New Mexico licensing exam

New Mexico MM-3 Heat, Vent and Air Conditioning Contractor Exam: Practice Test & Licensing Guide

New Mexico's MM-3 heating, ventilation and air conditioning contractor exam: 100 questions on motors and controls, piping, heating and cooling, refrigeration and duct work, from the 2021 UMC and listed HVAC references. Open book, 75% to pass.

Questions
100
Time limit
4.083333333333333 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Duct Work, Ventilation, and Exhaust

Flexible duct is supported every 4 feet on a horizontal run. What is the maximum sag allowed between those hangers under the 2021 UMC?

Requirements at a glance

AgencyNew Mexico Regulation and Licensing Department, Construction Industries Division (CID); exams by PSI
Exam100 questions, 245 minutes, 75% to pass, open book
Books allowed2021 UMC and NMAC 14.9.2, Modern Refrigeration and Air Conditioning (19th or 20th ed.), IPT's Pipe Trades Handbook, SMACNA HVAC Duct Construction Standards (3rd ed.), ATP Sheet Metal, a duct calculator and printed pressure-enthalpy charts
FeesExam fees are paid to PSI (see the exam details above); license fees are separate. Check CID for current license fees.
TimingTest within 6 months of becoming eligible. The exam fee and a passing score are each valid for 1 year.

Contractors applying to Construction Industries Division for an MM-3 heat, vent and air conditioning license. You also need the Business and Law exam.

How to get licensed, step by step

  1. Apply to CID through PSI

    Candidates must be pre-approved before they can schedule. Submit your application and proof of qualifications through PSI's New Mexico construction page, or call PSI's approvals line at 877-663-9267.

    PSI: apply and schedule New Mexico exams (opens in a new tab)New Mexico Construction Industries Division (CID) (opens in a new tab)

  2. Get your references

    Buy the exact code editions in PSI's bulletin. Books must be bound; highlighting, underlining and permanent tabs are allowed, but no loose notes or Post-its.

    PSI Contractor Candidate Information Bulletin (opens in a new tab)New Mexico Administrative Code (NMAC) titles (opens in a new tab)

  3. Schedule and pay PSI

    After approval, contact PSI to schedule a seat and pay. Test sites include Albuquerque, Farmington, Las Cruces, Roswell and Santa Fe.

    PSI: apply and schedule New Mexico exams (opens in a new tab)

  4. Pass and finish your license

    You need 75%. You may not take the same exam more than twice in 30 days. Contractors also need the Business and Law exam; journeyman candidates take a hands-on practical exam too.

    New Mexico Construction Industries Division (CID) (opens in a new tab)PSI Contractor Candidate Information Bulletin (opens in a new tab)

How to prepare

  • Motors, controls and low voltage wiring, heating and cooling general knowledge, and duct work, ventilation and exhaust are 20 questions each.
  • Refrigerants and refrigeration (15) leans on Modern Refrigeration; bring a pressure-enthalpy chart titled as such in print.
  • You also need the Business and Law exam.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • Uniform Mechanical Code (UMC), 2021 (IAPMO)

    Gas piping, combustion air and venting for the gas fitter exams; the main code for MM-3 HVAC and pipe fitter; the plumbing exams list it too.

    IAPMO (opens in a new tab)

  • IPT's Pipe Trades Handbook, Robert A. Lee, 2016

    Listed as an allowed reference for the plumbing, gas fitter, HVAC and pipe fitter exams.

Official reference list (as published by the testing agency)
  • Uniform Mechanical Code (UMC), 2021 (IAPMO)
  • New Mexico Mechanical Code (NMAC 14.9.2)
  • Modern Refrigeration and Air Conditioning, 19th or 20th Edition (Goodheart-Willcox)
  • IPT's Pipe Trades Handbook, Robert A. Lee, 2016
  • HVAC Duct Construction Standards, Metal and Flexible, 3rd Edition, 2005 (SMACNA)
  • Sheet Metal, 2006 (American Technical Publishers)
  • A Ductulator or other slide or wheel duct calculator
  • Pressure and enthalpy charts, titled as such in print (graph or table type)

What's on the exam

Official content outline from PSI, (number of questions per topic):

TopicQuestions
Motors, Controls, and Low Voltage Wiring20
Piping10
Heating and Cooling General Knowledge20
Heating and Cooling Equipment and Components15
Refrigerants and Refrigeration15
Duct Work, Ventilation, and Exhaust20

Exam day details

  • Administered by PSI, for the New Mexico Regulation and Licensing Department, Construction Industries Division (CID).
  • Fee: $68.88 per exam, paid to PSI. License and application fees are separate.
  • 100 questions in 245 minutes; 75% to pass (75 points).
  • Open book. Bring bound references; you may highlight, underline and index them with permanent tabs only. No loose papers, notes or Post-it tabs, and no writing in the books.
  • You may bring a duct calculator and printed pressure-enthalpy charts in addition to the books.
  • Get CID pre-approval through PSI first (PSI approvals line 877-663-9267). Once you are eligible you must test within 6 months, or reapply with the Division. Your exam fee is valid for 1 year and a passing score is valid for 1 year.
  • You may not take the same exam more than twice in a 30-day period; after two fails you must wait 30 days from your first attempt.
  • Motors, controls and low voltage wiring (20), heating and cooling general knowledge (20) and duct work, ventilation and exhaust (20) are 60 of the 100 questions.

Frequently asked questions

What's on the New Mexico MM-3 HVAC exam?

PSI's outline, 100 questions: Motors, Controls, and Low Voltage Wiring 20; Piping 10; Heating and Cooling General Knowledge 20; Heating and Cooling Equipment and Components 15; Refrigerants and Refrigeration 15; Duct Work, Ventilation, and Exhaust 20.

Which code editions does the New Mexico exam use?

PSI's bulletin pins the editions: for electrical, the 2020 NEC plus the New Mexico Electrical Code (NMAC 14.10.4); for plumbing and gas, the 2021 UPC and UMC plus the New Mexico plumbing and mechanical codes (NMAC 14.8.2 and 14.9.2); for building, the 2021 IRC or IBC plus NMAC 14.7.3 or 14.7.2. Code questions use only the listed edition.

Who gives the New Mexico contractor and journeyman exams?

PSI, for the Construction Industries Division (CID) of the Regulation and Licensing Department. CID pre-approves your application, then you schedule with PSI at a New Mexico test center (Albuquerque, Farmington, Las Cruces, Roswell or Santa Fe) or an approved center elsewhere.

Free questions with answers

Show all 10 free questions and answers
  1. Flexible duct is supported every 4 feet on a horizontal run. What is the maximum sag allowed between those hangers under the 2021 UMC?

    Answer: 2 inches total for the 4-foot span

    Sag between hangers may not exceed 1/2 inch per foot of support spacing (Section 603.4 installation list). With 4-foot spacing: 0.5 in/ft x 4 ft = 2 inches. Choosing 1/2 inch forgets to multiply by the spacing; 1 inch uses only half the span.

    Reference: 2021 Uniform Mechanical Code, Section 603.4

  2. An air handler supplies 2,500 cfm to an office building. Which arrangement satisfies the 2021 UMC Section 609.1 automatic shutoff requirement?

    Answer: A smoke detector in the main supply duct that cuts power to the fan

    Systems supplying more than 2,000 cfm to enclosed spaces need an automatic shutoff that interrupts power to the air-moving equipment when smoke is detected in the main supply-air duct; the detectors comply with UL 268A. A fire damper or high-limit control does not stop the fan on smoke, and a manual switch is not automatic.

    Reference: 2021 Uniform Mechanical Code, Section 609.1

  3. Three rooftop units of 15, 15 and 20 tons drain into one common condensate line. Using 2021 UMC Table 310.3, what is the minimum size of the common line?

    Answer: 1-1/4 inch

    The table applies to one unit or a combination of units, so add the capacities: 15 + 15 + 20 = 50 tons. 50 tons falls in the 41-90 ton row, which requires 1-1/4 inch. Sizing for the largest single unit (20 tons, 3/4 inch) is the common mistake.

    Reference: 2021 Uniform Mechanical Code, Table 310.3

  4. A furnace is installed in an attic. Under 2021 UMC 304.4, what is the minimum size of the access opening and passageway?

    Answer: 22 inches by 30 inches, and not less than the largest appliance component

    Section 304.4 requires an opening and passageway not less than the largest component of the appliance and not less than 22 x 30 inches. The 22 x 24 inch size is the minimum roof scuttle in 304.3.1.1. The passageway also needs solid flooring at least 24 inches wide, and a 30 x 30 inch work platform at the service side.

    Reference: 2021 Uniform Mechanical Code, Section 304.4

  5. What must PEX and PE-RT tubing in a closed hydronic heating system have under 2021 UMC 1210.4?

    Answer: An oxygen barrier

    Section 1210.4 (Oxygen Diffusion Corrosion) requires PEX and PE-RT tubing in closed hydronic systems to contain an oxygen barrier. Oxygen passing through non-barrier tubing corrodes iron boilers, pumps and other ferrous components.

    Reference: 2021 Uniform Mechanical Code, Section 1210.4

  6. Under 2021 UMC 1104.7, recycled (not reclaimed) refrigerant removed from a customer's rooftop unit may be reused in which system?

    Answer: Same refrigerant and lubricant designation, owned by the same owner

    Section 1104.7.2 lets recycled refrigerant be reused only in systems using the same refrigerant and lubricant designation and belonging to the same owner. Use in another owner's equipment requires reclaiming and testing to AHRI 700 (1104.7.3). Contaminated refrigerant must be reclaimed before reuse.

    Reference: 2021 Uniform Mechanical Code, Section 1104.7.2

  7. A condensing unit's hermetic compressor has a rated-load current of 18 A, and the unit has no other loads. Under NEC 440.32, what minimum ampacity must the branch-circuit conductors have?

    Answer: 22.5 A

    Section 440.32 requires branch-circuit conductors for a single motor-compressor to have an ampacity of at least 125% of the rated-load current or branch-circuit selection current, whichever is greater: 18 x 1.25 = 22.5 A. 20.7 A uses 115%; 31.5 A is 175%, the protective-device multiplier in 440.22.

    Reference: NFPA 70, National Electrical Code, 2020, 440.32

  8. Where must the disconnecting means for a rooftop air-conditioning unit be located under NEC 440.14?

    Answer: In sight from and readily accessible from the unit

    Section 440.14 requires the disconnecting means to be located within sight from, and readily accessible from, the air-conditioning or refrigerating equipment. It may be mounted on or within the unit, but not on panels designed to allow access to the equipment or where it obscures the nameplate.

    Reference: NFPA 70, National Electrical Code, 2020, 440.14

  9. New Mexico amended UMC 907.2 for wall furnaces. Under NMAC 14.9.2.17, what clearance to combustible material must an unlisted wall furnace have?

    Answer: 18 inches

    NMAC 14.9.2.17 adds to the end of UMC 907.2: unlisted wall furnaces shall be installed with clearances to combustible material of not less than 18 inches (460 mm). Base UMC 907.1.1 also says unlisted wall furnaces may not be installed in or attached to combustible material.

    Reference: NMAC 14.9.2.17; 2021 Uniform Mechanical Code, Section 907.2

  10. May a manually operated damper be installed in a combustion air opening under 2021 UMC 701.12?

    Answer: No

    Section 701.12 states that manually operated dampers shall not be installed in combustion air openings. With prior approval, power-actuated louvers may be used if interlocked with the main burner fuel valve so fuel cannot flow unless the louvers are proven open.

    Reference: 2021 Uniform Mechanical Code, Section 701.12

Sources

Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.