Requirements at a glance
| Agency | Rhode Island Department of Labor and Training (Division of Professional Regulation); the DLT gives the exam itself |
|---|---|
| Exam | 50 multiple-choice questions based on the 2018 IPC (per the DLT application); 70 to pass; time and open/closed book not published |
| Experience | 5 years of experience plus 576 hours of related instruction (DLT application) |
| Books | Open or closed book is not published; ask the DLT (401-462-8580) what you may bring |
| Fees | $75 non-refundable exam application to the DLT; $72 biennial journeyperson license |
Plumbers applying to the State Board of Plumbing Examiners for a journeyman license with 5 years of experience and 576 hours of related instruction, per the DLT application.
Official links
How to get licensed, step by step
Meet the experience requirement
Gain 5 years of experience and 576 hours of related instruction, per the DLT application.
Rhode Island DLT: Professional Regulation (opens in a new tab)RIGL chapter 5-20 (plumbers and irrigators) (opens in a new tab)
Apply to the DLT
File the exam application with the Division of Professional Regulation (Cranston) with the $75 non-refundable fee (RIGL 5-20-17). Use the DLT's current form.
Rhode Island DLT: trade license applications and study materials (opens in a new tab)
Wait for your exam notice
The DLT approves applicants, then mails the date and place of the next sitting. Applications must reach the Division 15 working days before the exam date. Phone 401-462-8580 or 401-462-8526 to confirm the format, what you may bring and the next date.
Rhode Island DLT: Professional Regulation (opens in a new tab)
Get licensed
The DLT application says a score of 70 or better passes. It lists a biennial license fee of $72 for a journeyperson and $240 for a master.
Rhode Island DLT: Professional Regulation (opens in a new tab)RIGL chapter 5-20 (plumbers and irrigators) (opens in a new tab)
How to prepare
- The DLT publishes no topic weights, so study drainage, venting, water supply, fixtures, traps and backflow protection and testing.
- The DLT application says the exam is based on the 2018 IPC, but Rhode Island adopted the 2021 IPC with amendments (including 305.4.1 sewer depth, 603.2 separation and 803.3) effective 12/01/2025. Confirm the edition with the DLT (401-462-8580) before you buy books.
- Exam retakes need a new exam fee.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
2021 International Plumbing Code (IPC), ICC, with Rhode Island amendments (RISBC-3)Essential
The state-adopted edition from 12/01/2025. Confirm with the DLT which edition your exam uses.
ICC (opens in a new tab)Read free (ICC codes) (opens in a new tab)
Official reference list (as published by the testing agency)
- International Plumbing Code 2021 with the Rhode Island amendments (RISBC-3, 510-RICR-00-00-3)
- Rhode Island General Laws chapter 5-20 (plumbers and irrigators)
- 260-RICR-30-15-9: State Board of Plumbing Examiners rules
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Drain, Waste and Vent Systems | 12 | |
| Water Supply and Distribution | 10 | |
| Fixtures, Traps and Backflow Protection | 9 | |
| Materials, Joints and Connections | 6 | |
| Venting, Sizing and Testing | 7 | |
| Water Heaters and Gas Piping Basics | 3 | |
| Rhode Island Law and Rules | 3 |
Exam day details
- Administered by Rhode Island Department of Labor and Training (Division of Professional Regulation).
- Fee: $75 application fee to the DLT (RIGL 5-6-17, 5-20-17), non-refundable, by check or money order. Two-year license fees are separate: $240 for a master or contractor, $72 for a journeyperson.
- The State Board of Plumbing Examiners prepares the questions (RIGL 5-20-13). The DLT application says the exam has 50 multiple-choice questions based on the 2018 IPC; Rhode Island adopted the 2021 IPC effective 12/01/2025, so confirm the edition with the DLT (401-462-8580). The time limit and whether the exam is open or closed book are not published.
- A score of 70 or better passes, per the DLT application.
- The Department of Labor and Training writes and gives this exam on paper at scheduled sittings and mails each approved applicant the date and place. It doesn't publish the number of questions, the time limit or the topic weights.
- Applications must reach the Division 15 working days before the exam date.
- A new exam fee applies each time you retake.
Note: The DLT writes and gives this exam itself and publishes no time limit, topic weights or open-book rule, and for electricians no question count. Our timer and topic split (and the electrician length) are practice estimates built from the statutes and the adopted codes. Confirm the format with the DLT (401-462-8580) when you are approved. The DLT plumbers application (dated July 2025) says the exam is based on the 2018 IPC, but Rhode Island adopted the 2021 IPC (RISBC-3) with state amendments effective 12/01/2025. We could not confirm which edition the exam uses today, so confirm with the DLT (401-462-8580) before you buy books.
Frequently asked questions
How many questions are on the Rhode Island plumber exam?
The DLT application says 50 multiple-choice questions, with a pass score of 70. The time limit and whether the exam is open book are not published; our 120-minute timer is a practice estimate.
Which plumbing code applies?
The DLT application says the exam is based on the 2018 IPC, while Rhode Island adopted the 2021 IPC with amendments (RISBC-3) effective December 1, 2025. Which edition the exam draws on today is unconfirmed, so call the DLT at 401-462-8580 before you buy books.
What do the licenses cost?
The exam application is $75 (non-refundable). The DLT application lists a $72 biennial journeyperson license and $240 for a master.
Free questions with answers
Show all 10 free questions and answers
Using Table 710.1(1), what is the maximum number of drainage fixture units that may connect to any portion of a 4-inch building drain laid at 1/8 inch per foot?
Answer: 180
In Table 710.1(1) the 4-in. row shows 180 dfu at 1/8 in. per foot, 216 at 1/4 in. and 250 at 1/2 in. The 160 figure is the 4-in. horizontal fixture branch limit in Table 710.1(2), a different table, so it does not apply to a building drain.
Reference: 2021 International Plumbing Code, Table 710.1(1)
A building drain at 1/8 inch per foot serves six bathroom groups (1.6 gpf water closets), six domestic kitchen sinks and six residential clothes washers. Using Tables 709.1 and 710.1(1), what is the smallest standard building drain size that can serve this load?
Answer: 4 inches
Loads from Table 709.1: bathroom group 5 dfu x 6 = 30; kitchen sink 2 x 6 = 12; residential washer 2 x 6 = 12. Total 54 dfu. At 1/8 in. per foot, Table 710.1(1) allows 36 dfu on 3 in. and 180 dfu on 4 in., so 4 in. is the smallest that works. A 3-in. drain is overloaded, and 2-1/2 in. is also too small (and a building drain serving a water closet may not be under 3 in.). 5 in. works but is not the smallest.
Reference: 2021 International Plumbing Code, Tables 709.1 and 710.1(1)
What is the smallest nominal diameter permitted for a water service pipe, regardless of calculated demand?
Answer: 3/4 inch
Section 603.1 says the water service pipe must be sized for the required quantities and pressures, and must be not less than 3/4 in. in diameter. 1/2 in. is a common fixture supply size, not a service size.
Reference: 2021 International Plumbing Code, 603.1
A fixture supply pipe is being stubbed out for a lavatory. Within what maximum distance from the point of connection to the fixture must the supply pipe terminate?
Answer: 30 inches
Section 604.5 requires the fixture supply pipe to terminate not more than 30 in. from the point of connection to the fixture and to extend to the floor or wall adjacent to the fixture.
Reference: 2021 International Plumbing Code, 604.5
What is the minimum distance from the centerline of a water closet to a side wall or vanity?
Answer: 15 inches
Section 405.3.1 sets 15 in. minimum from the fixture center to any side wall, partition, vanity or obstruction. Fixtures without a partition between them need 30 in. center to center, and 21 in. is the clearance required in front of the fixture.
Reference: 2021 International Plumbing Code, 405.3.1
A new prefabricated shower compartment is selected for a bathroom. Under Section 421.4, what is the minimum interior cross-sectional area and least dimension (without using the exception)?
Answer: 900 square inches and 30 inches
Section 421.4 requires at least 900 sq in. of interior cross-sectional area and a least dimension of at least 30 in., measured at the top of the threshold and continuing to 70 in. above the drain outlet. The exception allows 25 in. only when the area is at least 1,300 sq in.
Reference: 2021 International Plumbing Code, 421.4
What does the code mean by lead-free solder and flux for joining water supply piping?
Answer: A chemical composition of not more than 0.2 percent lead
Section 605.12.3 requires lead-free solder and flux for water supply joints and defines lead free as 0.2 percent lead or less. The 8 percent figure in 605.2 is the cap for pipe, fittings, valves and faucets in the water supply, and 0.25 percent weighted average applies to fittings that supply drinking or cooking water (605.2.1).
Reference: 2021 International Plumbing Code, 605.12.3
A 2-inch fixture drain sloped 1/4 inch per foot runs 10 feet from the trap weir to the vent connection. What does Table 909.1 say about this arrangement?
Answer: It exceeds the 8 foot maximum, so the vent must be moved closer or the drain enlarged
Table 909.1 limits a 2 in. trap at 1/4 in. per foot to 8 ft from the vent. 12 ft is the 3 in. trap figure, and the table applies to every trap size listed, not just larger ones. At 10 ft the drain is too long, so relocate the vent or increase the fixture drain size so a larger row applies.
Reference: 2021 International Plumbing Code, Table 909.1
What must be provided on the cold water branch line to each water heater?
Answer: A valve near the equipment, serving only that water heater
Section 503.1 requires a valve near the equipment on the cold water branch line, serving only that water heater or tank, accessible on the same floor level, without disrupting the rest of the cold water system. Section 606.1 also lists a full-open valve on the water heater supply.
Reference: 2021 International Plumbing Code, 503.1
How many hours of related instruction at a recognized training program must a journeyperson plumber applicant complete?
Answer: 576 hours
R.I. Gen. Laws 5-20-17 requires 576 hours of related instruction as part of the 8,000 on-the-job hours; up to 144 hours of classroom credit may come from an approved vocational school.
Reference: Rhode Island General Laws chapter 5-20, 5-20-17
Sources
- Rhode Island Department of Labor and Training: Professional Regulation (opens in a new tab)
- Rhode Island DLT: trade license applications and study materials (opens in a new tab)
- Rhode Island General Laws chapter 5-20 (plumbers and irrigators) (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.