South Dakota licensing exam

South Dakota Plumbing Contractor Exam: Practice Test & Licensing Guide

The state exam for a South Dakota plumbing contractor license: three parts on the 2024 Uniform Plumbing Code, including a fixture-drawing and pipe-sizing part. 80% to pass.

Questions
Not published by South Dakota
Time limit
5 hours
Passing score
80%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Chapter 3: General Regulations

A tunnel is to be driven between two open-cut trenches at a depth of 14 feet. What is the longest tunnel length the 2024 UPC allows?

Requirements at a glance

AgencySouth Dakota Plumbing Commission (Department of Labor and Regulation); state-administered exam
Experience6 years in the trade at 1,900 hours a year, at least 2 as a plumber or plumbing contractor
ExamThree parts, 5 hours in all; 80% to pass; question count not published
Books allowed2024 UPC (Part 1 open book; Part 2 closed book; confirm Part 3 with the Commission)
Fees$100 exam fee, plus application and license fees

Plumbers applying to the South Dakota Plumbing Commission for a plumbing contractor license after 6 years in the trade at 1,900 hours a year, at least 2 of them as a plumber or plumbing contractor.

How to get licensed, step by step

  1. Apply to the Commission

    Submit the plumbing application with the application fee. The Commission emails you if approved and tells you the next steps.

    South Dakota Plumbing Commission (opens in a new tab)

  2. Schedule your exam

    Exams are held in Pierre by appointment, and in Rapid City and Sioux Falls when 8 to 10 candidates apply. The exam fee is $100.

    South Dakota Plumbing Commission (opens in a new tab)

  3. Pass all three parts

    Part 1 (2 hours) and Part 2 (2 hours) are code questions; Part 3 (1 hour) is fixture drawings with pipe sizing. If you fail you may retest once every 3 months.

    ARSD 20:53:03:07: plumber examination requirements (opens in a new tab)

  4. Get licensed and renew

    Plumbing licenses expire every December 31. Licensees who tested in must show continuing education before renewal.

    South Dakota Plumbing Commission (opens in a new tab)

How to prepare

  • The Plumbing Commission gives its own exam (no outside vendor is named) in three parts: two code parts and a drawing part where you size stacks, wastes and vents. Part 1 is open book and Part 2 is closed book.
  • The code is the 2024 UPC with South Dakota amendments. The Commission sells the 2024 UPC and a 2024 UPC Study Guide. The Commission does not publish question counts or topic weights, so ours are estimates.
  • Practice fixture-unit counting and drain, waste and vent sizing from a described layout (UPC Chapters 7 and 9 and the sizing tables), since Part 3 tests it.
  • Contractors need 80% (ARSD 20:53:03:07), and Part 3 may use the code. Practice the full sizing workflow: fixture units, drain size, vent size and developed length.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the UPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • Uniform Plumbing Code (UPC), 2024 Edition (IAPMO) with South Dakota amendments. Part 1 is open book; Part 2 is closed book.

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Chapter 3: General Regulations5
Chapter 4: Plumbing Fixtures and Fixture Fittings7
Chapter 5: Water Heaters5
Chapter 6: Water Supply and Distribution10
Chapter 7: Sanitary Drainage14
Chapter 8: Indirect Wastes3
Chapter 9: Vents14
Chapter 10: Traps and Interceptors5
Chapter 11: Storm Drainage7
Chapter 12: Fuel Gas Piping5
Pipe Sizing and Drawings25

Exam day details

  • Administered by the South Dakota Plumbing Commission (state-administered exam).
  • Fee: $100 exam fee to the Plumbing Commission. Application and license fees are separate.
  • Three parts totaling 5 hours; 80% to pass for contractors (ARSD 20:53:03:07). Part 1 is open book, Part 2 is closed book and in Part 3 the code may be used.
  • The exam has three parts: Part 1 (2 hours, code questions, open book), Part 2 (2 hours, code questions, closed book) and Part 3 (1 hour, fixture drawings where you size stacks, wastes and vents and insert pipe sizes).
  • The Commission approves your application first, then you schedule. Exams are given in Pierre by appointment, with Rapid City and Sioux Falls sessions when 8 to 10 candidates apply.
  • You may retest once every 3 months after a failure.
  • Our questions follow the 2024 UPC. South Dakota amendments could not be checked, so confirm them with the Commission's code book.

Note: The Plumbing Commission does not publish the number of questions or the topic weights, so the question count and topic split here are our estimates. The 2024 UPC is the adopted code, but South Dakota's amendments could not be checked. Confirm details with the Commission.

Frequently asked questions

What's on the South Dakota plumbing contractor exam?

Parts 1 and 2 are questions based on the code. Part 3 is fixture drawings where you size stacks, wastes and vents and insert pipe sizes. The Commission publishes no topic weights, so our split is an estimate.

What score do I need?

80% for the plumbing contractor exam and 70% for the plumber exam (ARSD 20:53:03:07).

Which plumbing code does South Dakota use?

The 2024 Uniform Plumbing Code with South Dakota amendments.

Free questions with answers

Show all 10 free questions and answers
  1. A tunnel is to be driven between two open-cut trenches at a depth of 14 feet. What is the longest tunnel length the 2024 UPC allows?

    Answer: 7 feet

    Section 314.2 limits a tunnel to one-half the trench depth with a maximum of 8 feet: 14 ft x 1/2 = 7 ft, which is under the 8 ft cap. Eight feet would be reached only at depths of 16 feet or more. The tunnel must also have 2 feet of clear height above the pipe.

    Reference: 2024 Uniform Plumbing Code, Section 314.2

  2. A caulked-on closet flange is being specified for a cast-iron stub. What minimum thickness and overall depth does the 2024 UPC require?

    Answer: 1/4 inch thick and 2 inches deep

    Section 402.6.1 requires caulked-on closet rings to be not less than 1/4 inch (6.4 mm) thick and not less than 2 inches (51 mm) in overall depth. Closet bends or stubs must also be cut off even with the top of the ring before the rough inspection is called.

    Reference: 2024 Uniform Plumbing Code, Section 402.6.1

  3. A faucet spout has a 3/4 inch effective opening and an air gap is the only backflow protection. The outlet is affected by sidewalls. What minimum air gap does Table 603.3.1 require?

    Answer: 2-1/4 inches

    Table 603.3.1 gives, for effective openings not greater than 3/4 inch, 1-1/2 inches where not affected by sidewalls and 2-1/4 inches where affected by sidewalls. The 1-1/2 inch value ignores the sidewalls; 3 inches is the sidewall value for a 1 inch opening.

    Reference: 2024 Uniform Plumbing Code, Table 603.3.1

  4. Where seismic strapping is required on a water heater under the 2024 UPC, where must the straps be located?

    Answer: Upper and lower thirds of the height; lower strap kept at least 4 inches from the controls

    Section 507.2 places the straps within the upper one-third and lower one-third of the vertical dimension. At the lower point, a distance of not less than 4 inches must be maintained between the strapping and the controls.

    Reference: 2024 Uniform Plumbing Code, Section 507.2

  5. What minimum clear working space must be kept in front of a cleanout on a 3 inch drain under the 2024 UPC?

    Answer: 24 inches by 24 inches

    Section 707.9 requires 18 by 18 inches in front of cleanouts in piping 2 inches or smaller, and 24 by 24 inches for piping larger than 2 inches. A 3 inch drain is larger than 2 inches, so the 24 inch clearance applies.

    Reference: 2024 Uniform Plumbing Code, Section 707.9

  6. What is the maximum pressure differential the vent system may allow on the outlet side of a trap, according to the 2024 UPC?

    Answer: 1 inch of water column

    Section 901.3 requires the vent system to be designed so a trap seal is not exposed to a pressure differential exceeding 1 inch of water column on the outlet side of the trap.

    Reference: 2024 Uniform Plumbing Code, Section 901.3

  7. What is the maximum developed length of the trap arm for a 2 inch fixture drain (not a water closet) under Table 1002.2?

    Answer: 5 feet

    Table 1002.2 limits the trap arm length from trap weir to vent to 60 inches (5 feet) for a 2 inch trap arm, and the slope is 1/4 inch per foot. The 3-1/2 foot figure is for a 1-1/2 inch arm, 6 feet is for 3 inch, and 10 feet is for 4 inch.

    Reference: 2024 Uniform Plumbing Code, Table 1002.2

  8. What type of strainer must a typical roof drain have under the 2024 UPC?

    Answer: A dome strainer

    Section 1102.2 requires domed strainers on roof drains. Flat strainers level with the deck are an exception for sun decks, parking decks and similar areas that are normally serviced and maintained.

    Reference: 2024 Uniform Plumbing Code, Section 1102.2

  9. Underground gas piping is installed in a yard where vehicle damage is likely. What minimum cover does the 2024 UPC require?

    Answer: 18 inches

    Section 1210.1.1 requires 12 inches of cover, increased to 18 inches if external damage from outside forces is likely. If 12 inches cannot be provided, the piping must be in conduit.

    Reference: 2024 Uniform Plumbing Code, Section 1210.1.1

  10. A public restroom has 4 water closets (1.6 gpf flushometer valve), 2 urinals (integral trap, 1.0 gpf) and 3 lavatories. Using the public-use column of Table 702.1, what is the DFU load?

    Answer: 23 DFU

    Public column: water closet 4, urinal 2, lavatory 1. Total = (4 x 4) + (2 x 2) + (3 x 1) = 16 + 4 + 3 = 23 DFU. Using private water closet values (3) gives 19, and counting urinals at the assembly value of 5 gives 29.

    Reference: 2024 Uniform Plumbing Code, Table 702.1

Sources

Questions last verified November 7, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.