Requirements at a glance
| Agency | Tennessee Board for Licensing Contractors; exams by Prov |
|---|---|
| License | CE electrical contractor |
| Exams | 100 questions, 5 hours, 73%, plus the Business and Law exam |
| Books allowed | 2017 NEC, Ugly's Electrical References 2020 and 29 CFR 1926 |
| Fees | $53 per Prov exam attempt, plus the Board application ($250; renewal $200) |
Qualifying individuals for a Tennessee CE (electrical contractor) license from the Board for Licensing Contractors.
Official links
How to get licensed, step by step
Apply to the Board
Send the Board your application. CMC and CMC-A applicants need pre-approval first (3 years of experience; $50 request). Trade-exam waivers exist for reciprocity states and NASCLA exams.
Board: how to get a contractor license (opens in a new tab)Tennessee Board for Licensing Contractors (opens in a new tab)
Schedule the Business and Law exam and the CE exam with Prov
Register with Prov and test at a testing center or at home with Examroom. You can retake with no waiting period at $53 per attempt.
Schedule with Prov (Tennessee contractors) (opens in a new tab)Prov: register for your exam (opens in a new tab)
Pass at 73%
Every Tennessee contractor exam is open book and needs 73% to pass.
Schedule with Prov (Tennessee contractors) (opens in a new tab)
Get licensed
Send your results to the Board with the $250 application fee and your financial statement. Limits depend on working capital and net worth, and from July 1, 2026 a surety bond can replace the statement.
How to prepare
- Bring the editions on Prov's list: the 2017 NEC for electrical, the 2021 IPC, IMC and IFGC for plumbing and HVAC, the 2018 IRC for residential building and the 2021 IBC for commercial, industrial and mechanical. PSI-era books are accepted until 1/1/2027, then only Prov-recommended ones.
- Tab your books before exam day with permanent tabs only. You can highlight, but moveable tabs are not allowed, and only a simple 4-function calculator is permitted.
- Tennessee has no state journeyman or master license; cities and counties run their own cards and tests. These exams are for contractor classifications and the limited licenses (LLE and LLP).
- Wiring and protection (23) and wiring methods and materials (15) are 38 of the 100 questions: tab Articles 210, 215, 220, 230, 240, 250 and Chapter 3.
- The NEC edition on the list is 2017. Use that edition's tables and rules, not a newer book.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2017 NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2017 EditionEssential
Allowed in the exam room. Tennessee adopts the 2017 edition with amendments.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Ugly's Electrical References, 2020 Edition
Allowed in the exam room. Formulas for voltage drop, power, motors and transformers.
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code (NEC), 2017
- Ugly's Electrical References, 2020
- 29 CFR 1926 (OSHA Construction)
- Alternates listed by Prov: NFPA 70E (2017) and the International Building Code (2021)
What's on the exam
Official content outline from Prov (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Electrical Knowledge | 14 | |
| Plan Reading | 2 | |
| Code Reading | 5 | |
| Wiring and Protection | 23 | |
| Wiring Methods and Materials | 15 | |
| Equipment for General Use | 6 | |
| Motors and Controls | 10 | |
| Communication Systems | 7 | |
| Special Occupancy | 4 | |
| Special Equipment | 4 | |
| Hazardous Locations | 4 | |
| OSHA Safety | 6 |
Exam day details
- Administered by Prov for the Tennessee Board for Licensing Contractors.
- Fee: $53 per exam to Prov, for a first attempt or a retake. Board application and license fees are separate.
- 100 questions in 5 hours; 73% to pass.
- The Prov bulletin lists the 2017 NEC. Tennessee adopts it with amendments: available fault current (110.24) is optional, and AFCIs are optional in bathrooms, laundry areas, garages, unfinished basements and refrigeration circuits. We could not check the 2017 NEC text itself against an official copy, so confirm the edition on the current Prov bulletin for your test date.
- Open book: bring your own copies of the listed references. You may highlight and add permanent tabs, but moveable tabs are not allowed. Only a simple 4-function calculator is permitted.
- Test at a Prov testing center or at home with Examroom (remote proctoring). All Tennessee contractor exams need 73% to pass.
- You may retake as many times as needed with no waiting period, at $53 per attempt. If you fail within 10 points of 73% you can request a review of your exam.
- Prov replaced PSI as the Tennessee vendor on 7/1/2026. Reference lists accept PSI-era books until 1/1/2027, then only Prov-recommended ones.
- Every new contractor takes the Business and Law exam plus a trade exam for the classification. Reciprocity or NASCLA exams can waive the trade exam.
Note: The Prov bulletin lists the 2017 NEC. Tennessee adopts it with amendments: available fault current (110.24) is optional, and AFCIs are optional in bathrooms, laundry areas, garages, unfinished basements and refrigeration circuits. We could not check the 2017 NEC text itself against an official copy, so confirm the edition on the current Prov bulletin for your test date.
Frequently asked questions
What's on the Tennessee CE exam?
100 questions: wiring and protection 23, wiring methods and materials 15, general electrical knowledge 14, motors and controls 10, communication systems 7, equipment for general use 6, OSHA safety 6, code reading 5, and smaller sections.
Which NEC edition is used?
The Prov bulletin lists the 2017 NEC. Tennessee adopts it with amendments.
Do I also need Business and Law?
Yes. Every new Tennessee contractor takes Business and Law plus the trade exam, unless a trade-exam waiver applies.
Free questions with answers
Show all 10 free questions and answers
A balanced three-phase, 208-volt load is rated 36 kVA. What is the approximate line current?
Answer: 100 amperes
I = VA / (1.732 x E) = 36,000 / (1.732 x 208) = 36,000 / 360.3 = 99.9, or about 100 A. 173 A results from dividing by 208 only (no 1.732), and 58 A from dividing 100 by 1.732 a second time.
Reference: General electrical theory: three-phase current, Three-phase power formula
Which table in the 2017 NEC gives allowable ampacities of insulated conductors rated up to 2,000 volts, not more than three current-carrying conductors in raceway, cable or earth, at 30 degrees C ambient?
Answer: Table 310.15(B)(16)
Table 310.15(B)(16) in the 2017 edition is the general ampacity table (it moved to 310.16 in later editions). Table 310.15(B)(2)(a) holds ambient-temperature correction factors, Table 310.104(A) describes insulation types, and Chapter 9 Table 8 lists conductor properties.
Reference: 2017 National Electrical Code (NFPA 70), Table 310.15(B)(16)
A branch circuit supplies a continuous load of 24 amperes and no other load. What is the minimum overcurrent device rating allowed by Section 210.20(A), assuming the device is not listed for 100 percent operation?
Answer: 30 amperes
The device must carry the continuous load at 125 percent: 24 x 1.25 = 30 A. 30 A is a standard size under 240.6(A). A 24-A or 25-A device would be loaded above 80 percent for 3 hours or more.
Reference: 2017 National Electrical Code (NFPA 70), 210.20(A)
What is the minimum cover for a direct-buried Type UF cable under a lawn, not subject to any special exception?
Answer: 24 inches
Table 300.5, Column 1, requires 24 in. for direct-buried cables. The 12-in. depth applies only to residential branch circuits of 120 V or less with 20-A protection and GFCI (Column 4), and 18 in. is for nonmetallic raceways.
Reference: 2017 National Electrical Code (NFPA 70), Table 300.5, Column 1
What is the maximum height above the floor for the center of the grip of a wall switch operating a general lighting circuit?
Answer: 6 feet 7 inches
Section 404.8(A) requires the center of the grip of the operating handle of a switch or circuit breaker, in its highest position, to be not more than 6 ft 7 in. above the floor or working platform. Some installations are exempt, such as certain busway switches.
Reference: 2017 National Electrical Code (NFPA 70), 404.8(A)
A 15-horsepower, 460-volt, three-phase motor has a Table 430.250 FLC of 21 amperes. What is the maximum rating of an inverse-time circuit breaker for branch-circuit short-circuit and ground-fault protection, allowing the next higher standard size where permitted?
Answer: 60 amperes
Table 430.52 allows 250 percent of FLC for an inverse-time breaker: 21 x 2.5 = 52.5 A. Section 430.52(C)(1), Exception 1, permits the next higher standard rating (240.6) when the value does not match one, so 60 A. 50 A rounds down, which is not required here, and 35 A is the figure for a 10-hp motor.
Reference: 2017 National Electrical Code (NFPA 70), 430.52(C)(1) and Table 430.52
Under Section 800.100(A), what is the minimum size of the copper bonding conductor or grounding electrode conductor run from a communications primary protector to the building grounding means?
Answer: 14 AWG copper
Section 800.100(A)(3) sets the minimum size at 14 AWG, with a current-carrying capacity not less than the protected conductors and sheath. In the 2017 edition the conductor must be listed and may be insulated, covered or bare (800.100(A)(1)). 18 AWG is a signal-cable size and is too small.
Reference: 2017 National Electrical Code (NFPA 70), 800.100(A)(3)
Within what maximum time must an emergency system under Article 700 supply power to the load after loss of the normal source?
Answer: 10 seconds
Section 700.12 requires emergency power to be available within 10 seconds of loss of the normal supply. Legally required standby systems under 701.12 have 60 seconds. Optional standby systems (Art. 702) have no time requirement.
Reference: 2017 National Electrical Code (NFPA 70), 700.12
What is the minimum number of 20-ampere branch circuits that must be provided for sign and outline lighting in each commercial occupancy accessible to pedestrians?
Answer: One
Section 600.5(A) requires each commercial building and occupancy accessible to pedestrians to have at least one 20-A branch circuit dedicated to sign or outline lighting, with no other outlets, installed on the exterior of a building or in a location accessible to the sign.
Reference: 2017 National Electrical Code (NFPA 70), 600.5(A)
What is the proper setup angle for a non-self-supporting portable ladder?
Answer: One foot of horizontal distance for every four feet of working length (4:1)
29 CFR 1926.1053(b)(5)(i) requires non-self-supporting ladders to be positioned at an angle such that the horizontal distance from the top support to the base is about one-quarter of the working length of the ladder. A 12-ft working length sits 3 ft out.
Reference: 29 CFR 1926 (OSHA Construction Standards), 29 CFR 1926.1053(b)(5)(i)
Sources
- Prov: Tennessee Contractor Candidate Information Bulletin (TNCONT_CIB 2026.08.18) (opens in a new tab)
- Tennessee Board for Licensing Contractors: how to get a contractor license (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.