South Carolina licensing exam

South Carolina Plumber (Commercial Plumbing Contractor) Exam: Practice Test & Licensing Guide

PSI's open-book technical exam for South Carolina's commercial plumbing contractor classification: 80 questions on the IPC and IFGC, including drainage, venting, isometric analysis and fuel gas.

Questions
80
Time limit
4 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Plumbing Knowledge

A sewer trench is being backfilled over a new PVC building drain. Loose, rock-free earth is placed and tamped. What are the maximum layer depth and the minimum tamped cover over the crown of the pipe?

Requirements at a glance

AgencySouth Carolina Department of Labor, Licensing and Regulation (LLR), Contractor's Licensing Board; exams by PSI
ExperienceThe primary qualifying party needs 2 of the last 5 years of full-time experience in the classification, in a management role (S.C. Code 40-11-230)
ExamsPlumber: 80 questions, 4 hours, 70%, plus Business Management and Law (Commercial); 70% on each
Books allowedIPC and IFGC 2021 or 2024 (SC), Mathematics for Plumbers and Pipefitters and the SC 811 manual
FeesPSI exam fees ($64 to $78 per exam), plus the Board's application and license fees and a financial statement or bond

Applicants for a South Carolina Contractor's Licensing Board mechanical license in the Plumbing classification.

How to get licensed, step by step

  1. Check the work needs a license

    South Carolina requires a Contractor's Licensing Board license for commercial work above $10,000 in job cost (S.C. Code 40-11-30). Commercial licenses also cover residential work.

    SC Contractor's Licensing Board (LLR) (opens in a new tab)S.C. Code Title 40 Chapter 11 (contractors) (opens in a new tab)

  2. Apply to the Board

    Apply to the Contractor's Licensing Board for an eligibility letter before you register with PSI.

    SC Contractor's Licensing Board (LLR) (opens in a new tab)

  3. Schedule Business and Law and the plumber exam with PSI

    Register for each exam separately. You may take each trade exam twice in 12 months, then once every six months. Commercial Business and Law has no such limit.

    Schedule with PSI (commercial contractors) (opens in a new tab)

  4. Apply for the license

    After you pass, the business entity applies with its primary qualifying party, a financial statement or bond, and the license fee. The group (1 to 5) sets the dollar limit of work you may bid.

    SC Contractor's Licensing Board (LLR) (opens in a new tab)S.C. Code Title 40 Chapter 11 (contractors) (opens in a new tab)

How to prepare

  • Code editions are changing. From November 1, 2026 PSI accepts the 2021 or the 2024 South Carolina codes (ICC codes with state modifications) and the 2023 or the 2020 NEC. After July 1, 2027 only the 2024 codes and the 2023 NEC. Bring one edition you know well and expect questions that read the same in both.
  • Tab your books before exam day: highlighting, underlining and permanent tabs are allowed, but sticky notes and writing during the exam are not.
  • Isometric analysis is 17 of 80 questions (DWV 10, water supply 4, roof drain 3) plus 5 on developed length: practice fixture-unit totals and pipe sizing from IPC Chapters 6, 7, 9 and 11.
  • Sanitary venting (6) and general plumbing knowledge (6) are the next largest topics. Tab the venting and trap chapters.
  • Fuel gas (natural gas, LP-gas and general knowledge, 9 together) comes from the IFGC: pipe sizing tables and appliance connections.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the SC IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Plumbing Code (IPC), 2021 or 2024 edition with South Carolina modifications
  • International Fuel Gas Code (IFGC), 2021 or 2024 edition with South Carolina modifications
  • Mathematics for Plumbers and Pipefitters, 8th Edition
  • SC 811 excavator manual (all on PSI's list)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
ADA Accessibility1
General Plumbing Knowledge6
General Plumbing Regulations3
Hangers and Supports2
Materials2
Joints and Connections3
Fixtures and Equipment3
Water Heaters4
Water Supply and Distribution3
Backflow Prevention1
Sanitary Drainage Systems4
Cleanouts2
Indirect and Special Waste2
Sanitary Venting6
Traps and Interceptors3
Storm Piping Systems2
Plumbing - Developed Length5
DWV Isometric Analysis10
Water Supply Isometric Analysis4
Roof Drain Isometric Analysis3
Pipe Assembly1
Valves1
General Fuel Knowledge3
Natural Gas3
LP-Gas3

Exam day details

  • Administered by PSI Services for the South Carolina Department of Labor, Licensing and Regulation (Contractor's Licensing Board).
  • Fee: $78 to PSI. Board application and license fees are separate.
  • 80 scored questions plus 1 to 10 unscored experimental items (they count against your time) in 240 minutes; 56 correct (70%) to pass.
  • Code editions: from November 1, 2026 PSI accepts the 2021 or 2024 South Carolina codes (NEC 2023 or 2020); after July 1, 2027 only the 2024 codes and the 2023 NEC. Our questions are written to be correct under both.
  • Open book: bring the references on PSI's list. You may highlight, underline and add permanent tabs (tabs that would tear the page if removed); sticky notes and removable tabs are not allowed.
  • Apply to the Contractor's Licensing Board first. After approval you get an eligibility letter and register with PSI (855-340-3701) for each exam; the registration confirmation is valid 1 year or until a classification has been failed twice.
  • You may take each trade exam twice in 12 months, then once every six months.
  • Every Contractor's Licensing Board license needs the Business Management and Law exam and the technical exam for the classification, 70% on each (S.C. Code 40-11-230).

Frequently asked questions

What's on the South Carolina plumber exam?

80 scored questions, led by DWV Isometric Analysis 10, general plumbing knowledge 6, sanitary venting 6, plumbing - developed length 5, water heaters 4, sanitary drainage systems 4, water supply isometric analysis 4, general plumbing regulations 3 and 17 smaller topics.

How much of the plumber exam is isometric analysis?

17 of 80 questions: DWV isometrics 10, water supply isometrics 4 and roof drain isometrics 3. Developed length adds 5 more.

Which code editions are allowed?

The 2021 or 2024 IPC and IFGC with South Carolina modifications until July 1, 2027, then the 2024 editions.

Free questions with answers

Show all 10 free questions and answers
  1. A sewer trench is being backfilled over a new PVC building drain. Loose, rock-free earth is placed and tamped. What are the maximum layer depth and the minimum tamped cover over the crown of the pipe?

    Answer: 6-inch layers, until the crown is covered by 12 inches of tamped earth

    Section 306.3 requires loose earth free of rocks, broken concrete and frozen chunks, placed in 6-inch layers and tamped until the crown of the pipe has 12 inches of tamped earth over it. Backfill must also come up evenly on both sides so the pipe stays aligned.

    Reference: South Carolina Plumbing Code (2021 IPC); same text in 2024 IPC unless noted, 306.3

  2. A multistory drainage system is water tested in sections rather than all at once. What is the minimum head of water applied to each section?

    Answer: 10 feet

    Section 312.2: when the drainage system is tested in sections, each section is filled with water and may not be tested with less than a 10-foot head. The pressure is held at least 15 minutes, and the system must be tight at all points.

    Reference: South Carolina Plumbing Code (2021 IPC); same text in 2024 IPC unless noted, 312.2

  3. A hub-and-spigot cast-iron joint is being made with oakum and molten lead. What are the lead requirements?

    Answer: Poured in one operation, at least 1 inch deep, not more than 1/8 inch below the hub rim

    Section 705.3.1: pack the joint firmly with oakum or hemp, pour the lead in one operation to a depth of at least 1 inch, and caulk it tight; the lead may not recede more than 1/8 inch below the hub rim. Paint or coatings are not allowed on the joint until after it has been tested and approved.

    Reference: South Carolina Plumbing Code (2021 IPC); same text in 2024 IPC unless noted, 705.3.1

  4. What are the maximum temperature and pressure settings permitted on a temperature and pressure relief valve for a storage water heater?

    Answer: 210 F, and the lesser of tank rated working pressure or 150 psi

    Section 504.5: relief valves must bear an approved agency label with a temperature setting of not more than 210 F and a pressure setting not exceeding the tank manufacturer's rated working pressure or 150 psi, whichever is less. Capacity must equal or exceed the heater's heat input.

    Reference: South Carolina Plumbing Code (2021 IPC); same text in 2024 IPC unless noted, 504.5

  5. What is the minimum thickness of a plastic water closet floor flange?

    Answer: 0.25 inch

    Section 405.4.1 requires floor flanges to be at least 0.125 inch for copper alloy, 0.25 inch for plastic, and 0.25 inch with at least 2 inches of caulking depth for cast iron or galvanized malleable iron. 0.0575 inch is the shield plate gauge.

    Reference: South Carolina Plumbing Code (2021 IPC); same text in 2024 IPC unless noted, 405.4.1

  6. What is the minimum slope for a 3-inch horizontal drainage pipe?

    Answer: 1/8 inch per foot

    Table 704.1 requires 1/4 inch per foot for pipe 2-1/2 inches and smaller, 1/8 inch per foot for 3 to 6 inches, and 1/16 inch per foot for 8 inches and larger.

    Reference: South Carolina Plumbing Code (2021 IPC); same text in 2024 IPC unless noted, Table 704.1

  7. A dry vent connects to a horizontal 4-inch fixture drain. Where on the pipe must the vent connect?

    Answer: Above the centerline of the drain pipe

    Section 905.3 requires every dry vent connecting to a horizontal drain to connect above the centerline of the horizontal drain pipe, so waste cannot flow into the vent.

    Reference: South Carolina Plumbing Code (2021 IPC); same text in 2024 IPC unless noted, 905.3

  8. A vent rises 12 feet, then goes through a 45-degree offset that travels 5 feet horizontally and 5 feet vertically (diagonal run), then rises another 20 feet to the roof. Does the vent exceed the 40-foot developed length at which Section 906.2 requires a larger vent?

    Answer: No, the developed length is about 39.1 feet

    Developed length follows the pipe centerline, so the 45-degree diagonal counts as its true length, not its horizontal and vertical components. Diagonal = 5 x 1.414 = 7.07 ft. Total = 12 + 7.07 + 20 = 39.07 ft, which does not exceed 40 ft, so no size increase is needed. Adding 5 + 5 as separate legs gives 42 ft, a common mistake.

    Reference: South Carolina Plumbing Code (2021 IPC); same text in 2024 IPC unless noted, Chapter 2, Developed Length; Section 906.2

  9. An isometric of a restroom shows a horizontal fixture branch serving 3 public water closets (1.6 gpf), 2 lavatories and 1 floor drain. Using Tables 709.1 and 710.1(2), what is the minimum size of the horizontal fixture branch?

    Answer: 3 inches

    Table 709.1: 3 public 1.6 gpf water closets x 4 = 12; 2 lavatories x 1 = 2; 1 floor drain x 2 = 2; total 16 dfu. Table 710.1(2) allows 12 dfu on a 2-1/2 inch horizontal branch (too small) and 20 dfu on a 3-inch branch, so 3 inches is the minimum.

    Reference: South Carolina Plumbing Code (2021 IPC); same text in 2024 IPC unless noted, Tables 709.1, 710.1(2)

  10. Static main pressure at the meter is 72 psi. The lowest fixture is 25 feet below the meter. Using 0.433 psi per foot, is a pressure-reducing valve required under Section 604.8?

    Answer: Yes, since static pressure is about 82.8 psi, above 80 psi

    Water gains 0.433 psi per foot of fall (62.4 lb/cu ft divided by 144 sq in). Static pressure at the lowest fixture = 72 + (25 x 0.433) = 72 + 10.8 = 82.8 psi. Section 604.8 requires an approved pressure-reducing valve (ASSE 1003 or CSA B356) with strainer where building static pressure exceeds 80 psi, reducing it to no more than 80 psi.

    Reference: South Carolina Plumbing Code (2021 IPC); same text in 2024 IPC unless noted, 604.8

Sources

Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.