Requirements at a glance
| Agency | Arizona Registrar of Contractors (ROC); trade exam by PSI |
|---|---|
| Exams | 80 questions, 210 minutes, 70%, plus the online Statutes and Rules Exam (SRE) |
| Books allowed | 2018 IMC, 2018 IFGC and 29 CFR 1926 |
| Fees | $66 PSI trade exam + $61 SRE, plus ROC license fees and bond |
Qualifying parties for an Arizona C-39, CR-39 or R-39R Air Conditioning and Refrigeration license. The same exam covers all three. Technicians handling refrigerant also need EPA 608 certification.
Official links
How to get licensed, step by step
Pick your classification and qualifying party
Find your classification on the ROC's list. The qualifying party (an owner or regular employee of the business) must have the required trade experience and takes the exams for the business.
Pass the Statutes and Rules Exam (SRE)
Buy the ROC's online SRE course and exam through GMetrix ($61), work through the course, then take the final exam. 70% to pass, one attempt per purchase.
Buy the Statutes and Rules Exam (GMetrix) (opens in a new tab)
Schedule the Air Conditioning and Refrigeration exam with PSI
Book online with PSI ($66, or $116 for two exams). Bring the allowed references, bound and tabbed. If you fail, wait 30 days to retake.
Schedule with PSI (Arizona contractors) (opens in a new tab)PSI content outline: C-39/CR-39/R-39R (opens in a new tab)
Apply to the ROC
Submit your application with your passing score reports within two years of passing, plus the license bond, fees and business documents the ROC asks for.
How to prepare
- Bring the exact code editions on PSI's list. Arizona's trade exams use older editions (2017 NEC, 2018 I-codes); a newer book gives some wrong answers.
- Bind or spiral any printed references, and tab them with permanent tabs before exam day. Sticky notes are removed at check-in.
- Practice finding answers fast. On a 100-question, 4-hour exam you have 2.4 minutes per question, and some of that goes to unscored items.
- Refrigeration, A/C and warm-air heating are 36 of 80 questions and come mostly from trade knowledge, not the code book. Know superheat, subcooling, airflow and combustion basics.
- Evaporative coolers get their own section in Arizona: know pads, bleed-off, pumps and ventilation.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 International Mechanical Code (IMC)
Allowed in the exam room. Ventilation, ducts, combustion air, hydronics and refrigeration.
ICC store (opens in a new tab)Read free (opens in a new tab)
2018 International Fuel Gas Code (IFGC)
Allowed in the exam room. Gas pipe sizing tables, venting and appliance rules.
ICC store (opens in a new tab)Read free (opens in a new tab)
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- International Mechanical Code (IMC), 2018 (allowed in the exam room)
- International Fuel Gas Code (IFGC), 2018 (allowed in the exam room)
- 29 CFR Part 1926, OSHA Construction (allowed in the exam room)
- Modern Refrigeration and Air Conditioning, 19th or 20th ed. (not allowed in the room)
- Low Pressure Boilers; ACCA Manual D; ACCA Ductulator (not allowed in the room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Refrigeration | 12 | |
| Air Conditioning | 12 | |
| Warm Air Heating | 12 | |
| Controls and Motors | 8 | |
| Boilers | 4 | |
| Ventilation | 4 | |
| Evaporative Coolers | 4 | |
| Fuel Piping Systems | 5 | |
| Water Piping Systems | 5 | |
| Steam, Hot, Chilled and Condensing Water | 5 | |
| Testing, Balancing and Inspections | 5 | |
| Sizing and Estimating | 4 |
Exam day details
- Administered by PSI Services for the Arizona Registrar of Contractors (ROC).
- Fee: $66 to PSI ($116 for two exams taken together). The ROC license application fee is separate.
- 80 scored questions in 210 minutes, 70% to pass.
- Open book: bring your own bound copies of the allowed references. You may highlight and add permanent tabs beforehand, but not write in them during the exam.
- PSI adds 5 to 10 unscored trial questions, which count against your time.
- If you fail, wait 30 days to retake; after a third failure the wait is 90 days. Submit your ROC application within two years of passing.
- You also need Arizona's Statutes and Rules Exam (SRE), taken online through the ROC. The ROC can waive the trade exam if you were the qualifying party on a license in the same classification in the last five years.
Frequently asked questions
What's on the Arizona C-39 HVAC exam?
80 questions: refrigeration, air conditioning and warm air heating (12 each), controls and motors 8, and 4 to 5 each on boilers, ventilation, evaporative coolers, fuel piping, water piping, steam and hydronic water, testing and balancing, and sizing and estimating.
Is the R-39R exam the same as C-39?
Yes. PSI uses one Air Conditioning and Refrigeration exam for R-39R, C-39 and CR-39. The R-39 and C-79 classifications that include solar use a different outline.
Do I need EPA 608 in Arizona?
Yes, federally, for anyone who handles refrigerant. It's separate from the ROC license.
Free questions with answers
Show all 10 free questions and answers
A new hot water boiler is being set in a mechanical room. Unless the code official approves otherwise, what minimum unobstructed passageway width does the 2018 IMC require around all sides of the boiler?
Answer: 18 inches
IMC 2018 Section 1004.3 requires clearances around boilers so gauges can be seen and the boiler can be inspected, serviced and replaced. Passageways around all sides must be at least 18 inches wide unless otherwise approved. 30 inches is the depth of the level working space in front of an appliance's control side under Section 306.1, not the boiler passageway. 24 inches is the dwelling-unit compartment passageway width in Section 306.2.
Reference: 2018 International Mechanical Code, Section 1004.3
Condensate drains from rooftop units totaling 60 tons of cooling are manifolded into one common drain line. Using IMC Table 307.2.2, what is the minimum diameter of the common condensate pipe?
Answer: 1-1/4 inches
IMC 2018 Section 307.2.2 requires manifolded condensate drains to be sized by Table 307.2.2. The "over 40 tons to 90 tons" row calls for a 1-1/4-inch pipe, so 60 tons needs 1-1/4 inches. 3/4 inch is the minimum for a single unit's drain and for manifolds up to 20 tons. 1 inch covers over 20 up to 40 tons. 1-1/2 inches starts above 90 tons.
Reference: 2018 International Mechanical Code, Section 307.2.2 and Table 307.2.2
A low-pressure natural gas system (under 2 psi, 0.60 specific gravity) feeds a 100,000 Btu/h furnace and a 40,000 Btu/h water heater. The gas has a heating value of 1,000 Btu per cubic foot. The longest run from the meter to the most remote outlet is 60 feet. Using IFGC Table 402.4(2) (Schedule 40 steel, 0.5 in. w.c. pressure drop), what is the smallest size for the line leaving the meter that carries both loads?
Answer: 1 inch
Step 1, the load: 100,000 + 40,000 = 140,000 Btu/h, and 140,000 / 1,000 Btu/ft3 = 140 cfh. Step 2, the length: under the longest length method (IFGC 2018 Section 402.4.1), use the 60-foot row of Table 402.4(2). Step 3, the size: in that row 1/2 inch carries 65 cfh, 3/4 inch carries 137 cfh and 1 inch carries 257 cfh. 3/4 inch looks close, but 137 cfh is less than 140 cfh, so it fails. The first size that carries at least 140 cfh is 1 inch.
Reference: 2018 International Fuel Gas Code, Sections 402.4.1 and Table 402.4(2)
A new commercial gas system will run at 2 psig. Its piping volume is 700 cubic feet. Under the 2018 IFGC, what are the minimum test pressure and minimum test duration?
Answer: 3 psig for 1 hour
Pressure: IFGC 2018 Section 406.4.1 requires at least 1.5 times the proposed maximum working pressure, but never less than 3 psig. 1.5 x 2 = 3 psig. Duration: Section 406.4.2 requires 1/2 hour for each 500 cubic feet of pipe volume or fraction thereof. 700 cubic feet is two 500-cubic-foot units (one full unit plus a fraction), so 2 x 1/2 hour = 1 hour. 30 minutes ignores the 'or fraction thereof' rule. 10 minutes applies only to systems under 10 cubic feet or in single-family dwellings.
Reference: 2018 International Fuel Gas Code, Sections 406.4.1 and 406.4.2
A field-erected refrigerant piping system is ready for its pressure test under the 2018 IMC. Which test gas is allowed for an R-410A system?
Answer: Dry nitrogen
IMC 2018 Section 1108.2 requires an inert dried gas, such as nitrogen or carbon dioxide. Oxygen, air, combustible gases and mixtures containing them are prohibited. The only exception lets air be used on R-717 (ammonia) systems if they are evacuated before charging. Shop air carries moisture and oxygen, and oxygen with compressor oil can explode.
Reference: 2018 International Mechanical Code, Section 1108.2
An evaporator coil sits in an attic over a finished ceiling, and an overflow could damage the ceiling. The installer will use an auxiliary drain pan with its own drain. Under the 2018 IMC, what are the pan's minimum depth and size?
Answer: 1-1/2 inches deep, and 3 inches larger than the unit or coil in width and length
IMC 2018 Section 307.2.3, Item 1, requires the auxiliary pan to be at least 1-1/2 inches deep and at least 3 inches larger than the unit or coil in width and length. It must be corrosion resistant: galvanized steel at least No. 24 gage (0.0236 inch) or nonmetallic at least 0.0625 inch thick. Its separate drain must discharge to a conspicuous point so occupants notice when the primary drain is blocked.
Reference: 2018 International Mechanical Code, Section 307.2.3, Item 1
A gas furnace is in a residential garage and is not listed as flammable vapor ignition resistant. Under the 2018 IMC, how high above the floor must its ignition source be?
Answer: 18 inches
IMC 2018 Section 304.3 requires equipment with an ignition source in garages and other hazardous locations to have the ignition source at least 18 inches above the floor, because gasoline vapor is heavier than air. Appliances listed as flammable vapor ignition resistant are exempt. Section 304.7 also requires protection from vehicle impact (or a 6-foot height) in private garages.
Reference: 2018 International Mechanical Code, Section 304.3
A technician measures resistance between the three terminals of a single-phase compressor (all unmarked): T1 to T2 = 7 ohms, T1 to T3 = 2 ohms, T2 to T3 = 5 ohms. Which terminal is Common?
Answer: T3
In a single-phase compressor, the reading from Run to Start is the start and run windings in series, so it is the highest reading. The terminal left out of the highest pair is Common. The highest reading is T1-T2 (7 ohms), so T3 is Common. Check: C-R + C-S = R-S, and 2 + 5 = 7 ohms. The lowest reading from Common (2 ohms, to T1) is the Run winding. The 5-ohm reading to T2 is the Start winding.
Reference: Modern Refrigeration and Air Conditioning, 22nd Edition, Chapter 19: Servicing Electric Motors and Controls
A space has a sensible cooling load of 54,000 Btu/h. The design supply-air temperature difference (room minus supply) is 20°F. Using the standard sensible heat formula, what airflow is required?
Answer: 2,500 cfm
Sensible heat: Btu/h = 1.08 x cfm x temperature difference, so cfm = Btu/h / (1.08 x temperature difference). 1.08 x 20 = 21.6, and 54,000 / 21.6 = 2,500 cfm. 2,700 cfm comes from leaving out the 1.08 factor (54,000 / 20). 2,000 cfm comes from using a 25°F difference. The 1.08 constant comes from standard air density times specific heat times 60 minutes per hour.
Reference: Modern Refrigeration and Air Conditioning, 22nd Edition, Chapter 28: Air Movement and Measurement
Under the 2018 IMC, what is the largest nominal size of annealed-temper (soft) Type ACR copper tube that may be used for refrigerant piping erected on the premises?
Answer: 2 inch
IMC 2018 Section 1107.5.3 requires seamless Type ACR copper tube (hard or annealed, ASTM B280 or B819) and says annealed-temper tube shall not be used in sizes larger than 2-inch nominal. The 7/8-inch figure in the same section is a different limit: mechanical joints other than listed press-connect joints may not be used on annealed tube larger than 7/8-inch OD. 5/8-inch OD is the copper-tubing size in the Section 1108.1 exception that allows a test with refrigerant at its 70°F saturation pressure.
Reference: 2018 International Mechanical Code, Section 1107.5.3
Sources
- PSI: C-39/CR-39/R-39R Air Conditioning and Refrigeration content outline (PDF) (opens in a new tab)
- PSI: Arizona ROC Candidate Information Bulletin (Feb 2026) (opens in a new tab)
- Arizona ROC: Applying for a license (opens in a new tab)
Questions last verified October 20, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.