North Carolina licensing exam

North Carolina Electrical SP-SFD (Single-Family Dwelling) Exam: Practice Test & Licensing Guide

The PSI exam for North Carolina's special restricted single-family detached residential dwelling (SP-SFD) electrical contractor license: 40 open-book questions in 3 hours on the 2020 NEC and NC licensing law. 70% to pass.

Questions
40
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Bonding and Grounding

A builder pours the footing for a new house with steel reinforcing bar in it, and the electrician plans to use it as a concrete-encased electrode. What must the reinforcing bar provide under 250.52(A)(3)?

Requirements at a glance

AgencyNC State Board of Examiners of Electrical Contractors (NCBEEC); exams by PSI
ClassificationSpecial restricted single-family detached residential dwelling (SP-SFD); 3,000 hours of experience
Exam40 questions, 3 hours, open book, 70% to pass
Books allowed2020 NEC, NFPA 72 (2013) and the NASCLA Contractor's Guide (current edition), per the handbook
Fees$125 exam fee to the Board (statutory maximum, G.S. 87-44); annual license fee maximum $100 for SP-SFD (G.S. 87-44)

Anyone qualifying an SP-SFD electrical contractor license from the NC State Board of Examiners of Electrical Contractors, which limits work to single-family detached dwellings.

How to get licensed, step by step

  1. Apply to the Board

    Send the examination application to the NCBEEC. You get a Notice of Approval with a 90-day authorization period.

    NC State Board of Examiners of Electrical Contractors (NCBEEC) (opens in a new tab)

  2. Wait for PSI's email

    PSI emails your Test Taker ID after your authorization starts.

    Schedule with PSI (NC electrical contractors) (opens in a new tab)

  3. Take the exam

    Bring two IDs and your own tabbed 2020 NEC, 2013 NFPA 72 and NASCLA guide. Approval covers one attempt.

    Schedule with PSI (NC electrical contractors) (opens in a new tab)

How to prepare

  • Laws, rules and business practices are the largest block (8 of 40); bonding and grounding has 5.
  • Project value: G.S. 87-43.4 ties SP-SFD to the Limited project maximum in G.S. 87-43.3 ($100,000 by statute), but Rule .0801 calls SP-SFD a special restricted class with no project value limit, and Rule .0303 covers only Limited and Intermediate. Confirm the limit with the Board; no $60,000 SP-SFD cap is asserted here.
  • Study residential load calculations and service equipment; tab NEC Articles 220, 250 and 310.
  • Tab your books with permanent tabs before exam day. Highlighting is allowed; writing, sticky flags and loose papers are not.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2020 NEC and the NASCLA NC Electrical guide. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • NFPA 70: National Electrical Code (NEC), 2020 edition (bring your own)
  • NFPA 72: National Fire Alarm and Signaling Code, 2013 edition (the handbook lists it for SP-SFD)
  • Contractor's Guide to Business, Law and Project Management (NASCLA), current edition
  • G.S. Chapter 87, Article 4 (Electrical Contractors Licensing Law) and 21 NCAC Chapter 18B (Board rules)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Bonding and Grounding5
Overcurrent Protection4
Wiring Methods and Terminations3
Boxes and Fittings4
Service Entrance and Equipment4
Motors and Control Wiring2
Special Occupancies and Hazardous Locations1
Load Calculations4
Appliances, Equipment, and Lighting3
General2
Laws, Rules, Basic Business Practices and Practical Applications8

Exam day details

  • Administered by PSI Services for the NC State Board of Examiners of Electrical Contractors.
  • Fee: $125, paid to the Board with your exam application. License fees are separate.
  • 40 questions in 3 hours; 70% to pass. Blueprint counts are the SP-SFD column of the Board's handbook.
  • Experience: at least 3,000 hours for the SP-SFD classification. The Board's handbook lists the license fee separately.
  • Project value: G.S. 87-43.4 limits an SP-SFD license to single-family detached dwelling projects not above the maximum value set in G.S. 87-43.3 for a Limited license ($100,000 statutory maximum). Board rules do not line up cleanly: Rule .0303 implements the statute only for Limited and Intermediate, while Rule .0801 treats SP-SFD as a special restricted class with no project value limit. Confirm the current limit with the Board; this site does not assert a $60,000 cap for SP-SFD.
  • You need Board approval before you test; approval covers one attempt and a 90-day window.
  • Open book with the 2020 NEC, NFPA 72 (2013) and the NASCLA guide (the handbook lists the 2013 fire alarm code for SP-SFD). Permanent tabs only.

Frequently asked questions

How many questions are on the NC SP-SFD exam?

40 questions in a maximum of 3 hours, according to the NCBEEC handbook.

What work does an SP-SFD license cover?

Electrical contracting on single-family detached residential dwellings only.

Which NEC edition is used?

The 2020 NEC.

Free questions with answers

Show all 10 free questions and answers
  1. A builder pours the footing for a new house with steel reinforcing bar in it, and the electrician plans to use it as a concrete-encased electrode. What must the reinforcing bar provide under 250.52(A)(3)?

    Answer: At least 20 ft of one or more bars, 1/2 in. or larger, in the footing

    A concrete-encased electrode under 250.52(A)(3) is at least 20 ft of one or more steel reinforcing bars or rods not less than 1/2 in. in diameter (or 20 ft of bare copper, 4 AWG or larger), encased in at least 2 in. of concrete near the bottom of a foundation or footing in direct contact with the earth. The 10 ft, 3/8 in. and 8 ft values do not meet the rule.

    Reference: NFPA 70, National Electrical Code, 2020, 250.52(A)(3)

  2. A feeder to a dwelling subpanel uses 2 AWG copper with 75 degrees C insulation (115 A in Table 310.16). The load is 100 A, and it is not a multioutlet branch circuit. What is the largest standard overcurrent device 240.4(B) allows?

    Answer: 125 A

    The conductor ampacity of 115 A is not a standard rating in 240.6(A). Section 240.4(B) permits the next higher standard rating (125 A) when the conductors are not part of a multioutlet branch circuit supplying receptacles, the ampacity does not match a standard rating, and the next size is 800 A or less. 110 A is below the ampacity and 150 A is two sizes up.

    Reference: NFPA 70, National Electrical Code, 2020, 240.4(B); 240.6(A); Table 310.16

  3. Type UF cable is directly buried in a yard to supply a 240-volt, 40-ampere circuit to a hot tub pump at a one-family dwelling. Using Table 300.5, what is the minimum cover?

    Answer: 24 in.

    The 12 in. reduction applies only to residential branch circuits of 120 volts or less with GFCI protection and overcurrent protection of 20 A or less. A 240-volt, 40 A circuit uses the general direct-burial value in Column 1 of Table 300.5, which is 24 in.

    Reference: NFPA 70, National Electrical Code, 2020, Table 300.5

  4. A nonmetallic box contains four 14 AWG and two 12 AWG insulated circuit conductors that all originate outside the box (from two 14-2 and one 12-2 NM cables with ground), and one duplex receptacle on 12 AWG conductors. There are no cable clamps. Using Table 314.16(B) (14 AWG = 2.00 cu in., 12 AWG = 2.25 cu in.), what minimum box volume is required?

    Answer: 19.25 cu in.

    Count: four 14 AWG = 8.00; two 12 AWG = 4.50; all equipment grounding conductors together count once at the largest size, 12 AWG = 2.25; the receptacle yoke counts twice the largest conductor connected to it, 2 x 2.25 = 4.50. Total 19.25 cu in. 14.75 omits the yoke, 23.25 counts each grounding conductor separately, and 18.75 counts the yoke at the 14 AWG size.

    Reference: NFPA 70, National Electrical Code, 2020, 314.16(B)(1), (B)(4), (B)(5)

  5. Overhead 120/240-volt feeder conductors run from a house to a detached garage and cross a residential driveway that has no truck traffic. What is the minimum clearance above the driveway under 225.18?

    Answer: 12 ft

    Section 225.18 requires 12 ft above final grade over residential property and driveways, and over commercial areas not subject to truck traffic, where the voltage is limited to 300 volts to ground. 18 ft applies over public streets and areas subject to truck traffic, and 10 ft applies only to pedestrian-only areas with limited conditions.

    Reference: NFPA 70, National Electrical Code, 2020, 225.18

  6. A packaged air-conditioning unit has no minimum circuit ampacity marking. It has a hermetic motor-compressor with a rated-load current of 14.2 A and a fan motor of 1.5 A. Using 440.33, what is the minimum conductor ampacity?

    Answer: 19.25 A

    Section 440.33 requires 125 percent of the largest motor-compressor rated-load current plus the other motor loads: (14.2 x 1.25 = 17.75) + 1.5 = 19.25 A. 15.7 A is the plain sum, 19.6 A applies 125 percent to the sum, and 25.0 A is not derived from the rule.

    Reference: NFPA 70, National Electrical Code, 2020, 440.33

  7. A one-family dwelling has 2,650 sq ft of finished living area, a 600 sq ft attached garage and a 180 sq ft open porch. At 3 VA per square foot, what is the general lighting load under 220.12 (before demand factors)?

    Answer: 7,950 VA

    Dwelling unit floor area is computed from outside dimensions and does not include open porches, garages or unused or unfinished spaces not adaptable for future use (220.12). Only the 2,650 sq ft of living area counts: 2,650 x 3 = 7,950 VA. 9,750 VA adds the garage, and 10,290 VA adds the garage and the porch.

    Reference: NFPA 70, National Electrical Code, 2020, 220.12; Table 220.12; 220.14(J)

  8. A 5,500-watt, 240-volt storage-type water heater of 50-gallon capacity has its own branch circuit. What is the smallest standard overcurrent device allowed under 422.13?

    Answer: 30 A

    A fixed storage water heater with a capacity of 120 gal or less is treated as a continuous load, so the branch circuit is at least 125 percent of the rating: 5,500 / 240 = 22.9 A; 22.9 x 1.25 = 28.6 A. The smallest standard device at or above that is 30 A. 25 A is under the minimum, and 35 A and 40 A are larger than needed.

    Reference: NFPA 70, National Electrical Code, 2020, 422.13; 240.6(A)

  9. A dwelling's 120/240-volt panelboard has no live parts or grounded surfaces opposite it. What is the minimum depth of working space in front of it under Table 110.26(A)(1)?

    Answer: 3 ft

    Table 110.26(A)(1) requires 3 ft minimum depth of working space for 0 to 150 volts to ground under conditions 1, 2 and 3. Larger depths (3-1/2 ft and 4 ft) apply to higher voltages, so 4 ft and 6 ft are not needed for a house panel, and 2 ft is too shallow.

    Reference: NFPA 70, National Electrical Code, 2020, 110.26(A)(1); Table 110.26(A)(1)

  10. How many total hours of experience, and how many of them must be primary experience, does an applicant need to sit for the single-family detached residential dwelling (SP-SFD) electrical exam?

    Answer: 3,000 hours, at least 2,000 of them primary

    Rule .0201(b)(4) requires at least 3,000 hours of experience for the SP-SFD classification, of which at least 2,000 hours must be primary experience; the balance may be primary, secondary or both. 5,750 and 5,000 are the intermediate figures, and 3,000 primary is not required.

    Reference: NC Electrical Contractors Licensing Law, G.S. Chapter 87, Article 4 (Board handbook), 21 NCAC 18B .0201(b)(4)

Sources

Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.