Tennessee licensing exam

Tennessee Plumbing Contractor (CMC-A) Exam: Practice Test & Licensing Guide

The Prov trade exam for Tennessee's CMC-A plumbing contractor classification: 100 open-book questions on the 2021 IPC, fuel gas, isometrics, drain, waste and vent systems and plumbing math.

Questions
100
Time limit
5 hours
Passing score
73%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Drain, Waste, and Vent Systems

A 4-inch building drain will be laid at 1/4 inch per foot. Using the building drain table, what is the maximum number of drainage fixture units it may serve?

Requirements at a glance

AgencyTennessee Board for Licensing Contractors; exams by Prov
LicenseCMC-A plumbing contractor
Exams100 questions, 5 hours, 73%, plus the Business and Law exam
Books allowed2021 IPC, 2018 or 2021 IFGC, Mathematics for Plumbers and Pipefitters, Plumbing Basics for Contractors and 29 CFR 1926
Fees$53 per Prov exam attempt, plus the Board application ($250; renewal $200)

Qualifying individuals for a Tennessee CMC-A (plumbing) license from the Board for Licensing Contractors. CMC-A needs Board pre-approval of your experience.

How to get licensed, step by step

  1. Apply to the Board

    Send the Board your application. CMC and CMC-A applicants need pre-approval first (3 years of experience; $50 request). Trade-exam waivers exist for reciprocity states and NASCLA exams.

    Board: how to get a contractor license (opens in a new tab)Tennessee Board for Licensing Contractors (opens in a new tab)

  2. Schedule the Business and Law exam and the CMC-A exam with Prov

    Register with Prov and test at a testing center or at home with Examroom. You can retake with no waiting period at $53 per attempt.

    Schedule with Prov (Tennessee contractors) (opens in a new tab)Prov: register for your exam (opens in a new tab)

  3. Pass at 73%

    Every Tennessee contractor exam is open book and needs 73% to pass.

    Schedule with Prov (Tennessee contractors) (opens in a new tab)

  4. Get licensed

    Send your results to the Board with the $250 application fee and your financial statement. Limits depend on working capital and net worth, and from July 1, 2026 a surety bond can replace the statement.

    Board: how to get a contractor license (opens in a new tab)

How to prepare

  • Bring the editions on Prov's list: the 2017 NEC for electrical, the 2021 IPC, IMC and IFGC for plumbing and HVAC, the 2018 IRC for residential building and the 2021 IBC for commercial, industrial and mechanical. PSI-era books are accepted until 1/1/2027, then only Prov-recommended ones.
  • Tab your books before exam day with permanent tabs only. You can highlight, but moveable tabs are not allowed, and only a simple 4-function calculator is permitted.
  • Tennessee has no state journeyman or master license; cities and counties run their own cards and tests. These exams are for contractor classifications and the limited licenses (LLE and LLP).
  • Drain, waste and vent systems (20) and isometrics (18) are 38 of the 100 questions. Tab IPC Chapters 7 and 9 and the drain and vent sizing tables.
  • Fuel gas systems (10) come from the IFGC: gas pipe sizing tables, venting and testing.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2021 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Plumbing Code (IPC), 2021
  • International Fuel Gas Code (IFGC), 2018 or 2021
  • Mathematics for Plumbers and Pipefitters, 8th Edition
  • Plumbing Basics for Contractors, 4th Edition
  • 29 CFR 1926 (OSHA Construction)

What's on the exam

Official content outline from Prov (number of questions per topic):

TopicQuestions
General Knowledge6
Plumbing Math6
Code Requirements10
Fixtures & Fittings3
Water Heaters3
Storm Drainage4
Fuel Gas Systems10
OSHA Safety4
Isometrics18
Water Supply and Distribution10
Drain, Waste, and Vent Systems20
Tools and Installation Practices6

Exam day details

  • Administered by Prov for the Tennessee Board for Licensing Contractors.
  • Fee: $53 per exam to Prov, for a first attempt or a retake. Board application and license fees are separate.
  • 100 questions in 5 hours; 73% to pass.
  • CMC and CMC-A applicants need Board pre-approval (3 years of experience; $50 request).
  • Open book: bring your own copies of the listed references. You may highlight and add permanent tabs, but moveable tabs are not allowed. Only a simple 4-function calculator is permitted.
  • Test at a Prov testing center or at home with Examroom (remote proctoring). All Tennessee contractor exams need 73% to pass.
  • You may retake as many times as needed with no waiting period, at $53 per attempt. If you fail within 10 points of 73% you can request a review of your exam.
  • Prov replaced PSI as the Tennessee vendor on 7/1/2026. Reference lists accept PSI-era books until 1/1/2027, then only Prov-recommended ones.
  • Every new contractor takes the Business and Law exam plus a trade exam for the classification. Reciprocity or NASCLA exams can waive the trade exam.

Frequently asked questions

What's on the Tennessee CMC-A plumbing exam?

100 questions: drain, waste and vent systems 20, isometrics 18, code requirements 10, fuel gas systems 10, water supply and distribution 10, and smaller sections.

Which code is used?

The 2021 IPC, which Tennessee adopts without amendments, plus the IFGC (2018 or 2021) for fuel gas.

Is there a pre-approval step?

Yes. The Board must pre-approve CMC and CMC-A applicants (3 years of experience; $50 request) before you test.

Free questions with answers

Show all 10 free questions and answers
  1. A 4-inch building drain will be laid at 1/4 inch per foot. Using the building drain table, what is the maximum number of drainage fixture units it may serve?

    Answer: 216

    Table 710.1(1), 4-inch row: 180 dfu at 1/8 inch per foot, 216 dfu at 1/4 inch per foot and 250 dfu at 1/2 inch per foot. The 180 value is the 1/8 inch slope, and 480 is the 5-inch pipe at 1/4 inch per foot.

    Reference: 2021 International Plumbing Code, Table 710.1(1)

  2. A trunk line for a small shop must supply 450,000 Btu/h of natural gas appliances at 1,000 Btu per cubic foot (inlet under 2 psi, 0.5 in. w.c. drop, SG 0.60, Schedule 40 steel). The longest length from the meter to the farthest appliance is 40 feet. Using Table 402.4(2), what is the smallest nominal size for the trunk line?

    Answer: 1-1/4 inch

    450,000 Btu/h divided by 1,000 gives 450 cfh. In the 40 foot row, 1 inch carries 320 cfh (not enough), 1-1/4 inch carries 657 cfh, which covers it. 1-1/2 inch (985 cfh) works but is larger than the minimum asked for.

    Reference: 2021 International Fuel Gas Code, Table 402.4(2)

  3. Static pressure measured at the street main serving a new building is 92 psi. What does the code require for the building water distribution piping?

    Answer: A pressure-reducing valve with strainer limiting building pressure to no more than 80 psi static

    Section 604.8 requires an approved pressure-reducing valve with strainer (ASSE 1003 or CSA B356) where static pressure in the building exceeds 80 psi, reducing the distribution pressure to not more than 80 psi static. Exceptions cover sill cock and hydrant service lines.

    Reference: 2021 International Plumbing Code, Section 604.8

  4. On what basis are conductors, leaders and storm drains sized under the code unless local weather data shows otherwise?

    Answer: The 100-year, 1-hour rainfall rate

    Section 1106.1 bases the size of vertical conductors, leaders, building storm drains, building storm sewers and their horizontal branches on the 100-year hourly rainfall rate in Figures 1106.1(1) through 1106.1(5), or on other rates from approved local weather data.

    Reference: 2021 International Plumbing Code, Section 1106.1

  5. A 4-inch horizontal drain runs 48 feet at the minimum code slope. How much total vertical drop does the pipe have between its ends?

    Answer: 6 inches

    Table 704.1 gives a minimum slope of 1/8 inch per foot for 3 to 6 inch pipe. 48 ft x 1/8 inch = 6 inches of fall. 12 inches would result from using 1/4 inch per foot.

    Reference: 2021 International Plumbing Code, Table 704.1

  6. Two parallel runs of 4-inch drain are joined with 45-degree fittings. The offset must move the pipe 18 inches horizontally (set). Using a 45-degree multiplier of 1.414, what is the center-to-center travel of the offset piece?

    Answer: 25.5 inches

    For a 45-degree offset, travel = set x 1.414 = 18 x 1.414 = 25.45, about 25.5 inches. 12.7 inches comes from dividing by 1.414, 18.0 ignores the angle, and 31.2 uses the 60-degree multiplier of 1.732.

    Reference: Mathematics for Plumbers and Pipefitters, 8th Edition (concept: offsets with 45-degree fittings), Offset travel = set x 1.414

  7. How is the developed length of a pipeline measured?

    Answer: Along the centerline of the pipe and fittings

    Section 202 defines developed length as the length of a pipeline measured along the centerline of the pipe and fittings, so fittings and offsets add to the length used in vent length limits such as Table 906.1.

    Reference: 2021 International Plumbing Code, Section 202, Developed Length

  8. How far from the edge of an excavation must excavated soil and equipment be kept, at a minimum?

    Answer: 2 feet

    29 CFR 1926.651(j)(2) requires materials and equipment that could fall or roll into the excavation to be kept at least 2 feet from the edge, or restrained by retaining devices or both.

    Reference: 29 CFR 1926 (OSHA Construction), 1926.651(j)(2)

  9. Type L copper water tubing, 3/4 inch in diameter, is run horizontally in a basement. What is the maximum hanger spacing?

    Answer: 6 feet

    Table 308.5 sets copper tubing of 1-1/4 inches and smaller at 6 feet horizontal and larger tubing (1-1/2 inches and up) at 10 feet. The 12 foot value is for copper or copper-alloy pipe (not tubing) and steel pipe.

    Reference: 2021 International Plumbing Code, Table 308.5

  10. Backfilling a trench over a new drain: how must the backfill be placed around and over the pipe?

    Answer: In 6-inch layers of loose earth, tamped until the crown is covered by 12 inches

    Section 306.3 requires loose earth free of rocks, broken concrete and frozen chunks to be placed in 6-inch layers and tamped until the crown of the pipe has 12 inches of tamped earth over it, with backfill brought up evenly on both sides.

    Reference: 2021 International Plumbing Code, Section 306.3

Sources

Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.