Rhode Island licensing exam

Rhode Island Master Plumber Exam: Practice Test & Licensing Guide

The Department of Labor and Training's written exam for a Rhode Island master plumber. The DLT application lists 50 multiple-choice questions based on the 2018 IPC (Rhode Island adopted the 2021 IPC effective December 1, 2025; confirm with the DLT). Pass is 70. This practice bank covers the plumbing code, design and sizing, and Rhode Island plumbing law and business rules.

Questions
50
Time limit
Not published by Rhode Island
Passing score
70%
Books
Not published by Rhode Island
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Drain, Waste and Vent Systems

A 4-inch horizontal waste line carries kitchen drainage upstream of a grease interceptor. What minimum slope applies to that piping?

Requirements at a glance

AgencyRhode Island Department of Labor and Training (Division of Professional Regulation); the DLT gives the exam itself
Exam50 multiple-choice questions based on the 2018 IPC (per the DLT application); 70 to pass; time and open/closed book not published
Experience5 years of experience plus a journeyperson plumber license held for 1 year (DLT application)
BooksOpen or closed book is not published; ask the DLT (401-462-8580) what you may bring
Fees$75 non-refundable exam application to the DLT; $240 biennial master license

Journeyman plumbers applying to the State Board of Plumbing Examiners for a master plumber license. The DLT application asks for 5 years of experience and a journeyperson license held for 1 year.

How to get licensed, step by step

  1. Meet the experience requirement

    Gain 5 years of experience and hold a journeyperson plumber license for 1 year, per the DLT application.

    Rhode Island DLT: Professional Regulation (opens in a new tab)RIGL chapter 5-20 (plumbers and irrigators) (opens in a new tab)

  2. Apply to the DLT

    File the exam application with the Division of Professional Regulation (Cranston) with the $75 non-refundable fee (RIGL 5-20-17). Use the DLT's current form.

    Rhode Island DLT: trade license applications and study materials (opens in a new tab)

  3. Wait for your exam notice

    The DLT approves applicants, then mails the date and place of the next sitting. Applications must reach the Division 15 working days before the exam date. Phone 401-462-8580 or 401-462-8526 to confirm the format, what you may bring and the next date.

    Rhode Island DLT: Professional Regulation (opens in a new tab)

  4. Get licensed

    The DLT application says a score of 70 or better passes. It lists a biennial license fee of $72 for a journeyperson and $240 for a master.

    Rhode Island DLT: Professional Regulation (opens in a new tab)RIGL chapter 5-20 (plumbers and irrigators) (opens in a new tab)

How to prepare

  • Expect pipe sizing, design, testing and Rhode Island law as well as the code basics; the DLT publishes no weights.
  • The DLT application says the exam is based on the 2018 IPC, but Rhode Island adopted the 2021 IPC with amendments (including 305.4.1 sewer depth, 603.2 separation and 803.3) effective 12/01/2025. Confirm the edition with the DLT (401-462-8580) before you buy books.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • International Plumbing Code 2021 with the Rhode Island amendments (RISBC-3, 510-RICR-00-00-3)
  • Rhode Island General Laws chapter 5-20 (plumbers and irrigators)
  • 260-RICR-30-15-9: State Board of Plumbing Examiners rules

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Drain, Waste and Vent Systems10
Water Supply and Distribution8
Fixtures, Traps and Backflow Protection8
Materials, Joints and Connections5
Venting, Sizing and Testing8
Water Heaters and Gas Piping Basics4
Rhode Island Law and Rules7

Exam day details

  • Administered by Rhode Island Department of Labor and Training (Division of Professional Regulation).
  • Fee: $75 application fee to the DLT (RIGL 5-6-17, 5-20-17), non-refundable, by check or money order. Two-year license fees are separate: $240 for a master or contractor, $72 for a journeyperson.
  • The State Board of Plumbing Examiners prepares the questions (RIGL 5-20-13). The DLT application says the exam has 50 multiple-choice questions based on the 2018 IPC; Rhode Island adopted the 2021 IPC effective 12/01/2025, so confirm the edition with the DLT (401-462-8580). The time limit and whether the exam is open or closed book are not published.
  • A score of 70 or better passes, per the DLT application.
  • The Department of Labor and Training writes and gives this exam on paper at scheduled sittings and mails each approved applicant the date and place. It doesn't publish the number of questions, the time limit or the topic weights.
  • Applications must reach the Division 15 working days before the exam date.
  • A new exam fee applies each time you retake.

Note: The DLT writes and gives this exam itself and publishes no time limit, topic weights or open-book rule, and for electricians no question count. Our timer and topic split (and the electrician length) are practice estimates built from the statutes and the adopted codes. Confirm the format with the DLT (401-462-8580) when you are approved. The DLT plumbers application (dated July 2025) says the exam is based on the 2018 IPC, but Rhode Island adopted the 2021 IPC (RISBC-3) with state amendments effective 12/01/2025. We could not confirm which edition the exam uses today, so confirm with the DLT (401-462-8580) before you buy books.

Frequently asked questions

What's on the Rhode Island master plumber exam?

The DLT lists 50 multiple-choice questions but no topic list or time limit. Expect the plumbing code (drainage, venting, water supply, fixtures, testing) plus Rhode Island law; our split is an estimate.

What does the master license cost?

The DLT application lists $240 for a master plumber license (biennial), plus the $75 non-refundable exam application.

What experience do I need?

The DLT application asks for 5 years of experience and a journeyperson plumber license held for 1 year.

Free questions with answers

Show all 10 free questions and answers
  1. A 4-inch horizontal waste line carries kitchen drainage upstream of a grease interceptor. What minimum slope applies to that piping?

    Answer: 1/4 inch per foot

    Section 704.1 sets a special minimum of 1/4 inch per foot (2 percent) for drainage piping upstream of a grease interceptor, even where Table 704.1 would allow 1/8 inch per foot for a 4-inch pipe. The steeper slope keeps grease and solids moving instead of settling in the line.

    Reference: 2021 International Plumbing Code, Section 704.1

  2. An apartment building has 24 identical units. Each unit has one bathroom group with a 1.6 gpf water closet, one kitchen sink and one residential clothes washer. The building drain will be laid at 1/8 inch per foot. Using Tables 709.1 and 710.1(1), what is the minimum building drain size?

    Answer: 5 inches

    Per unit: bathroom group 5 dfu + kitchen sink 2 dfu + residential clothes washer 2 dfu = 9 dfu (Table 709.1). For 24 units, 24 x 9 = 216 dfu. At 1/8 inch per foot a 4-inch drain carries only 180 dfu, so it is too small; a 5-inch drain carries 390 dfu and is the smallest that works. A 4-inch drain would pass only if laid at 1/4 inch per foot (216 dfu).

    Reference: 2021 International Plumbing Code, Tables 709.1 and 710.1(1)

  3. What is the minimum diameter of a water service pipe, regardless of the calculated demand?

    Answer: 3/4 inch

    Section 603.1 requires the water service pipe to be sized for the required quantities and pressures but never smaller than 3/4 inch. The 1/2-inch size is a common fixture branch size, not a service size.

    Reference: 2021 International Plumbing Code, Section 603.1

  4. Under RISBC-3 (Rhode Island's amendments to the 2021 IPC, in effect since December 1, 2025), how far apart must a water service pipe and a building drain or sewer be separated by undisturbed or compacted earth, where no exception applies?

    Answer: 10 feet

    RISBC-3 replaces IPC 603.2 and requires 10 feet of undisturbed or compacted earth between a water service pipe and a building drain or sewer. Edition note: this is a Rhode Island amendment to the 2021 IPC; the unamended IPC 603.2 (2018 and 2021) uses 5 feet, and only where the sewer is not built of Table 702.2 materials, which is why 5 feet is the tempting wrong answer.

    Reference: 2021 IPC as amended by Rhode Island (RISBC-3, 510-RICR-00-00-3), RISBC-3 s. 603.2

  5. A potable water outlet has an effective opening of 1-1/2 inches and sits close to a wall. What minimum air gap is required above the flood level rim?

    Answer: 4-1/2 inches

    For effective openings greater than 1 inch, Table 608.16.1 requires two times the opening diameter when away from a wall and three times when close to a wall. Close to a wall: 3 x 1.5 inches = 4.5 inches. Using the away-from-wall multiplier gives 3 inches, which is too small.

    Reference: 2021 International Plumbing Code, Table 608.16.1

  6. What maximum lead content defines lead-free solder and flux for joining water supply piping?

    Answer: 0.2 percent

    Sections 605.12.3 and 605.13.6 require water supply piping to be joined with lead-free solder and flux, defined as a chemical composition equal to or less than 0.2 percent lead. The 0.25 percent value is the weighted average for wetted surfaces of drinking water components, not for solder.

    Reference: 2021 International Plumbing Code, Section 605.13.6

  7. Where must the temperature-sensing element of a temperature relief valve be located on a storage water heater?

    Answer: In the shell, in the top 6 inches of the tank

    Section 504.4.1 requires relief valves to be installed in the shell of the tank, with temperature relief valves located to be actuated by water in the top 6 inches of the tank served.

    Reference: 2021 International Plumbing Code, Section 504.4.1

  8. Under RISBC-3 (Rhode Island's amendments to the 2021 IPC, in effect since December 1, 2025), how far above the roof must an unprotected open vent pipe terminate?

    Answer: At least 12 inches

    RISBC-3 replaces IPC 903.1.1 and requires open vent pipes that extend through a roof to terminate not less than 12 inches above the roof. Roofs used for promenades, decks and similar purposes still require 7 feet under 903.1.2. Edition note: this is a Rhode Island amendment to the 2021 IPC; the unamended IPC leaves the height blank for the adopting jurisdiction (2018 Section 903.1, 2021 Section 903.1.1).

    Reference: 2021 IPC as amended by Rhode Island (RISBC-3, 510-RICR-00-00-3), RISBC-3 s. 903.1.1

  9. A plumbing vent extension will pass through the roof of a house in Newport County, Rhode Island. Under RISBC-3 (Rhode Island's amendments to the 2021 IPC, in effect since December 1, 2025), what is the minimum size of the vent extension under the frost closure section?

    Answer: 2 inches

    RISBC-3 replaces IPC 903.2 and requires roof vent extensions to be at least 3 inches in Providence County and 2 inches in all other counties. Newport County is not Providence County, so the 2-inch minimum applies. The 3-inch figure is for Providence County only. Edition note: this is a Rhode Island amendment to the 2021 IPC; the unamended IPC 903.2 (2018 and 2021) instead keys a 3-inch minimum to a 97.5-percent outdoor design temperature of 0 degrees F or less.

    Reference: 2021 IPC as amended by Rhode Island (RISBC-3, 510-RICR-00-00-3), RISBC-3 s. 903.2

  10. A master plumber's license expired and was not renewed. How long after expiration can the license still be reinstated without a new examination?

    Answer: Two years

    R.I. Gen. Laws 5-20-23(b) allows reinstatement for two years after the renewal date on payment of the current biennial fee ($240 for a master), outstanding fees and a $12 per month administrative assessment. Under 5-20-23(e), a license not renewed within two years is forfeited and the person must apply for an examination before a new license is issued.

    Reference: R.I. Gen. Laws Chapter 5-20, R.I. Gen. Laws 5-20-23(b) and (e)

Sources

Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.