Arizona licensing exam

Arizona C-11 Electrical Contractor Exam (Commercial): Practice Test & Licensing Guide

The PSI trade exam for Arizona's C-11 and CR-11 electrical licenses: 110 questions on the 2017 NEC, including 10 on photovoltaics, open book.

Questions
110
Time limit
4 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Services, Feeders and Branch Circuits

A 3-phase feeder supplies 120 A of continuous load and 40 A of noncontinuous load. No adjustment or correction factors apply. What is the minimum ampacity of the feeder ungrounded conductors?

Requirements at a glance

AgencyArizona Registrar of Contractors (ROC); trade exam by PSI
Exams110 questions, 240 minutes, 70%, plus the online Statutes and Rules Exam (SRE)
Books allowed2017 NEC, NFPA 72-2016 and 29 CFR 1926
Fees$66 PSI trade exam + $61 SRE, plus ROC license fees and bond

Qualifying parties for an Arizona C-11 Electrical (Commercial) or CR-11 Electrical (dual residential and commercial) contractor license.

How to get licensed, step by step

  1. Pick your classification and qualifying party

    Find your classification on the ROC's list. The qualifying party (an owner or regular employee of the business) must have the required trade experience and takes the exams for the business.

    Arizona ROC: License classifications (opens in a new tab)

  2. Pass the Statutes and Rules Exam (SRE)

    Buy the ROC's online SRE course and exam through GMetrix ($61), work through the course, then take the final exam. 70% to pass, one attempt per purchase.

    Buy the Statutes and Rules Exam (GMetrix) (opens in a new tab)

  3. Schedule the C-11 trade exam with PSI

    Book online with PSI ($66, or $116 for two exams). Bring the allowed references, bound and tabbed. If you fail, wait 30 days to retake.

    Schedule with PSI (Arizona contractors) (opens in a new tab)PSI content outline: C-11/CR-11 Electrical (Commercial) (opens in a new tab)

  4. Apply to the ROC

    Submit your application with your passing score reports within two years of passing, plus the license bond, fees and business documents the ROC asks for.

    Arizona ROC: Applying for a license (opens in a new tab)

How to prepare

  • Bring the exact code editions on PSI's list. Arizona's trade exams use older editions (2017 NEC, 2018 I-codes); a newer book gives some wrong answers.
  • Bind or spiral any printed references, and tab them with permanent tabs before exam day. Sticky notes are removed at check-in.
  • Practice finding answers fast. On a 100-question, 4-hour exam you have 2.4 minutes per question, and some of that goes to unscored items.
  • The ampacity table is 310.15(B)(16) in the 2017 NEC and load calculations are in Article 220. Tab them.
  • Photovoltaics is 10 questions: know Article 690 (2017), including rapid shutdown in 690.12.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2017 NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • NFPA 70: National Electrical Code, 2017 (allowed in the exam room)
  • NFPA 72: National Fire Alarm and Signaling Code, 2016 (allowed in the exam room)
  • 29 CFR Part 1926, OSHA Construction (allowed in the exam room)
  • Ugly's Electrical References; Photovoltaic Systems, Dunlop (not allowed in the room)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
General Electrical Knowledge5
Services, Feeders and Branch Circuits13
Grounding and Bonding13
Conductors and Cables12
Raceways and Boxes10
Special Occupancies and Equipment13
Devices2
Motors5
Low Voltage5
Lighting3
Illuminated Signs1
Fire Detection and Alarm Systems5
Safety5
Overcurrent Protection8
Photovoltaics10

Exam day details

  • Administered by PSI Services for the Arizona Registrar of Contractors (ROC).
  • Fee: $66 to PSI ($116 for two exams taken together). The ROC license application fee is separate.
  • 110 scored questions in 240 minutes, 70% to pass.
  • The exam uses the 2017 NEC, not the newest edition. Bring the 2017 code book.
  • You can take the NASCLA Accredited Examination for Electrical Contractors instead of this exam.
  • Open book: bring your own bound copies of the allowed references. You may highlight and add permanent tabs beforehand, but not write in them during the exam.
  • PSI adds 5 to 10 unscored trial questions, which count against your time.
  • If you fail, wait 30 days to retake; after a third failure the wait is 90 days. Submit your ROC application within two years of passing.
  • You also need Arizona's Statutes and Rules Exam (SRE), taken online through the ROC. The ROC can waive the trade exam if you were the qualifying party on a license in the same classification in the last five years.

Frequently asked questions

Which NEC edition is the Arizona C-11 exam based on?

The 2017 NEC. PSI's outline says code questions use only the listed edition, so a 2020 or 2023 code book can give you wrong answers.

What's on the Arizona C-11 electrical exam?

110 questions. The biggest areas are services, feeders and branch circuits (13), grounding and bonding (13), special occupancies (13), conductors and cables (12), raceways and boxes (10) and photovoltaics (10).

Does Arizona have a journeyman electrician license?

No. Arizona doesn't license journeyman electricians statewide; the ROC licenses electrical contracting businesses, and the qualifying party takes this exam. Some cities have their own rules.

Free questions with answers

Show all 10 free questions and answers
  1. A 3-phase feeder supplies 120 A of continuous load and 40 A of noncontinuous load. No adjustment or correction factors apply. What is the minimum ampacity of the feeder ungrounded conductors?

    Answer: 190 A

    Section 215.2(A)(1) requires feeder conductors to have an ampacity of at least 125% of the continuous load plus 100% of the noncontinuous load: 120 x 1.25 = 150 A, plus 40 A = 190 A. 160 A is the plain connected load with no 125% factor, 150 A forgets the noncontinuous load, and 200 A wrongly applies 125% to the noncontinuous load as well.

    Reference: NFPA 70: National Electrical Code, 2017 edition, 215.2(A)(1)

  2. A 480Y/277-volt panelboard has exposed live parts on one side of the working space and a grounded concrete wall on the other side. What minimum depth of working space is required in front of it?

    Answer: 3-1/2 ft

    The nominal voltage to ground is 277 V, which falls in the 151-600 V row of Table 110.26(A)(1). Exposed live parts on one side and grounded parts (concrete is considered grounded) on the other is Condition 2, which requires 3-1/2 ft (1.07 m). 3 ft is Condition 1, 4 ft is Condition 3 (live parts on both sides), and 6 ft is not a 0-600 V value.

    Reference: NFPA 70: National Electrical Code, 2017 edition, 110.26(A)(1), Table 110.26(A)(1)

  3. A service is made up of two parallel sets of 500 kcmil copper ungrounded conductors. Using Table 250.66, what is the minimum size copper grounding electrode conductor to a building steel / water pipe electrode system (not a rod or concrete-encased electrode only)?

    Answer: 2/0 AWG

    For parallel service conductors, Table 250.66 is entered with the equivalent area of the largest ungrounded conductor set: 2 x 500 = 1,000 kcmil. The row 'over 600 through 1100 kcmil' copper requires a 2/0 AWG copper GEC. 1/0 AWG is the next row down (over 350 through 600, i.e. one 500 kcmil set), and 3/0 AWG is only required above 1,100 kcmil.

    Reference: NFPA 70: National Electrical Code, 2017 edition, 250.66, Table 250.66 and its Note 1

  4. Six current-carrying 8 AWG THHN copper conductors are installed in one EMT raceway where the ambient temperature is 38 C (100 F). Using Table 310.15(B)(16) and the correction and adjustment tables, what is the adjusted ampacity of each conductor?

    Answer: 40.0 A

    Start with the 90 C column of Table 310.15(B)(16): 8 AWG THHN copper = 55 A. Table 310.15(B)(2)(a) gives 0.91 for 36-40 C in the 90 C column, and Table 310.15(B)(3)(a) gives 80% for 4-6 current-carrying conductors: 55 x 0.91 x 0.80 = 40.0 A. 44.0 A skips the temperature correction, 50.1 A skips the adjustment for six conductors, and 35.2 A uses the 75 C column values (50 A x 0.88 x 0.80). Terminations must still be checked under 110.14(C).

    Reference: NFPA 70: National Electrical Code, 2017 edition, Table 310.15(B)(16), Table 310.15(B)(2)(a), Table 310.15(B)(3)(a)

  5. A metal box will contain six 12 AWG insulated conductors that terminate in the box, three 12 AWG equipment grounding conductors, one duplex receptacle, and internal cable clamps. Using 314.16(B), what minimum box volume is required?

    Answer: 22.5 cu in

    Count per 314.16(B): 6 conductors = 6; all EGCs together = 1 (314.16(B)(5)); one device = 2 (314.16(B)(4)); internal clamps = 1 (314.16(B)(2)); total 10. Table 314.16(B) gives 2.25 cu in per 12 AWG conductor: 10 x 2.25 = 22.5 cu in. 27.0 cu in counts each EGC separately, 20.25 cu in leaves out the clamps, and 18.0 cu in counts the device once and leaves out the clamps.

    Reference: NFPA 70: National Electrical Code, 2017 edition, 314.16(B), Table 314.16(B)

  6. In a Class I, Division 1 location, a conduit enters an explosionproof enclosure that contains switches that may produce arcs. How far from the enclosure may the conduit seal be installed?

    Answer: Within 18 in

    Section 501.15(A)(1) requires a conduit seal in each conduit entry into an explosionproof enclosure containing arcing or high-temperature devices, and the seal must be installed as close as practicable to the enclosure but not more than 18 in from it. 10 ft is the distance allowed for a boundary seal under 501.15(A)(4).

    Reference: NFPA 70: National Electrical Code, 2017 edition, 501.15(A)(1)

  7. A single 25 hp, 460-volt, 3-phase induction motor (continuous duty) is supplied by a branch circuit. Using Table 430.250, what is the minimum ampacity of the branch-circuit conductors?

    Answer: 42.5 A

    Section 430.6(A)(1) requires the table full-load current, not the nameplate, for conductor sizing. Table 430.250 gives 34 A for a 25 hp, 460-V motor. Section 430.22 requires 125% of that: 34 x 1.25 = 42.5 A (8 AWG THWN copper at 75 C, 50 A, would work). 34 A omits the 125%, 39.1 A uses 115% (the overload factor for some motors), and 85 A uses the 250% breaker factor of Table 430.52.

    Reference: NFPA 70: National Electrical Code, 2017 edition, 430.6(A)(1), 430.22, Table 430.250

  8. The 120-volt branch circuit that supplies the power source for a fire alarm control unit must meet which requirement of 760.41(B)?

    Answer: It must not be supplied through a GFCI or AFCI device

    Section 760.41(B) requires the branch circuit supplying the fire alarm power source to supply no other loads, and it must not be supplied through ground-fault circuit interrupters or arc-fault circuit interrupters, to avoid nuisance tripping of a life-safety system. Its disconnecting means must have red identification, be accessible only to qualified persons and be identified as 'FIRE ALARM CIRCUIT', and its location must be permanently identified at the control unit.

    Reference: NFPA 70: National Electrical Code, 2017 edition, 760.41(B)

  9. Under 29 CFR 1926.405(a)(2)(ii)(J), extension cord sets used with portable electric tools on a construction site must be which type?

    Answer: Three-wire type designed for hard or extra-hard usage

    29 CFR 1926.405(a)(2)(ii)(J) requires extension cord sets used with portable electric tools and appliances to be three-wire type and designed for hard or extra-hard usage (the OSHA note lists examples such as types S, ST, SO, STO and junior hard service SJ, SJO, SJT, SJTO). Flexible cords for temporary and portable lights must also be hard or extra-hard usage.

    Reference: 29 CFR Part 1926 (OSHA Construction Standards), 1926.405(a)(2)(ii)(J)

  10. A PV source circuit has 12 crystalline silicon modules in series, each with a rated Voc of 40.0 V. The lowest expected ambient temperature is -3 C, and the manufacturer's temperature coefficients are not available. Using Table 690.7(A), what is the maximum PV system voltage?

    Answer: 537.6 V

    Section 690.7(A) requires the sum of the module Voc values to be corrected for the lowest expected ambient temperature. With no manufacturer coefficients, Table 690.7(A) gives a factor of 1.12 for -1 to -5 C. 12 x 40.0 = 480 V x 1.12 = 537.6 V. 480 V is uncorrected, 528.0 V uses 1.10 (0 to 4 C) and 547.2 V uses 1.14 (-6 to -10 C).

    Reference: NFPA 70: National Electrical Code, 2017 edition, 690.7(A), Table 690.7(A)