Requirements at a glance
| Agency | NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors; exams by PSI |
|---|---|
| Exam | Fuel Piping contractor exam, 2 hours, open book (question count and pass score are not published) |
| Books allowed | 2018 NC Fuel Gas and Administrative Codes and the other books on the Board's fuel piping list |
| Fees | $150 by examination: $75 Board application plus $75 nonrefundable PSI exam fee (valid one year), per 21 NCAC 50 .1101(c); then the annual license fee ($150 for contractors, .1102) |
Contractors who install fuel piping from an approved fuel source to the point of use but do not hold a Class I or II plumbing or heating license (G.S. 87-21), qualifying with the NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors.
Official links
- NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors (opens in a new tab)
- NC Board: exam information, book list and 2018 code notice (opens in a new tab)
- Schedule with PSI (NC plumbing, heating and fire sprinkler) (opens in a new tab)
- NC Office of State Fire Marshal: code book sales (opens in a new tab)
How to get licensed, step by step
Apply to the Board
Contact the Board (1109 Dresser Court, Raleigh; 919-875-3612) and submit the exam application for your license type.
NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors (opens in a new tab)
Wait for PSI's email
Once approved you get an email confirmation from PSI, then register and pay the $75 exam fee (the $75 application fee goes to the Board). After you pass, pay the license fee ($150 a year for contractors) within 45 days.
Schedule with PSI (NC plumbing, heating and fire sprinkler) (opens in a new tab)
Check your book list
Only the books for your exam category are allowed in the room. The Board's list is effective July 1, 2025; confirm it before you buy.
NC Board: exam information, book list and 2018 code notice (opens in a new tab)NC Office of State Fire Marshal: code book sales (opens in a new tab)
Take the exam and Business and Law
Business and Law is a separate Board exam unless you hold an active license and passed it after August 2003.
Schedule with PSI (NC plumbing, heating and fire sprinkler) (opens in a new tab)
How to prepare
- North Carolina's exams use the 2018 NC State Building Code (2015 ICC base text with NC amendments, effective 2019). The 2024 NC codes are delayed to no earlier than May 1, 2027, so use the 2018 books.
- Tab your books with permanent tabs before exam day. Highlighting is allowed; writing, sticky flags and loose papers are not.
- Tab the Fuel Gas Code pipe sizing tables, testing and purging, and appliance connection sections.
- Fuel piping runs from the fuel source to the point of use (G.S. 87-21); know where the Fuel Gas Code stops and the Mechanical Code starts.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 North Carolina State Building Code: Fuel Gas Code
Allowed in the exam room. The 2015 IFGC with NC amendments; gas piping sizing and appliance installation.
2018 North Carolina State Building Code: Administrative Code and Policies
Allowed in the exam room for the general contractor, plumbing and heating exams.
Official reference list (as published by the testing agency)
- North Carolina State Building Code: Fuel Gas Code, 2018 (2015 IFGC with NC amendments)
- North Carolina State Building Code: Administrative Code and Policies, 2018
- Other books on the Board's fuel piping list; confirm it on the Board's site
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Administration and General Regulations | 8 | |
| Gas Piping Installation and Materials | 20 | |
| Pipe Sizing and Gas Capacity Tables | 20 | |
| Inspection, Testing and Purging | 14 | |
| Appliance Connections and Shutoff Valves | 12 | |
| Venting, Combustion Air and Appliance Installation | 14 | |
| Definitions and General Safety | 12 |
Exam day details
- Administered by PSI Services for the NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors.
- Fee: $150 for a license by examination (21 NCAC 50 .1101(c)): $75 Board application fee plus $75 nonrefundable exam fee paid to PSI (valid one year). After you pass, pay the annual license fee ($150 for a contractor license, .1102).
- 2 hours, open book. The Board does not publish the number of questions, the pass score or a topic outline.
- The Board's book list is class-specific (contractor and technician); only the books for your category are allowed in the room.
- Based on the 2018 NC codes until the 2024 codes take effect (no earlier than May 1, 2027).
- Open book: bring your own reference books in original published condition (hard-, spiral- or ring-bound), only the books listed for your exam. Highlighting and permanent commercial tabs (ICC Turbo Tabs are the only loose inserts) are allowed; writing, underlining, notes and homemade tabs are not. Printed PDFs are not allowed.
- PSI provides pencils, scratch paper, calculators and the NC Heating and Plumbing Figures. Heating candidates bring their own duct calculator.
- You must apply to the Board first; PSI emails you after approval. A license by examination costs $150 ($75 application fee plus a $75 nonrefundable exam fee paid to PSI, valid one year); after you pass, the annual license fee ($150 for contractors) is due within 45 days.
- You cannot retest the same day. Unauthorized materials in the exam room mean a 90-day wait before you can reschedule.
- Business and Law is a separate exam, not required if you hold an active license and passed the Board's Business and Law exam after August 2003.
Note: The Board publishes exam durations and reference books for each exam but not the number of questions, a pass score or a topic outline. The question count, pass score and topic weights on this page are our practice estimates. The Board's note dated June 1, 2026 says exams stay on the 2018 NC codes (including NFPA 13 and 13D 2013 and NFPA 25 2011) until the 2024 codes take effect, no earlier than May 1, 2027.
Frequently asked questions
How long is the NC fuel piping exam?
The Board lists 2 hours for the Fuel Piping Contractor and Technician exams. It does not publish the question count or pass score.
What does a fuel piping license allow?
Contracting or installing fuel piping from an approved fuel source at or near the premises to supply fuel to equipment, without a Class I or II plumbing or heating license (G.S. 87-21).
Do I also take Business and Law?
Yes, unless you hold an active Board license and passed the Board's Business and Law exam after August 2003.
Free questions with answers
Show all 10 free questions and answers
Under 21 NCAC 50 .0511, a person wants to install fuel piping from an approved fuel source at the property line to a point inside the premises. Which statement is correct?
Answer: A Plumbing, Heating Group 1, 2 or 3, or Fuel Piping license is required regardless of the system, equipment or appliance served
Rule .0511 says the contracting or installation of fuel piping from an approved fuel source at or near the premises to a point within the premises requires one of the listed licenses regardless of the nature of the system, equipment or appliance served. Fuel means flammable gas, flammable liquefied gas or flammable liquid, so LP-gas is included, and the rule does not exempt residential work.
Reference: 21 NCAC 50, 21 NCAC 50 .0511
According to the Chapter 2 definition of a piping system, where does the piping system end?
Answer: At the outlets of the appliance shutoff valves
A piping system is all fuel piping, valves and fittings from the outlet of the point of delivery to the outlets of the appliance shutoff valves. This matches the coverage described in Section 101.2.2, and connectors and appliance controls lie beyond it.
Reference: 2018 NC Fuel Gas Code (2015 IFGC with NC amendments), IFGC Chapter 2, Definitions: Piping System; Section 101.2.2
Copper and copper alloy tubing may not be used for fuel gas if the gas contains more than an average of how much hydrogen sulfide?
Answer: 0.3 grains per 100 standard cubic feet of gas
Sections 403.4.3 and 403.5.2 bar copper and copper alloy pipe and tubing where the gas contains more than an average of 0.3 grains of hydrogen sulfide per 100 standard cubic feet (0.7 mg per 100 L). The gas supplier can tell you the sulfur content before copper is chosen.
Reference: 2018 NC Fuel Gas Code (2015 IFGC with NC amendments), IFGC 403.5.2 and 403.4.3
Which fitting is NOT among the types Section 404.5 allows for gas piping in a concealed location?
Answer: A gland-type compression fitting that is not listed to ANSI LC-1 or LC-4
Section 404.5 limits fittings in concealed locations to threaded elbows, tees and couplings, brazed fittings, welded fittings, and fittings listed to ANSI LC-1/CSA 6.26 or ANSI LC-4. Gland or compression-type fittings that are not so listed are not on the list.
Reference: 2018 NC Fuel Gas Code (2015 IFGC with NC amendments), IFGC 404.5
When a gas piping system is sized by the longest length method, how is each section's pipe length determined?
Answer: Use the longest length from the point of delivery to the most remote outlet, with the load of the section being sized
Section 402.4.1 says the pipe size of each section is determined using the longest length of piping from the point of delivery to the most remote outlet and the load of that section. The branch length method of 402.4.2 differs by sizing each unsized branch with its own length from the point of delivery.
Reference: 2018 NC Fuel Gas Code (2015 IFGC with NC amendments), IFGC 402.4.1
A 100,000 Btu/h furnace is the only appliance on a natural gas line. Using 1,000 Btu per cubic foot, the longest length of 40 feet and Table 402.4(2) (Schedule 40 steel, inlet under 2 psi, 0.5 in. w.c. drop), what is the smallest pipe size?
Answer: 3/4 inch
Load = 100,000 / 1,000 = 100 CFH. In the 40-foot row of Table 402.4(2), 1/2-inch pipe carries 81 CFH (too small) and 3/4-inch carries 170 CFH, so 3/4-inch is the smallest size that works.
Reference: 2018 NC Fuel Gas Code (2015 IFGC with NC amendments), IFGC 402.4.1 and Table 402.4(2)
New natural gas piping in a house will operate at a maximum working pressure of 7 inches water column (about 0.25 psig) and will be tested with no manifolds, regulators or other pressure-regulating devices in place. What is the minimum test pressure under Section 406.4.1 as written in the NC code?
Answer: 10 psig
Section 406.4.1 requires a test pressure of at least 1-1/2 times the proposed maximum working pressure but not less than 10 psig, irrespective of design pressure. 1.5 x 0.25 = 0.375 psig, so the 10 psig floor controls. The 3 psig floor applies only to the exception for systems tested with regulators or other pressure-regulating devices in place.
Reference: 2018 NC Fuel Gas Code (2015 IFGC with NC amendments), IFGC 406.4.1
Gas is being turned on for the first time into a system of new gas piping. Under Section 406.6.2, what must the inspection of the entire system confirm during that process?
Answer: There are no open fittings or ends, and valves at unused outlets are closed and plugged or capped
Section 406.6.2 requires that, while gas is turned on into new piping, the entire system be inspected to determine that there are no open fittings or ends and that all valves at unused outlets are closed and plugged or capped. Section 406.6.3 then requires a leak check immediately after the gas is turned on, with the supply shut off until any leak is repaired. Firing appliances and purging are separate steps, and the code does not make the gas supplier sign off on the piping.
Reference: 2018 NC Fuel Gas Code (2015 IFGC with NC amendments), IFGC 406.6.2 and 406.6.3
A gas range is installed in a kitchen. Where must its appliance shutoff valve be under Section 409.5.1?
Answer: In the same room, within 6 feet of the range, upstream of the union or connector it serves
Section 409.5.1 requires the shutoff valve to be in the same room as the appliance, within 6 feet of it, and installed upstream of the union, connector or quick-disconnect device it serves, with access. Section 409.5.2 gives a limited exception for vented decorative appliances and room heaters.
Reference: 2018 NC Fuel Gas Code (2015 IFGC with NC amendments), IFGC 409.5.1
An enclosure holds 90,000 Btu/h of gas appliances, and combustion air comes through a single permanent opening to the outdoors under Section 304.6.2. What is the minimum free area of that opening, ignoring the vent connector area?
Answer: 30 square inches
The single opening must have at least 1 square inch per 3,000 Btu/h of total input: 90,000 / 3,000 = 30 square inches, and not less than the sum of the vent connector areas. It must start within 12 inches of the top, and the appliance needs 1 inch clearance at the sides and back and 6 inches at the front.
Reference: 2018 NC Fuel Gas Code (2015 IFGC with NC amendments), IFGC 304.6.2
Sources
- PSI: NC Plumbing, Heating and Fire Sprinkler Contractors Candidate Information Bulletin (updated 8/25/2026) (opens in a new tab)
- NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors (opens in a new tab)
- NC Board: 2024 code delay notice and exam book reference list (opens in a new tab)
- NC Office of State Fire Marshal: code book sales (opens in a new tab)
Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.