Tennessee licensing exam

Tennessee Limited Licensed Plumber (LLP) Exam: Practice Test & Licensing Guide

The Prov exam for Tennessee's limited licensed plumber (LLP) license: 40 open-book questions on the 2021 IPC, drain, waste and vent systems, isometrics and fuel gas for work under $25,000.

Questions
40
Time limit
2 hours
Passing score
73%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Drain, Waste, and Vent Systems

A 3-inch horizontal drain makes a single 90-degree change of horizontal direction under a slab. What does the code require at that change of direction?

Requirements at a glance

AgencyTennessee Board for Licensing Contractors; exams by Prov
LicenseLimited licensed plumber (LLP, work under $25,000)
Exams40 questions, 2 hours, 73%
Books allowed2021 IPC, 2021 IFGC, Mathematics for Plumbers and Pipefitters, Plumbing Basics for Contractors and 29 CFR 1926
Fees$53 per Prov exam attempt, plus the license fee

Plumbers doing work under $25,000 who need a Tennessee LLP license from the Board for Licensing Contractors.

How to get licensed, step by step

  1. Apply to the Board

    Send the Board your application. CMC and CMC-A applicants need pre-approval first (3 years of experience; $50 request). Trade-exam waivers exist for reciprocity states and NASCLA exams.

    Board: how to get a contractor license (opens in a new tab)Tennessee Board for Licensing Contractors (opens in a new tab)

  2. Schedule the LLP exam with Prov

    Register with Prov and test at a testing center or at home with Examroom. You can retake with no waiting period at $53 per attempt.

    Schedule with Prov (Tennessee contractors) (opens in a new tab)Prov: register for your exam (opens in a new tab)

  3. Pass at 73%

    Every Tennessee contractor exam is open book and needs 73% to pass.

    Schedule with Prov (Tennessee contractors) (opens in a new tab)

  4. Get licensed

    Send your results to the Board with the license fee.

    Board: how to get a contractor license (opens in a new tab)

How to prepare

  • Bring the editions on Prov's list: the 2017 NEC for electrical, the 2021 IPC, IMC and IFGC for plumbing and HVAC, the 2018 IRC for residential building and the 2021 IBC for commercial, industrial and mechanical. PSI-era books are accepted until 1/1/2027, then only Prov-recommended ones.
  • Tab your books before exam day with permanent tabs only. You can highlight, but moveable tabs are not allowed, and only a simple 4-function calculator is permitted.
  • Tennessee has no state journeyman or master license; cities and counties run their own cards and tests. These exams are for contractor classifications and the limited licenses (LLE and LLP).
  • Drain, waste and vent systems (10) and isometrics (7) are 17 of the 40 questions.
  • Know the IPC Chapter 7 and 9 sizing tables and the IFGC gas sizing tables.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2021 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Plumbing Code (IPC), 2021
  • International Fuel Gas Code (IFGC), 2021
  • Mathematics for Plumbers and Pipefitters, 8th Edition
  • Plumbing Basics for Contractors, 4th Edition
  • 29 CFR 1926 (OSHA Construction)

What's on the exam

Official content outline from Prov (number of questions per topic):

TopicQuestions
General Knowledge3
Plumbing Math2
Code Requirements4
Water Supply and Distribution4
Water Heaters2
Drain, Waste, and Vent Systems10
Fixtures & Fittings2
Isometrics7
Fuel Gas Systems4
OSHA Safety2

Exam day details

  • Administered by Prov for the Tennessee Board for Licensing Contractors.
  • Fee: $53 per exam to Prov, for a first attempt or a retake. Board application and license fees are separate.
  • 40 questions in 2 hours; 73% to pass.
  • LLP fees: $75 initial, $50 renewal, $50 application (biennial). It needs 1 year of plumbing experience; maintenance work under $500 is exempt.
  • Open book: bring your own copies of the listed references. You may highlight and add permanent tabs, but moveable tabs are not allowed. Only a simple 4-function calculator is permitted.
  • Test at a Prov testing center or at home with Examroom (remote proctoring). All Tennessee contractor exams need 73% to pass.
  • You may retake as many times as needed with no waiting period, at $53 per attempt. If you fail within 10 points of 73% you can request a review of your exam.
  • Prov replaced PSI as the Tennessee vendor on 7/1/2026. Reference lists accept PSI-era books until 1/1/2027, then only Prov-recommended ones.
  • Every new contractor takes the Business and Law exam plus a trade exam for the classification. Reciprocity or NASCLA exams can waive the trade exam.

Frequently asked questions

What's on the Tennessee LLP exam?

40 questions: drain, waste and vent systems 10, isometrics 7, code requirements 4, water supply and distribution 4, fuel gas systems 4, and smaller sections.

Which code is used?

The 2021 IPC, which Tennessee adopts without amendments, and the 2021 IFGC.

What work does an LLP cover?

Plumbing work under $25,000.

Free questions with answers

Show all 10 free questions and answers
  1. A 3-inch horizontal drain makes a single 90-degree change of horizontal direction under a slab. What does the code require at that change of direction?

    Answer: A cleanout installed at the change of direction

    Section 708.1.4 requires a cleanout wherever a horizontal drain changes direction by more than 45 degrees. A 90-degree turn exceeds 45 degrees, so no length condition applies. Where several such turns fall within 40 feet of developed length, the first cleanout serves all of them.

    Reference: 2021 International Plumbing Code, Section 708.1.4

  2. An isometric for a small house shows one bathroom group (1.6 gpf water closet), a kitchen sink with a dishwasher, and a residential clothes washer, all draining to one building drain. What is the smallest building drain size the code allows for this load?

    Answer: 3 inches

    Fixture units: bathroom group 5 + kitchen sink with dishwasher 2 + clothes washer 2 = 9 dfu (Table 709.1). Table 710.1(1) would allow smaller pipe for 9 dfu, but footnote a says a building drain serving a water closet must be at least 3 inches. 4 inches is larger than required.

    Reference: 2021 International Plumbing Code, Table 710.1(1) footnote a; Table 709.1

  3. A natural gas line (inlet pressure under 2 psi, 0.5 in. w.c. drop, specific gravity 0.60) runs 60 feet of developed length to a single furnace rated at 150,000 Btu/h. Assume 1,000 Btu per cubic foot. Using the Schedule 40 metallic pipe table, what is the smallest pipe size that serves the furnace?

    Answer: 1 inch

    150,000 Btu/h / 1,000 Btu/ft3 = 150 cfh. In Table 402.4(2) the 60 foot row shows 65 cfh for 1/2 inch, 137 cfh for 3/4 inch and 257 cfh for 1 inch. 137 is under 150, so 3/4 inch is too small and 1 inch is the smallest size that works.

    Reference: 2021 International Fuel Gas Code, Table 402.4(2); Section 402.2

  4. Which description matches a fixture drain as defined in the plumbing code?

    Answer: The drain from the trap of a fixture to its junction with any other drain pipe

    Section 202 defines a fixture drain as the drain from the trap of a fixture to a junction with any other drain pipe. A stack is the vertical pipe through several floors, and the building drain and sewer leave the building.

    Reference: 2021 International Plumbing Code, Section 202, Fixture Drain

  5. A 60-degree offset must move a pipe run sideways (set) 18 inches. Using the offset constant 1.155 for 60-degree fittings, what is the travel (center-to-center length of the offset piece)?

    Answer: 20.8 inches

    Travel = set x constant. For 60-degree fittings the constant is 1.155: 18 x 1.155 = 20.79, or about 20.8 inches. 15.6 divides instead of multiplies, 25.5 uses the 45-degree constant 1.414, and 47.0 uses the 22-1/2 degree constant 2.613.

    Reference: Mathematics for Plumbers and Pipefitters, 8th Edition, offset travel = set x fitting constant

  6. A plumber works in a trench below a worker who is passing pipe, creating a danger of falling objects. Which standard requires head protection against falling or flying objects?

    Answer: 29 CFR 1926.100, which requires protective helmets

    29 CFR 1926.100(a) requires employees working where there is a possible danger of head injury from impact, falling or flying objects, or electrical shock and burns to wear protective helmets. The other sections address fall protection, ladders and excavation protective systems.

    Reference: 29 CFR 1926 (OSHA Construction), 1926.100(a)

  7. A copper water line passes through a steel stud and the plumber wraps it in plastic sheathing to prevent direct metal contact. What is the minimum thickness of the sheathing?

    Answer: 0.008 inch (8 mil)

    Section 305.1 prohibits direct contact between metallic piping (other than cast iron, ductile iron and galvanized steel) and steel framing, concrete, cinder or masonry, and corrosive soil. Where sheathing is used, it must be plastic of at least 0.008 inch (8 mil), and where it protects pipe through concrete or masonry it must allow the pipe to move.

    Reference: 2021 International Plumbing Code, Section 305.1

  8. A CPVC water pipe will be threaded for a transition to a threaded fitting. What does Section 605.14.3 require?

    Answer: Schedule 80 or heavier wall, and the pressure rating is reduced by 50 percent

    Section 605.14.3 requires CPVC pipe to be threaded to have a wall thickness of at least Schedule 80, cut with dies made for plastic pipe, and the pressure rating of threaded pipe is reduced by 50 percent. Thread lubricant or tape goes on the male threads only.

    Reference: 2021 International Plumbing Code, Section 605.14.3

  9. A water heater pan drain extends to the outside of the building. How far above the adjacent ground must it terminate?

    Answer: Not less than 6 inches and not more than 24 inches

    Section 504.7.2 requires a pan drain to extend full size and terminate over an indirect waste receptor or floor drain, or extend outside to a point at least 6 inches and no more than 24 inches above the adjacent ground. A pan drain is not required for a replacement heater if none was installed before.

    Reference: 2021 International Plumbing Code, Section 504.7.2

  10. What is the minimum interior cross-sectional area of a standard shower compartment, and its minimum dimension?

    Answer: 900 square inches, and not less than 30 inches in least dimension

    Section 421.4 requires shower compartments of at least 900 square inches and at least 30 inches in least finished interior dimension, measured at the threshold up to 70 inches above the drain. The exception allows 25 inches least dimension if the area is at least 1,300 square inches.

    Reference: 2021 International Plumbing Code, Section 421.4

Sources

Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.