North Dakota licensing exam

North Dakota Master Plumber Exam: Practice Test & Licensing Guide

The State Plumbing Board master exam on the 2018 North Dakota Plumbing Code (Uniform Plumbing Code): four parts in 5 hours, with a 100-question closed-book multiple-choice part. 80% to pass.

Questions
100
Time limit
5 hours
Passing score
80%
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Chapters 1 and 2: Administration and Definitions

A pipe that carries only liquid waste, free of fecal matter, is classified by the UPC as a

Requirements at a glance

AgencyNorth Dakota State Plumbing Board; state-administered exam
ExperienceAge 21 and 2 years (3,400 hours) as a licensed journeyman, in North Dakota or a state with a licensing law
ExamFour parts in 5 hours (100 closed-book multiple-choice questions plus completion and sizing parts); 80% to pass
Books allowed2018 North Dakota Plumbing Code (you bring it); multiple-choice part closed book, completion parts open book
Fees$50 application, $50 exam, plus the license fee ($100 journeyman, $200 master)

Plumbers age 21 or older with 2 years (3,400 hours) as a licensed journeyman, in North Dakota or another state with a plumbing license law, applying for a master plumber license.

How to get licensed, step by step

  1. Apply to the Board

    Submit the application with the $50 fee and proof of experience. The application expires if you do not test within 6 months of approval.

    North Dakota State Plumbing Board (opens in a new tab)

  2. Schedule your exam

    Exams are given every other month. You need a current North Dakota license or an application on file to be eligible. The exam fee is $50.

    Plumbing Board: exam general information (opens in a new tab)

  3. Pass every part

    Bring the 2018 North Dakota Plumbing Code, a calculator and photo ID. You have 5 hours.

    Plumbing Board: exam general information (opens in a new tab)

  4. If you fail

    Wait 6 months from your last exam before retesting (NDAC 62-02-01-04).

    North Dakota State Plumbing Board (opens in a new tab)

How to prepare

  • North Dakota uses the 2018 Uniform Plumbing Code as the 2018 North Dakota Plumbing Code: chapters 1 to 4, 6 to 11 and 17 and appendices A, B, C, D, E, I and M. Water heaters (Chapter 5) and chapters 12 to 16 are not adopted, so skip them.
  • The exam has a closed-book multiple-choice part plus open-book completion questions and pipe-sizing drawings. Our questions cover the multiple-choice style and sizing arithmetic; practice drawings from your code book.
  • Learn fixture-unit values, trap and vent sizes and drain sizing from the 2018 tables. The Board publishes no topic weights, so our split is an estimate.
  • Masters need 80% (NDAC 62-02-01-03). Practice the full sizing workflow: fixture units, water pipe size, drain size and vent size.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • 2018 North Dakota Plumbing Code: the 2018 Uniform Plumbing Code (IAPMO) chapters 1 to 4, 6 to 11 and 17 and appendices A, B, C, D, E, I and M. Chapter 5 (water heaters) and chapters 12 to 16 are not adopted. The examinee brings the code book.
  • NDAC 62-03.1: North Dakota plumbing code rules (private sewage disposal, NDAC 62-03.1-03)

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Chapters 1 and 2: Administration and Definitions6
Chapter 3: General Regulations10
Chapter 4: Plumbing Fixtures and Fixture Fittings8
Chapter 6: Water Supply and Distribution12
Chapter 7: Sanitary Drainage12
Chapter 8: Indirect Wastes3
Chapter 9: Vents10
Chapter 10: Traps and Interceptors6
Chapter 11: Storm Drainage7
Water Pipe Sizing (Chapter 6 and Appendices A and M)12
Drain, Waste and Vent Sizing with Fixture Units14

Exam day details

  • Administered by the North Dakota State Plumbing Board (state-administered exam).
  • Fee: $50 per exam (NDAC 62-02-01-02). The $50 application fee and the license fee ($100 journeyman, $200 master) are separate.
  • Four parts in 5 hours. Part 1 is closed book with 100 multiple-choice questions. Parts 2 to 4 are open book: 40 completion questions, a water pipe sizing completion and a drain, waste and vent with fixture units completion. 80% to pass (NDAC 62-02-01-03).
  • The exam mixes multiple-choice questions with completion questions and pipe-sizing drawings. This site can only practice the multiple-choice style, so use the sizing questions as a warm-up for the drawings.
  • The multiple-choice part is closed book, so learn the common fixture-unit values and trap and vent sizes. The completion and sizing parts are open book.
  • The application expires if you do not test within 6 months of approval. After a failed exam you must wait 6 months to retest (NDAC 62-02-01-04).
  • Exams are given every other month. Licensees must hold a current ND license or have an application in to be eligible to test.
  • Only the adopted chapters are tested. We do not ask about water heaters (Chapter 5) or fuel gas piping (Chapter 12), which North Dakota did not adopt.

Note: The Plumbing Board prints the exam structure (a 100-question multiple-choice part plus completion and sizing parts) but no topic weights, so our topic split is an estimate. Table values come from the 2018 UPC; confirm sizing tables in your code book.

Frequently asked questions

What's on the North Dakota master plumber exam?

Four parts: 100 closed-book multiple-choice questions, 40 open-book completion questions, an open-book water pipe sizing and an open-book drain, waste and vent with fixture units drawing. The Board publishes no topic weights, so our split is an estimate.

What score do I need?

80% for the master plumber exam and 70% for the journeyman exam (NDAC 62-02-01-03).

Which plumbing code does North Dakota use?

The 2018 North Dakota Plumbing Code: the 2018 Uniform Plumbing Code chapters 1 to 4, 6 to 11 and 17 and appendices A, B, C, D, E, I and M.

Free questions with answers

Show all 10 free questions and answers
  1. A pipe that carries only liquid waste, free of fecal matter, is classified by the UPC as a

    Answer: waste pipe

    Waste Pipe is defined as a pipe conveying only liquid waste free of fecal matter. Soil pipe carries the discharge of water closets, urinals, clinical sinks and similar fixtures, so it is the tempting wrong answer. Vent stacks and branch vents carry air, not drainage.

    Reference: 2018 Uniform Plumbing Code (North Dakota Plumbing Code), Chapter 2, Definitions: Waste Pipe; Soil Pipe

  2. Under Table 313.3, what is the maximum support interval for horizontal 2 inch copper tube?

    Answer: 10 feet

    Table 313.3 lists copper and copper alloy piping at 6 feet for 1-1/2 inch and smaller and 10 feet for 2 inch and larger. Six feet is the tempting wrong answer because it applies to the smaller sizes. Twelve feet is the steel pipe interval for 1 inch and larger.

    Reference: 2018 Uniform Plumbing Code (North Dakota Plumbing Code), Table 313.3

  3. What minimum finished interior must a shower compartment have, regardless of its shape?

    Answer: 1024 square inches, capable of encompassing a 30 inch circle

    Section 408.6 requires a minimum finished interior of 1024 square inches (0.6606 m2) that can also encompass a 30 inch (762 mm) circle, measured at the top of the threshold and maintained to at least 70 inches above the drain outlet. A 32 by 32 inch stall is exactly 1024 square inches.

    Reference: 2018 Uniform Plumbing Code (North Dakota Plumbing Code), Section 408.6

  4. What is the maximum set pressure for a pressure relief valve on a water system, and what may be installed between the valve and the system?

    Answer: 150 psi, and no shutoff valve may be installed between them

    Section 608.4 requires an approved automatic pressure relief valve with a drain, set at not more than 150 psi (1034 kPa), with no shutoff valve between the relief valve and the system.

    Reference: 2018 Uniform Plumbing Code (North Dakota Plumbing Code), Section 608.4

  5. A horizontal drainage line is connecting into another horizontal drainage line. Which fitting is allowed under Section 706.3?

    Answer: A 45 degree wye branch

    Section 706.3 allows horizontal-to-horizontal connections through 45 degree wye branches, combination wye and one-eighth bend branches or other approved fittings of equivalent sweep. Sanitary tees and 60 degree wyes are listed only for horizontal-to-vertical (706.2) or true vertical positions (706.4).

    Reference: 2018 Uniform Plumbing Code (North Dakota Plumbing Code), Section 706.3

  6. How far must a vent pipe terminate above the roof under Section 906.1, and how far from a vertical surface?

    Answer: At least 6 inches above the roof and at least 1 foot from a vertical surface

    Section 906.1 requires each vent pipe or stack to terminate vertically not less than 6 inches (152 mm) above the roof and not less than 1 foot (305 mm) from a vertical surface.

    Reference: 2018 Uniform Plumbing Code (North Dakota Plumbing Code), Section 906.1

  7. What is the required depth of liquid seal for a fixture trap under Section 1005.1, unless the Authority Having Jurisdiction requires deeper?

    Answer: Not less than 2 inches and not more than 4 inches

    Section 1005.1 requires each fixture trap to have a liquid seal of not less than 2 inches (51 mm) and not more than 4 inches (102 mm), except where a deeper seal is found necessary by the Authority Having Jurisdiction. Traps must also be protected from freezing where necessary.

    Reference: 2018 Uniform Plumbing Code (North Dakota Plumbing Code), Section 1005.1

  8. A vertical leader must drain 5,000 square feet of roof at a design rainfall of 2.5 inches per hour, which is not a listed column. Using Table 1103.1 and its Note 2, what is the smallest leader?

    Answer: 4 inch

    Note 2 says to divide the 1 in/h area by the desired rainfall rate. A 3 inch leader holds 8,800 / 2.5 = 3,520 square feet, which is too small. A 4 inch leader holds 18,400 / 2.5 = 7,360 square feet, which exceeds 5,000. The answer is 4 inch.

    Reference: 2018 Uniform Plumbing Code (North Dakota Plumbing Code), Table 1103.1, Note 2

  9. Street pressure at the meter is 55 psi, and the highest fixture is 20 feet above the meter. The longest developed length is 90 feet and the demand is 30 fixture units. Using Section 610.8 and Table 610.4, what are the smallest meter and building supply sizes that work?

    Answer: 1 inch meter and 1-1/4 inch building supply

    Section 610.8 subtracts 1/2 psi per foot of elevation: 55 - (0.5 x 20) = 45 psi, so use the 30 to 45 psi range. The 90 foot length uses the next longer column, 100 feet. In that column, 3/4 x 1-1/4 carries 28 units (too few), 1 x 1 carries 25, and 1 x 1-1/4 carries 38, which exceeds 30. A 1-1/2 inch pair is larger than needed.

    Reference: 2018 Uniform Plumbing Code (North Dakota Plumbing Code), Section 610.8; Table 610.4

  10. A house has two bathroom groups (each a 1.6 GPF water closet, a lavatory and a bathtub/shower), a kitchen sink with a dishwasher, a clothes washer standpipe and one floor drain, all private use. Using Table 702.1, what is the total drainage fixture units (DFU)?

    Answer: 19

    Table 702.1 private values: water closet 3.0, lavatory 1.0, bathtub/shower 2.0, so each bathroom group is 6.0 and two groups are 12.0. Kitchen sink with dishwasher is 2.0 (the sink row covers the dishwasher), clothes washer standpipe 3.0, floor drain 2.0. Total = 12 + 2 + 3 + 2 = 19. Leaving out the floor drain gives 17, using 2.0 for the washer gives 18, and adding the dishwasher separately gives 21.

    Reference: 2018 Uniform Plumbing Code (North Dakota Plumbing Code), Table 702.1

Sources

Questions last verified November 7, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.