Oklahoma licensing exam

Oklahoma Unlimited Journeyman Electrician Exam: Practice Test & Licensing Guide

The PSI exam for an Oklahoma unlimited journeyman electrician license: 100 scored questions on the 2023 NEC with Oklahoma amendments. Open book, 70% to pass.

Questions
100
Time limit
4 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Electrical Knowledge

A 36-kW, 208-volt, three-phase resistive heating load is installed. What is the line current?

Requirements at a glance

AgencyOklahoma Construction Industries Board (CIB); exams by PSI
Experience8,000 hours of electrical experience (4,000 commercial or industrial; up to 2,000 hours may come from school)
Exam100 scored questions, 4 hours, 70%
Books allowed2023 NEC as adopted in Oklahoma (bound; no handbooks or spiral-bound copies), 29 CFR 1926, Ugly's (any edition)
Fee$92 to PSI per exam portion (non-refundable), plus CIB application and license fees
Retest30 days after each fail

Electricians applying to the Oklahoma Construction Industries Board for an unlimited journeyman license after 8,000 hours of documented experience. The Unlimited Electrical Contractor exam uses the same blueprint plus Electrical Business and Law.

How to get licensed, step by step

  1. Register and log your hours

    Register with the CIB as an apprentice and log your hours under a licensed contractor (1 year is 2,000 hours). Have your employer's affidavits notarized.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

  2. Apply to the CIB

    Send the CIB your application and notarized experience affidavits. When it approves you, you receive an Ok Con ID.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

  3. Schedule with PSI

    Book your exam with PSI online or at (855) 834-8750. Contractor applicants also take the Business and Law portion.

    Schedule with PSI (Oklahoma contractor exams) (opens in a new tab)PSI: Oklahoma CIB Candidate Information Bulletin (effective 9/11/2026) (opens in a new tab)

  4. Pass and get licensed

    After you pass, send the CIB your results and license fee to receive your license.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

How to prepare

  • All Oklahoma trade exams are open book, so the skill is finding answers fast: bound books, permanent tabs only, highlighting allowed, no writing.
  • Bring a silent, non-programmable calculator. The exam adds up to 10 unscored experimental questions that count against your time.
  • Services, feeders and branch circuits, grounding and bonding, special occupancies and lighting and signs are 10 questions each: tab Articles 210, 215, 220, 230, 250, 410, 600 and Chapter 5.
  • Know the Oklahoma amendments: 210.8(F) outdoor-outlet GFCI and 422.16(B)(5) cord-and-plug gas furnaces.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • NFPA 70 National Electrical Code, 2023 edition, as revised and adopted by the Oklahoma Uniform Building Code Commission (bound copy; NEC handbooks and spiral-bound copies are not allowed)
  • 29 CFR Part 1926 (OSHA construction), or PSI's selections
  • Ugly's Electrical References, George V. Hart (any edition)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
General Knowledge4
General Electrical Knowledge10
Electrical Installation Requirements10
Services, Feeders, and Branch Circuits10
Overcurrent Protection9
Grounding and Bonding10
Conductors and Cables8
Raceways and Boxes7
Special Occupancies and Equipment (Including Swimming Pools)10
Low Voltage, Alarms, Signaling Systems, and Communications2
Lighting and Signs10
Safety4
Motors and Transformers6

Exam day details

  • Administered by PSI Services for the Oklahoma Construction Industries Board (CIB).
  • Fee: $92 to PSI per exam portion, non-refundable. CIB application and license fees are separate.
  • 100 scored questions in 4 hours (240 minutes); 70 correct to pass.
  • Oklahoma adopted the 2023 NEC with small amendments (OAC 748:20-10), including 210.8(F) outdoor-outlet GFCI and 422.16(B)(5) cord-and-plug gas furnaces. Our questions follow the amended text.
  • If you fail, wait 30 days to retest.
  • Open book: bring your own bound copies of the allowed references. You may highlight, underline and index them beforehand with permanent tabs only; no writing and no sticky notes.
  • PSI may add up to 10 unscored experimental questions, which count against your time. A silent, non-printing, non-programmable calculator is allowed.
  • The CIB must approve your application first (you receive an Ok Con ID) before you can schedule with PSI.

Frequently asked questions

What's on the Oklahoma unlimited journeyman electrician exam?

100 scored questions: general electrical knowledge, installation requirements, services/feeders/branch circuits, grounding and bonding, lighting and signs and special occupancies at 10 each, overcurrent protection 9, conductors and cables 8, raceways and boxes 7, motors and transformers 6, general knowledge and safety 4 each, and low voltage 2.

Which NEC does the Oklahoma electrician exam use?

The 2023 NEC as revised and adopted by the Oklahoma Uniform Building Code Commission. NEC handbooks and spiral-bound copies are not allowed in the test center.

Can I bring Ugly's and 29 CFR 1926?

Yes. Ugly's Electrical References (any edition) and 29 CFR Part 1926 are on the allowed list. Use permanent tabs only.

Free questions with answers

Show all 10 free questions and answers
  1. A 36-kW, 208-volt, three-phase resistive heating load is installed. What is the line current?

    Answer: 99.9 A

    I = P / (E x 1.732) = 36,000 / (208 x 1.732) = 36,000 / 360.3 = 99.9 A. Dividing by voltage alone gives 173.1 A (single-phase formula). Dividing by 3 instead of 1.732 gives 57.7 A, and 124.9 A applies a 125% continuous-load factor that is not part of finding the line current.

    Reference: Electrical theory: three-phase power, Three-phase current: I = P / (E x 1.732)

  2. What is the minimum height of the working space in front of electrical equipment rated 1000 volts or less, other than the limited exceptions for dwelling-unit service equipment and panelboards?

    Answer: The height of the equipment, but not less than 6-1/2 ft

    Section 110.26(A)(3) requires the working space to be clear from the grade, floor or platform up to the height of the equipment or 6-1/2 ft, whichever is greater. Equipment taller than 6-1/2 ft therefore needs more clear height. A fixed 6 ft or 7 ft figure does not appear in the rule.

    Reference: NFPA 70, National Electrical Code, 2023, 110.26(A)(3)

  3. An overhead 120/240-volt service drop crosses a commercial driveway used by delivery trucks. What is the minimum clearance above the driveway under 230.24(B)?

    Answer: 18 ft

    Section 230.24(B)(4) requires 18 ft over public streets, alleys, roads, parking areas subject to truck traffic, and driveways on other than residential property. The 12 ft value (B)(2) is for residential property and driveways and for commercial areas not subject to truck traffic, and 10 ft (B)(1) applies at pedestrian-only areas such as at the building. Truck traffic makes 18 ft the rule here.

    Reference: NFPA 70, National Electrical Code, 2023, 230.24(B)(4)

  4. A feeder uses 4/0 AWG copper THWN (230 A at 75 C) and serves a 210 A load. It does not supply multiple receptacles for cord-and-plug loads. What is the largest standard overcurrent device allowed by the 'next size up' rule?

    Answer: 250 A

    Section 240.4(B) permits the next higher standard overcurrent device rating when the conductor ampacity does not match a standard size, for devices up to 800 A and where the conductors do not supply multiple receptacles. Standard sizes from 240.6(A) are 225, 250 and 300 A; the next standard size above 230 A is 250 A. 225 A is allowed but is not the largest, and 230 A is not a standard rating.

    Reference: NFPA 70, National Electrical Code, 2023, 240.4(B) and 240.6(A)

  5. A single 8-ft ground rod used as the only grounding electrode measures 32 ohms to earth. What does the NEC require?

    Answer: A supplemental electrode, with the two rods installed at least 6 ft apart

    Section 250.53(A)(2) requires a single rod, pipe or plate electrode that does not have a resistance to ground of 25 ohms or less to be augmented by an additional electrode, and 250.53(A)(3) requires the electrodes to be at least 6 ft apart. The 25-ohm test is the trigger. No resistance target below that is needed once the second electrode is installed.

    Reference: NFPA 70, National Electrical Code, 2023, 250.53(A)(2) and (A)(3)

  6. A feeder carries 100 A of continuous load only. It will use aluminum THWN conductors terminated on equipment rated for 75 C, and the overcurrent device is not rated for continuous operation at 100%. Using the 75 C aluminum column of Table 310.16, what is the smallest aluminum conductor?

    Answer: 2/0 AWG

    Conductor ampacity must be at least 125% of the continuous load (215.2(A)(1)): 100 x 1.25 = 125 A. In the 75 C aluminum column, 1/0 AWG is 120 A (too small) and 2/0 AWG is 135 A, so 2/0 aluminum is the smallest. 1 AWG (100 A) ignores the 125% rule, and 3/0 AWG (155 A) is larger than necessary.

    Reference: NFPA 70, National Electrical Code, 2023, 215.2(A)(1) and Table 310.16

  7. A run of 1-1/2 in. rigid PVC conduit is installed on a wall. Using Table 352.30, what is the maximum spacing between supports?

    Answer: 5 ft

    Table 352.30 allows 3 ft for 1/2 to 1 in. trade sizes, 5 ft for 1-1/4 to 2 in., and 6 ft for 2-1/2 to 3 in. A 1-1/2 in. conduit falls in the 5 ft group. Support must also be within 3 ft of each box or termination (352.30(A)).

    Reference: NFPA 70, National Electrical Code, 2023, Table 352.30

  8. A permanently installed swimming pool is built at a one-family dwelling. The required 125-volt, 15- or 20-ampere general-purpose receptacle must be at least 6 ft from the inside wall of the pool and no more than what distance from it?

    Answer: 20 ft

    Section 680.22(A) requires at least one 125-volt, 15- or 20-ampere receptacle on a general-purpose branch circuit, located at least 6 ft and no more than 20 ft from the inside walls of the pool, and it must be GFCI protected. Receptacles closer than 6 ft to the water are not permitted for this purpose.

    Reference: NFPA 70, National Electrical Code, 2023, 680.22(A)

  9. Lighting systems covered by Article 411 operate at no more than what voltage?

    Answer: 30 volts ac (or 60 volts dc)

    Section 411.1 applies Article 411 to lighting systems operating at 30 volts (42.4 volts peak) or less ac, or 60 volts or less dc, and to their associated power supplies. Such systems must use a listed power supply. Common examples are landscape and cabinet low-voltage lighting.

    Reference: NFPA 70, National Electrical Code, 2023, 411.1

  10. A 40-hp, 460-volt, three-phase squirrel-cage motor is supplied by its own branch circuit. Using Table 430.250 (FLC 52 A), what is the minimum branch-circuit conductor ampacity under 430.22?

    Answer: 65 A

    Section 430.22 requires the conductors to have an ampacity of at least 125% of the motor full-load current from the table: 52 x 1.25 = 65 A. The nameplate current is not used. 52 A omits the 125% factor, and 130 A is the 250% breaker-sizing multiplier.

    Reference: NFPA 70, National Electrical Code, 2023, 430.22 and Table 430.250

Sources

Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.