New York licensing exam

NYC Gas Work Qualification Exam (NYC DOB): Practice Test & Licensing Guide

The written exam for the full Gas Work Qualification from the NYC Department of Buildings: 50 questions in 2 hours on gas detection, utility procedures, safety, hazards and violations. Open book, 35 correct (70%) to pass.

Questions
50
Time limit
2 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Gas Detection Testing

New gas distribution piping will operate at 1/2 psig. Under Section 406.4 of the 2014 NYC Fuel Gas Code, what pressure test is required?

Requirements at a glance

AgencyNYC Department of Buildings; exams by CPS HR Consulting at Pearson VUE
Exam50 questions, 2 hours, 35 correct (70%)
Books allowedOpen book: references are provided on screen
Fees$585 written exam fee per DOB's pages (older 2023 bulletins print $525), plus DOB license and registration fees

Plumbers who want a full NYC Gas Work Qualification to perform gas work under the supervision of a licensed master plumber. The limited qualification needs a DOB-approved 16-hour training course instead of this exam.

How to get licensed, step by step

  1. Apply to DOB for the exam

    Submit a typed exam application (form LIC41 or DOB NOW) with the exam fee to the NYC Department of Buildings. DOB reviews it before CPS HR can schedule you.

    NYC DOB: exams and qualifications (opens in a new tab)

  2. Schedule the Gas Work Qualification exam

    CPS HR emails scheduling instructions in about 2 to 3 weeks. Tests are taken at Pearson VUE centers, and you have 6 months from your application date to sit. Each eligibility notice covers one attempt; after a fail you reapply and pay again.

    CPS HR: NYC DOB exams and candidate bulletins (opens in a new tab)

  3. Apply for the qualification in DOB NOW

    After you pass, create a DOB NOW: Licensing profile and submit your application with ID, experience affidavits (5 years, or 1 year with a NYS Department of Labor approved apprenticeship certificate) and the $50 registration fee.

    NYC DOB: Gas Work Qualification (opens in a new tab)

How to prepare

  • The exam is open book, so practice looking things up in the 2014 NYC Fuel Gas Code and Plumbing Code quickly rather than memorizing tables. The 8/1/2024 bulletin tests the 2014 editions, not the 2022 codes now in force for work.
  • Gas detection testing, utility procedures, safety, and hazards and violations are 10 questions each; business practices is 6 and new technology is 4.
  • A full qualification works under a licensed master plumber. The limited qualification uses a 16-hour DOB-approved course and no exam.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2014 NYC Fuel Gas Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • 2014 NYC Fuel Gas Code (FGC), Chapters 1, 3, 4, 6 and Appendices E and G (per the 8/1/2024 candidate bulletin)
  • 2014 NYC Plumbing Code (PC), Chapters 1, 3 and 5
  • 2014 NYC General Administrative Provisions (Administrative Code Title 28, Chapters 1 and 4, Articles 113, 204, 216 and 318)

What's on the exam

Official content outline from CPS HR Consulting (number of questions per topic):

TopicQuestions
Gas Detection Testing10
Common Utility Processes and Procedures10
Gas Work Business Practices6
Gas Work Safety10
Gas Work New Technology4
Gas Work Hazards and Violations10

Exam day details

  • Administered by CPS HR Consulting for the NYC Department of Buildings (tests at Pearson VUE).
  • Fee: $585 written exam fee per DOB's Master Plumber and Gas Work Qualification pages (the 2023 candidate bulletins and an older gas work PDF still print $525). DOB license, background investigation and registration fees are separate.
  • 50 questions in 2 hours; 35 correct (70%) to pass. Since 8/1/2024 the exam is open book, with the code references provided on screen. The 8/1/2024 candidate bulletin names the 2014 NYC General Administrative Provisions, Fuel Gas Code and Plumbing Code.
  • A full qualification lets you do gas work under the direct and continuing supervision of a licensed master plumber. It does not expire. Candidates need to be 18 and show 5 years of experience (or 1 year plus a NYS Department of Labor approved apprenticeship); DOB's registration fee is $50.
  • The limited qualification (supervised, expires after five years, not renewable) requires a DOB-approved training program of at least 16 hours and no exam.
  • Apply to DOB first (form LIC41 or DOB NOW). CPS HR then emails scheduling instructions in about 2 to 3 weeks, and you have 6 months from the date of your application to sit.
  • Each eligibility notice covers one attempt. If you fail, you must reapply to DOB and pay the exam fee again.
  • Pearson VUE test centers: CPS HR candidate line 855-224-6977, NYCDOB@cpshr.us.

Note: The code editions and topic counts come from the CPS HR candidate bulletin dated 8/1/2024, which tests the 2014 NYC codes even though the 2022 codes are now in force for work. The bulletin still prints a $525 exam fee where DOB's page says $585. Check the current bulletin before you test.

Frequently asked questions

Is the Gas Work Qualification exam open book?

Yes. Since August 1, 2024 the code references are provided on screen, so practice finding the right section as well as knowing the rules.

What is on the gas work exam?

50 questions: gas detection testing 10, common utility processes and procedures 10, gas work safety 10, hazards and violations 10, business practices 6 and new technology 4.

Do I need an exam for the limited qualification?

No. The limited qualification requires a DOB-approved training program of at least 16 hours, not the written exam.

Free questions with answers

Show all 10 free questions and answers
  1. New gas distribution piping will operate at 1/2 psig. Under Section 406.4 of the 2014 NYC Fuel Gas Code, what pressure test is required?

    Answer: 3 psig for a minimum of 30 minutes

    Section 406.4 of the 2014 NYC Fuel Gas Code sets fixed test pressures by distribution pressure band. For distribution pressures up to 1/2 psig, the piping is tested with a nonmercury gauge at 3 psig for at least 30 minutes. 50 psig is the test for over 1/2 through 5 psig, and 10 psig is the public-corridor test in Section 404.1. The 1 1/2 times rule is not how the 2014 NYC code sets test pressure.

    Reference: 2014 NYC Fuel Gas Code, Section 406.4, item 1

  2. A new gas distribution system will operate at 4 psig. What pressure test does Section 406.4 of the 2014 NYC Fuel Gas Code require?

    Answer: 50 psig for a minimum of 30 minutes

    Section 406.4 of the 2014 NYC Fuel Gas Code: distribution pressures over 1/2 psig through 5 psig are tested at 50 psig for at least 30 minutes. 4 psig falls in that band. 3 psig is the test for piping up to 1/2 psig, and 100 psig for 1 hour is the test for over 5 through 15 psig.

    Reference: 2014 NYC Fuel Gas Code, Section 406.4, item 1

  3. Where must the shutoff valve for a gas meter be located?

    Answer: On the supply side of the meter

    Section 409.2 of the 2014 NYC Fuel Gas Code requires every meter to be equipped with a shutoff valve located on the supply (inlet) side of the meter, so the meter can be isolated.

    Reference: 2014 NYC Fuel Gas Code, Section 409.2

  4. How is a branch to be taken off a gas riser?

    Answer: With not less than a two-elbow swing

    Section 404.5 of the 2014 NYC Fuel Gas Code requires branches to be taken off the riser with not less than a two-elbow swing, which lets the riser expand and move without stressing the branch. Bushings are prohibited (Section 403.10.4), and a straight tee gives no flexibility.

    Reference: 2014 NYC Fuel Gas Code, Section 404.5

  5. A repair to existing gas distribution piping requires the gas flow to the building to be shut off. Under Section 406.6.2.2, who must notify the utility?

    Answer: The owner or the owner's authorized representative

    Section 406.6.2.2 of the 2014 NYC Fuel Gas Code: when alterations, extensions or repairs to existing gas meter piping or gas distribution piping require the gas flow to a building to be shut off, the utility must be notified by the owner or the owner's authorized representative. The department and its inspectors do not make this notice.

    Reference: 2014 NYC Fuel Gas Code, Section 406.6.2.2

  6. A 120,000 Btu/h appliance is in an enclosure with two permanent openings direct to outdoors. What is the minimum free area of each opening?

    Answer: 30 square inches

    Section 304.6.1 requires 1 square inch per 4,000 Btu/h for openings communicating directly with the outdoors (or through vertical ducts): 120,000 / 4,000 = 30 square inches each. 60 is the horizontal duct figure at 1 per 2,000 Btu/h.

    Reference: 2014 NYC Fuel Gas Code, Section 304.6.1

  7. In the two-opening outdoor air method, where must the two openings be placed in the enclosure?

    Answer: One within 12 inches of the top and one within 12 inches of the bottom

    Section 304.6.1 requires one opening commencing within 12 inches of the top of the enclosure and one within 12 inches of the bottom, communicating directly or by ducts with the outdoors.

    Reference: 2014 NYC Fuel Gas Code, Section 304.6.1

  8. Piped fuel gas is used with oxygen in a hot work operation. What does Section 410.4 require?

    Answer: A listed combination flashback arrestor and backflow check valve on both lines

    Section 410.4 of the 2014 NYC Fuel Gas Code: where fuel gas is used with oxygen in hot work, a listed device serving as a combination flashback arrestor and backflow check valve is installed at an approved location on both the fuel gas and the oxygen supply lines. If the piped gas pressure is too low for safe operation, approved pressure-boosting equipment is installed between the meter and the appliance.

    Reference: 2014 NYC Fuel Gas Code, Section 410.4

  9. Where is gas piping prohibited by Section 404.1?

    Answer: In a stair enclosure or required exit

    Section 404.1 of the 2014 NYC Fuel Gas Code states gas piping shall not be installed within a stair enclosure or required exit or exit way. It also bars piping in standpipe riser shafts, fire pump rooms, fire-rated assemblies and public corridors (with a limited residential exception).

    Reference: 2014 NYC Fuel Gas Code, Section 404.1

  10. A residential building has no floors below grade. Which condition applies to gas piping in a public corridor under the exception in Section 404.1?

    Answer: Piping at the lowest level or lowest residential level, at no more than 1/2 psi

    Under the public corridor exception in Section 404.1 of the 2014 NYC Fuel Gas Code, piping may be in the corridor only at the lowest level or lowest residential level, valves must be accessible, corridor pressure may not exceed 1/2 psi (14 inch w.c.), the piping is tested at 10 psig for 30 minutes, the corridor must be ventilated, and the pipe may not be in a return air plenum.

    Reference: 2014 NYC Fuel Gas Code, Section 404.1, Public corridor exception