North Carolina licensing exam

North Carolina Electrical Contractor Exam: Practice Test & Licensing Guide

The PSI exam for North Carolina's Limited, Intermediate and Unlimited electrical contractor licenses: 100 open-book questions on the 2020 NEC, NFPA 72 (2013), load calculations and NC licensing law. 70% to pass.

Questions
100
Time limit
6 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Bonding and Grounding

An electrician pulls an insulated equipment grounding conductor for a new branch circuit. Which insulation finish is permitted for it?

Requirements at a glance

AgencyNC State Board of Examiners of Electrical Contractors (NCBEEC); exams by PSI
ClassificationsLimited (3,000 hours, 2,000 primary), Intermediate (5,750; 5,000), Unlimited (9,000; 8,000). No journeyman or master exam.
Exam100 questions, 6 hours, open book, 70% to pass
Books allowed2020 NEC, NFPA 72 (2013), NASCLA Contractor's Guide (current edition)
Fees$125 exam fee to the Board (statutory maximum, G.S. 87-44); annual license fee maximums are $100 Limited, $150 Intermediate and $200 Unlimited (G.S. 87-44)

Anyone qualifying a Limited, Intermediate or Unlimited electrical contractor license from the NC State Board of Examiners of Electrical Contractors. North Carolina has no separate journeyman or master electrician exam.

How to get licensed, step by step

  1. Apply to the Board

    Send the examination application and $125 fee to the NCBEEC. You get a Notice of Approval with a 90-day authorization period.

    NC State Board of Examiners of Electrical Contractors (NCBEEC) (opens in a new tab)

  2. Wait for PSI's email

    PSI emails your Test Taker ID 48 to 72 hours after your authorization starts. You can't register before it arrives.

    Schedule with PSI (NC electrical contractors) (opens in a new tab)

  3. Take the exam

    Bring two IDs and your own tabbed 2020 NEC, 2013 NFPA 72 and NASCLA guide. Approval covers one attempt; after a failure reapply and wait 3 months.

    Schedule with PSI (NC electrical contractors) (opens in a new tab)

  4. Apply for the license

    Results go to the Board electronically. Complete a license application to activate your license.

    NC State Board of Examiners of Electrical Contractors (NCBEEC) (opens in a new tab)

How to prepare

  • Bonding and grounding (11) and load calculations (11) are the biggest code sections: tab NEC Articles 250, 220 and Annex D examples.
  • Fifteen items are laws, rules and business practices, including NASCLA content, plans, estimating and NFPA 72. Read G.S. 87 Article 4 and 21 NCAC 18B, which are printed in the Board's handbook.
  • The handbook allows notes in your books (pencil notes must be highlighted); permanent tabs only.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2020 NEC and the NASCLA NC Electrical guide. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • NFPA 70: National Electrical Code (NEC), 2020 edition (bring your own)
  • NFPA 72: National Fire Alarm and Signaling Code, 2013 edition (Limited, Intermediate, Unlimited and special-classification fire alarm exams)
  • Contractor's Guide to Business, Law and Project Management (NASCLA), current edition
  • G.S. Chapter 87, Article 4 (Electrical Contractors Licensing Law) and 21 NCAC Chapter 18B (Board rules); exam questions come from them, and they are printed in the Board's handbook

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Bonding and Grounding11
Overcurrent Protection9
Wiring Methods and Terminations10
Boxes and Fittings7
Service Entrance and Equipment9
Motors and Control Wiring9
Special Occupancies and Hazardous Locations9
Load Calculations11
Appliances, Equipment, and Lighting7
General3
Laws, Rules, Basic Business Practices and Practical Applications15

Exam day details

  • Administered by PSI Services for the NC State Board of Examiners of Electrical Contractors.
  • Fee: $125, paid to the Board with your exam application. License fees are separate.
  • 100 questions in 6 hours; 70 correct (70%) to pass. The blueprint here is the Unlimited column of the Board's handbook; Limited and Intermediate exams shift a few questions between topics (for example Limited has 18 laws and business items and Unlimited 15).
  • Intermediate and Unlimited exams add emergency systems, health care, assembly, hazardous locations and high-voltage content. Limited covers one project at a time up to $60,000 and 1,000 volts, and Intermediate up to $150,000; those are the Board's current limits under 21 NCAC 18B .0303(4), while G.S. 87-43.3 sets the statutory maximums at $100,000 and $200,000 (the handbook notes the difference). Unlimited has no value cap.
  • Experience: 3,000 hours for Limited (2,000 primary), 5,750 for Intermediate (5,000) and 9,000 for Unlimited (8,000).
  • You need Board approval before you test. Approval covers one attempt and a 90-day window; after a failure you must reapply and wait 3 months before testing in the same classification.
  • Open book with the 2020 NEC, NFPA 72 (2013) and the NASCLA guide only. Softbound, spiral or hardbound; permanent tabs only. Calculators and scratch paper are provided.
  • Edition note: the handbook (July 2026) names the 2020 NEC. Check the current handbook before you buy books.

Frequently asked questions

What's on the North Carolina electrical contractor exam?

100 questions: bonding and grounding 11, load calculations 11, wiring methods and terminations 10, overcurrent protection 9, service entrance and equipment 9, motors and control wiring 9, special occupancies and hazardous locations 9, boxes and fittings 7, appliances, equipment and lighting 7, general 3, and laws, rules, business practices and practical applications 15 (Unlimited blueprint).

Which NEC edition does North Carolina use?

The 2020 NEC, with the 2013 NFPA 72 for fire alarm items.

Is there a journeyman or master electrician exam in North Carolina?

No. North Carolina licenses electrical contractors in three classifications (Limited, Intermediate, Unlimited) and tests at that level.

Free questions with answers

Show all 10 free questions and answers
  1. An electrician pulls an insulated equipment grounding conductor for a new branch circuit. Which insulation finish is permitted for it?

    Answer: Continuous green, or green with one or more yellow stripes

    Section 250.119 requires an insulated equipment grounding conductor to be continuous green or green with one or more yellow stripes. White and gray are reserved for grounded (neutral) conductors under 200.6, so those finishes would be confused with the neutral.

    Reference: NFPA 70, National Electrical Code, 2020 edition, 250.119

  2. A single feeder to a panelboard uses 6 AWG copper with 60 degrees C insulation, ampacity 55 A from Table 310.16, and the load is under 55 A. It is not a multioutlet branch circuit. What is the largest standard overcurrent device allowed by 240.4(B)?

    Answer: 60 A

    240.4(B) allows the next higher standard rating of overcurrent device when the conductor ampacity does not match a standard rating, the device is 800 A or less, and it is not a multioutlet branch circuit. After 55 A the next standard size in 240.6(A) is 60 A. 55 A is not a standard rating, and 70 A is two sizes up.

    Reference: NFPA 70, National Electrical Code, 2020 edition, 240.4(B); 240.6(A)

  3. Eight current-carrying 10 AWG THHN copper conductors are installed in one conduit at a 30 degrees C ambient. Using the 90 degrees C ampacity of 40 A (Table 310.16) and the adjustment factor in Table 310.15(C)(1), what is the adjusted ampacity?

    Answer: 28 A

    For 7 through 9 current-carrying conductors, Table 310.15(C)(1) (the 2020 number for the old 310.15(B)(3)(a)) applies 70 percent, so 40 x 0.70 = 28 A. The 80 percent factor (32 A) is for 4 through 6 conductors, and 50 percent (20 A) is for 10 through 20. 28 A is also below the 240.4(D) limit of 30 A.

    Reference: NFPA 70, National Electrical Code, 2020 edition, 310.15(C)(1); Table 310.15(C)(1); Table 310.16

  4. A pull box has a 3-inch raceway, entering one wall, with two 2-inch raceways on the same wall and in the same row, and the conductors make an angle pull. Under 314.28(A)(2), what is the minimum distance from the 3-inch raceway entry to the opposite wall?

    Answer: 22 in.

    For angle pulls, 314.28(A)(2) requires a distance of at least six times the trade size of the largest raceway plus the sum of the trade sizes of the other raceways on the same wall in the same row. 6 x 3 = 18, plus 2 + 2 = 4, total 22 in. 18 in. leaves out the additional raceways.

    Reference: NFPA 70, National Electrical Code, 2020 edition, 314.28(A)(2)

  5. What is the minimum rating of the service disconnecting means for a one-family dwelling under 230.79(C)?

    Answer: 100 A, 3-wire

    230.79(C) requires the service disconnecting means for a one-family dwelling to have a rating of not less than 100 A, 3-wire. 230.79(A) to (D) cover other cases: 15 A for one-circuit installations, 30 A for two-circuit installations, and 60 A for other loads.

    Reference: NFPA 70, National Electrical Code, 2020 edition, 230.79(C)

  6. A 20-hp, 208-volt, three-phase motor has a Table 430.250 full-load current of 59.4 A. What is the minimum ampacity of the branch-circuit conductors for this continuous-duty motor?

    Answer: 74.25 A

    430.22(A) requires branch-circuit conductors for a single motor to have an ampacity of at least 125% of the full-load current taken from the table (430.6(A)(1)): 59.4 x 1.25 = 74.25 A. 59.4 A leaves out the factor, and 89.1 A would use 150%.

    Reference: NFPA 70, National Electrical Code, 2020 edition, 430.22(A); Table 430.250

  7. In a major repair garage where gasoline-fueled vehicles are repaired, no mechanical ventilation is provided to declassify the floor area. What is the classification of the area from the floor up to 18 in. above it?

    Answer: Class I, Division 2

    Under 511.3, where a major repair garage does not have the mechanical ventilation that would make the floor area unclassified (at least four air changes per hour or 1 cfm per sq ft, exhausted near the floor), the entire floor area up to 18 in. above the floor is Class I, Division 2. Division 1 is for areas where vapors are normally present, such as pits in some cases, and Class II involves combustible dust. With the required ventilation the floor area becomes unclassified.

    Reference: NFPA 70, National Electrical Code, 2020 edition, 511.3 (major repair garages, floor areas)

  8. Using Table 220.55 column C and its Note 1, what is the demand load for a single 14-kW household electric range?

    Answer: 8,800 W

    A single range of 12 kW or less has a column C demand of 8 kW. Note 1 says to increase the column C value by 5 percent for each additional kilowatt of range rating over 12 kW. 14 kW is 2 kW over, so the increase is 10 percent: 8,000 x 1.10 = 8,800 W. The full nameplate (14,000 W) is not used.

    Reference: NFPA 70, National Electrical Code, 2020 edition, Table 220.55, Note 1

  9. For the unlimited electrical contractor classification, how many hours of experience are required to sit for the exam, and how many of them must be primary experience?

    Answer: 9,000 hours total, at least 8,000 of them primary

    21 NCAC 18B .0201(b)(3) and G.S. 87-43.3(a)(3) require unlimited applicants to have at least 9,000 hours of experience, with at least 8,000 hours of primary experience, which is direct installation of wiring and equipment governed by the NEC. 5,750/5,000 is the intermediate requirement and 3,000/2,000 is limited.

    Reference: 21 NCAC Chapter 18B, Board rules (Board handbook), 21 NCAC 18B .0201(b)(3); G.S. 87-43.3(a)(3)

  10. In a dwelling kitchen, receptacles for a wall countertop space must be placed so that no point along the wall line is more than how far from a receptacle?

    Answer: 24 in.

    210.52(C)(1) requires receptacle outlets at each wall countertop space so that no point along the wall line is more than 24 in. from a receptacle, measured horizontally. That works out to receptacles about every 48 in. A 12-ft figure appears in the general room rule, not for countertops.

    Reference: NFPA 70, National Electrical Code, 2020 edition, 210.52(C)(1)

Sources

Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.