumbing Code (IPC)Essential
Provided at the test center from November 1, 2026. Commercial and general plumbing questions.
ICC store (opens in a new tab)Read free (opens in a new tab)
2024 International Residential Code (IRC), plumbing chapters P25–P33Essential
Provided at the test center. Most residential plumbing and the residential fire sprinkler (P2904) questions.
ICC store (opens in a new tab)Read free (opens in a new tab)
Official reference list (as published by the testing agency)
- International Plumbing Code (IPC), 2024, and International Residential Code (IRC), 2024 (provided at the test center; 2021 books on request until February 1, 2027)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Water Supply | 16 | |
| Vents | 20 | |
| Fixtures and Equipment | 10 | |
| General Regulations | 6 | |
| Traps, Interceptors, and Separators | 6 | |
| Storm Drainage Systems | 12 | |
| Sanitary Drainage Systems | 22 | |
| Indirect and Special Waste Piping | 6 | |
| Isometric Analysis | 10 | |
| Residential Fire Sprinklers | 4 | |
| Water Heaters | 8 |
Exam day details
- Administered by PSI Services for the Colorado State Plumbing Board (DORA).
- Fee: $78 to PSI ($73 to retake). The fee is valid for one year. DORA's license application fee is separate.
- 120 scored questions in 270 minutes, plus up to 10 unscored questions with 30 extra minutes. You need 84 correct (70%).
- From November 1, 2026 the exams use the 2024 IPC and IRC. They test the model codes, not Colorado's state amendments.
- PSI provides the code books. You can't bring your own or write in the ones provided. Formulas aren't provided, so know your pipe-sizing and slope math.
- Overall score only: there is no minimum per section.
Frequently asked questions
How many questions are on the Colorado master plumber exam?
120 scored questions in 270 minutes, plus up to 10 unscored ones with 30 extra minutes. You need 84 correct (70%).
Which code is the Colorado master plumber exam based on?
The 2024 IPC and 2024 IRC from November 1, 2026. The 2021 books can be requested until February 1, 2027.
What experience does a Colorado master plumber need?
Five full-time years (8,500 hours) of practical experience. The board counts one month of full-time work as 163 hours.
Free questions with answers
Show all 10 free questions and answers
A building drain will carry 205 drainage fixture units and must be installed at 1/8 inch per foot because of the sewer depth. What is the minimum size of the building drain?
Answer: 5 inches
In Table 710.1(1), the 1/8-inch-per-foot column allows 180 dfu on a 4-inch drain and 390 dfu on a 5-inch drain. Because 205 is more than 180, the 4-inch pipe is too small and 5 inches is required. The common mistake is reading the 1/4-inch column, where a 4-inch drain carries 216 dfu; that only works if the drain can be laid at 1/4 inch per foot.
Reference: 2024 International Plumbing Code, Table 710.1(1)
A building drain makes three horizontal changes of direction, each greater than 45 degrees, all within 32 feet of developed length. How many cleanouts do these changes of direction require?
Answer: One, at the first change of direction
Section 708.1.4 requires a cleanout at each horizontal change of direction greater than 45 degrees. However, where more than one such change occurs within 40 feet of developed length, the cleanout installed for the first change serves all the changes within that 40 feet. All three bends here fall within 32 feet, so one cleanout at the first change satisfies the rule.
Reference: 2024 International Plumbing Code, Section 708.1.4
An open vent terminal will be 8 feet horizontally from an openable window in the same building. What does the IPC require?
Answer: The terminal must be at least 3 feet above the top of the window
Section 903.5 says an open vent terminal can't be directly beneath a door, openable window or other air intake, and can't be within 10 feet horizontally of such an opening unless it is 3 feet or more above the top of the opening. At 8 feet away, the terminal is within the 10-foot zone, so it must be at least 3 feet above the top of the window (or be moved 10 feet away).
Reference: 2024 International Plumbing Code, Section 903.5
A 4-inch soil stack carries 140 dfu. Its vent stack will have a developed length of 180 feet from the vent connection to the open air. Using Table 906.1, what is the minimum vent stack diameter?
Answer: 3 inches
In Table 906.1, find the 4-inch stack row for 140 dfu. The maximum developed lengths are 27 feet for a 2-inch vent, 65 feet for 2-1/2 inches, 200 feet for 3 inches and 750 feet for 4 inches. A 180-foot vent needs the 3-inch size, which also meets the Section 906.1 minimum of half the drain diameter (2 inches). The 2-inch answer comes from applying only the one-half-diameter rule and ignoring length.
Reference: 2024 International Plumbing Code, Section 906.1; Table 906.1
Static water pressure inside a new building measures 95 psi. An approved pressure-reducing valve with strainer is installed. The valve must reduce the static pressure in the building distribution piping to not more than what?
Answer: 80 psi
Section 604.8 requires an approved pressure-reducing valve (ASSE 1003 or CSA B356) with a strainer wherever static pressure inside a building exceeds 80 psi, and the valve must reduce the pressure in the distribution piping to not more than 80 psi static. Lower settings are often chosen in practice, but 80 psi is the code maximum. Lines to sill cocks and outside hydrants are exempt.
Reference: 2024 International Plumbing Code, Section 604.8
Under Table 604.4 of the 2024 IPC, what is the maximum flow rate permitted for a showerhead (including a hand-held shower spray)?
Answer: 2.0 gpm at 80 psi
The 2024 edition of Table 604.4 sets showerheads at 2.0 gpm at 80 psi, and footnote a says a hand-held shower spray counts as a showerhead. Footnote c also requires showerheads to meet the high-efficiency requirements of ASME A112.18.1/CSA B125.1. The 2.5 gpm at 80 psi figure is the limit in the 2021 and earlier editions of the table (and the federal maximum), and 2.2 gpm at 60 psi is the private lavatory and sink faucet limit.
Reference: 2024 International Plumbing Code, Section 604.4; Table 604.4
A flat roof has a projected area of 12,000 square feet, and the design rainfall rate is 2.5 inches per hour. Using the IPC rainfall conversion equation, what flow rate must the storm drainage serving this roof carry?
Answer: 312 gpm
Section 1106.2.1 converts rainfall to flow with Equation 11-1: gpm = R x A x 0.0104, where R is rainfall in inches per hour and A is roof area in square feet. 2.5 x 12,000 = 30,000, and 30,000 x 0.0104 = 312 gpm. Leaving out the rainfall rate gives about 125 gpm, and slipping the decimal (0.104) gives 3,120 gpm.
Reference: 2024 International Plumbing Code, Section 1106.2.1, Equation 11-1
An isometric of a single-family house shows these fixtures draining to the building drain: two full bathrooms (each a 1.6-gpf water closet, lavatory and bathtub), a kitchen sink with a food waste disposer and dishwasher, a residential clothes washer standpipe and a laundry tray. What is the total drainage fixture unit load?
Answer: 16 dfu
Using Table 709.1: each bathroom group with a 1.6-gpf water closet is 5 dfu, so two are 10 dfu. The kitchen sink with disposer and dishwasher is 2 dfu (one combined listing), the residential clothes washer is 2 dfu and the laundry tray is 2 dfu. Total = 10 + 2 + 2 + 2 = 16 dfu. Counting the dishwasher separately (another 2 dfu) gives 18, adding the bathroom fixtures one by one (3 + 1 + 2 = 6 each instead of 5) also gives 18, and making both mistakes gives 20; leaving out the laundry tray gives 14.
Reference: 2024 International Plumbing Code, Table 709.1
A storage water heater is rated by its manufacturer for 150 psi working pressure. What are the maximum temperature and pressure settings allowed for its relief valve?
Answer: 210°F and 150 psi
Section 504.5 requires temperature and pressure relief valves to have a temperature setting of not more than 210°F and a pressure setting not exceeding the tank or heater manufacturer's rated working pressure or 150 psi, whichever is less. With a 150-psi rating, both limits give 150 psi. 212°F is the boiling point at sea level, which the 210°F limit is meant to stay below.
Reference: 2024 International Plumbing Code, Section 504.5
Which site-built shower compartment (finished interior dimensions) meets the minimum size requirements of Section 421.4?
Answer: 27 x 50 inches
Section 421.4 requires at least 900 square inches and a least dimension of 30 inches. The exception allows a least dimension of 25 inches if the area is at least 1,300 square inches. 27 x 50 = 1,350 square inches with a 27-inch least dimension, so it qualifies under the exception. 28 x 36 = 1,008 square inches but is under 30 inches wide and under 1,300 square inches; 26 x 48 = 1,248 square inches, below 1,300; and 30 x 29 = 870 square inches with a 29-inch least dimension.
Reference: 2024 International Plumbing Code, Section 421.4
Sources
- PSI: Colorado State Plumbing Board Candidate Information Bulletin (opens in a new tab)
- Colorado DORA: Plumbing Board applications and requirements (opens in a new tab)
Questions last verified October 20, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.