Vermont licensing exam

Vermont Journeyman Electrician Exam: Practice Test & Licensing Guide

The Prov exam for a Vermont journeyman electrician license: 90 open-book questions in 4 hours on wiring and protection, wiring methods, equipment, motors and Vermont's local amendments. 70% to pass.

Questions
90
Time limit
4 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Electrical Theory & Principles

A two-wire, 240-volt single-phase circuit uses 12 AWG copper (K = 12.9, 6,530 circular mils) to supply a 20-ampere load 90 feet from the panel (one-way). What is the voltage drop?

Requirements at a glance

AgencyVermont Division of Fire Safety (Electricians' Licensing Board); exam by Prov
Exam90 questions, 4 hours, open book, 70% to pass
ExperienceVermont apprenticeship completion or equivalent training and experience accepted by the Board (26 V.S.A. ch. 15)
Books allowed2023 NEC; NEC Notes, 2023 (hand written, as Prov lists them); Ugly's Electrical References (2020); 2025 Vermont Electrical Safety Rules. 26 V.S.A. ch. 15 is study only
Fees$80 to Prov; Division application and license fees are separate

Electricians applying to the Vermont Division of Fire Safety (Electricians' Licensing Board) for a journeyman license. Vermont asks for a completed apprenticeship or equivalent training and experience accepted by the Board, then a passing exam score.

How to get licensed, step by step

  1. Meet the experience requirement

    Complete a Vermont apprenticeship (verified by the Apprenticeship Council) or equivalent training and experience the Board accepts. Check the Division's page for the current requirement.

    Vermont Division of Fire Safety: electrical licensing (opens in a new tab)26 V.S.A. chapter 15 (electricians) (opens in a new tab)

  2. Apply to the Division of Fire Safety

    Send the application and fee to Trade Licensing in Waterbury (802-479-7564). The Division confirms your eligibility and, once the Board approves you, sends your details to Prov. Check its page for current forms and fees.

    Vermont Division of Fire Safety: electrical licensing (opens in a new tab)

  3. Schedule with Prov

    Once the Board approves you, it sends your details to Prov. Schedule at provexam.com/scheduler (sign in with your email and last name) or by phone at 801-733-4455. Prov lists one Vermont test center, in Lyndonville; you can also test at any Prov center in the U.S. or remotely from home through Examroom.ai. You get your score as soon as you finish.

    Schedule with Prov (opens in a new tab)Prov: Vermont Fire Safety Candidate Information Bulletin (PDF) (opens in a new tab)

  4. Get licensed

    Prov reports your result to the Division, which issues the license. Licenses run 3 years. The license fee is $115 for a journeyman and $150 for a master (26 V.S.A. 905), and renewal needs 15 hours of Board-approved NEC instruction in the preceding 36 months (26 V.S.A. 908).

    Vermont Division of Fire Safety: electrical licensing (opens in a new tab)26 V.S.A. chapter 15 (electricians) (opens in a new tab)

  5. Complete the Vermont energy goals module

    Vermont requires a Vermont Energy Goals education module (no more than 2 hours by law; the Division says it takes about 20 minutes) before an initial license and each renewal. Send the completion certificate with your application.

    Vermont Division of Fire Safety: trade licensing (opens in a new tab)

How to prepare

  • Wiring and protection (30) and wiring methods and materials (20) are 50 of 90 questions.
  • Tab your NEC for Chapter 9 tables, Article 310 ampacities and Article 250 grounding.
  • The 2025 Vermont Electrical Safety Rules (effective Nov. 5, 2025) adopt the 2023 NEC with Vermont amendments, including changes to 210.8, 210.12, 230.70, 334 and 518. The local amendments section (5 questions) tests them, so tab the rules next to your NEC.
  • You can take the exam up to 3 times on one approval (good for 3 years), with no waiting period and the same $80 fee each time; after that you reapply.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2023 NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • 2023 National Electrical Code (NEC), NFPA 70Essential

    Allowed in the exam room. Most of the electrician exams come from it.

    NFPA (opens in a new tab)

  • Ugly's Electrical References, 2020

    Allowed in the exam room. Quick tables and formulas.

Official reference list (as published by the testing agency)
  • NFPA 70 National Electrical Code, 2023 (open book)
  • NEC Notes, 2023, hand written notes (open book, as listed by Prov)
  • Ugly's Electrical References, 2020 (open book)
  • 2025 Vermont Electrical Safety Rules (open book)
  • 26 V.S.A. chapter 15, Electricians (study only; not allowed in the exam room)

What's on the exam

Official content outline from Prov, Inc. (number of questions per topic):

TopicQuestions
General Electrical Theory & Principles7
Wiring & Protection30
Wiring Methods & Materials20
Motors & Controls3
Equipment for General Use15
Special Occupancies4
Special Equipment3
Special Conditions3
Local Amendments5

Exam day details

  • Administered by Prov, Inc. for the Vermont Department of Public Safety, Division of Fire Safety.
  • Fee: $80 to Prov per exam. Division application and license fees are separate.
  • 90 questions in 4 hours; 70% to pass.
  • Open book: only the references marked open book below are permitted in the exam room. Pen highlighting and underlining and permanent tabs are allowed; Post-it notes, loose formula sheets and marking your books during the exam are not.
  • Once the Board approves you, it sends your details to Prov; schedule at provexam.com/scheduler or by phone at 801-733-4455. Prov lists one Vermont test center (Lyndonville), any Prov center in the U.S., or remote testing from home through Examroom.ai.
  • You can take the exam up to 3 times on one approval, with no waiting period between attempts; after that you reapply to the Division. The approval is good for 3 years. Each attempt costs the $80 exam fee.

Frequently asked questions

What's on the Vermont journeyman electrician exam?

90 questions: wiring and protection 30, wiring methods and materials 20, equipment for general use 15, general electrical theory and principles 7, local amendments 5, special occupancies 4, and motors and controls, special equipment and special conditions 3 each.

Which NEC edition is on the exam?

The 2025 Vermont Electrical Safety Rules (effective November 5, 2025) adopt the 2023 NEC with Vermont amendments, and Prov's bulletin lists the 2023 NEC. The local amendments section tests the Vermont changes.

Is the exam open book?

Yes, with the approved references only. Prov checks your books at check-in; pen highlighting, underlining and permanent tabs are allowed, but Post-it notes and added sheets are not.

Free questions with answers

Show all 10 free questions and answers
  1. A two-wire, 240-volt single-phase circuit uses 12 AWG copper (K = 12.9, 6,530 circular mils) to supply a 20-ampere load 90 feet from the panel (one-way). What is the voltage drop?

    Answer: 7.1 volts

    VD = 2 x K x I x L / CM = 2 x 12.9 x 20 x 90 / 6,530 = 46,440 / 6,530 = 7.1 V (about 3 percent of 240 V). 3.6 V leaves out the factor of 2 for the return conductor, 6.2 V uses the three-phase 1.732 factor, and 14.2 V doubles the run twice.

    Reference: NFPA 70, National Electrical Code (2023), 210.19 Informational Note (voltage drop) and Chapter 9 Table 8

  2. How many 20-ampere small-appliance branch circuits must a new dwelling have for the receptacle outlets in its kitchen, pantry, breakfast room and dining room?

    Answer: At least two

    Section 210.11(C)(1) requires two or more 20-ampere small-appliance branch circuits to serve the receptacle outlets required by 210.52(B). Two circuits keep toasters, coffee makers and similar loads from overloading one circuit. A single shared circuit does not meet the rule.

    Reference: NFPA 70, National Electrical Code (2023), 210.11(C)(1)

  3. Countertop receptacles in a dwelling kitchen are mounted in the work surface using listed countertop receptacle assemblies, or on the wall above it. What is the highest permitted height above the countertop for a receptacle installed above it?

    Answer: 20 inches

    Section 210.52(C)(3) permits countertop receptacle outlets located on or above the countertop, but not more than 20 in. above it, or in the counter using listed assemblies. Receptacles higher than that do not count as the required countertop outlets.

    Reference: NFPA 70, National Electrical Code (2023), 210.52(C)(3)

  4. At each outlet, junction and switch point, what minimum length of free conductor must be left for splices or the connection of devices, in the standard case?

    Answer: 6 inches

    Section 300.14 requires at least 6 in. of free conductor at each outlet, junction and switch point, measured from where the conductor emerges from its cable sheath or raceway. Where the box opening is less than 8 in., at least 3 in. must extend outside the opening.

    Reference: NFPA 70, National Electrical Code (2023), 300.14

  5. A 480-volt panelboard has exposed live parts on one side of the working space and a grounded concrete wall on the other side. What is the minimum depth of working space under Table 110.26(A)(1)?

    Answer: 3 feet 6 inches

    Exposed live parts on one side and grounded parts on the other is Condition 2. For 151 to 600 volts to ground (480Y/277 is 277 V to ground), Condition 2 requires 3 ft 6 in. Condition 1 would be 3 ft, and Condition 3 (live parts on both sides) would be 4 ft.

    Reference: NFPA 70, National Electrical Code (2023), 110.26(A)(1), Table 110.26(A)(1)

  6. A 15-horsepower, 230-volt, three-phase squirrel-cage motor has a Table 430.250 full-load current of 42 amperes. What is the minimum ampacity of the branch-circuit conductors for this single continuous-duty motor under 430.22?

    Answer: 52.5 amperes

    Section 430.22 requires conductors to carry at least 125 percent of the motor's full-load current from the table: 42 x 1.25 = 52.5 A. 42 A is the table value with no multiplier, 48.3 A uses 115 percent (the disconnect rule), and 63 A uses 150 percent.

    Reference: NFPA 70, National Electrical Code (2023), 430.22 and Table 430.250

  7. Which hazardous (classified) location class covers areas made hazardous by combustible dust, such as a grain-handling facility?

    Answer: Class II

    Section 500.5 defines Class I as flammable gases or vapors, Class II as combustible dust, and Class III as easily ignitable fibers or flyings. A grain elevator is a combustible-dust (Class II) location. There is no Class IV in the NEC.

    Reference: NFPA 70, National Electrical Code (2023), 500.5(C)

  8. An electric vehicle supply equipment (EVSE) unit has a maximum continuous load of 32 amperes at 240 volts. What is the minimum rating of overcurrent protection for its branch circuit under 625.41?

    Answer: 40 amperes

    Section 625.41 requires overcurrent protection sized for continuous duty at not less than 125 percent of the equipment's maximum load: 32 x 1.25 = 40 A. 32 A and 35 A fall short of 40 A, and 45 A is larger than the minimum.

    Reference: NFPA 70, National Electrical Code (2023), 625.41

  9. After the normal supply fails, within what time must an Article 700 emergency system have power available?

    Answer: Not more than 10 seconds

    Section 700.12 requires emergency power to be available within the time required for the application, but not more than 10 seconds. The 60-second limit applies to legally required standby systems (Article 701), and optional standby (Article 702) has no time limit.

    Reference: NFPA 70, National Electrical Code (2023), 700.12

  10. Vermont amends NEC 210.8(A)(11) for laundry areas. Within what distance of a washing machine or sink must receptacles have GFCI protection?

    Answer: Within 6 feet

    The Vermont rule replaces 210.8(A)(11) so that GFCI protection is required for receptacles installed within 6 ft of a washing machine or sink, instead of the NEC's blanket coverage of all laundry areas. This Vermont amendment controls over the base NEC text.

    Reference: 2025 Vermont Electrical Safety Rules, Section 5(a), amendment to NEC 210.8(A)(11)

Sources

Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.