New Jersey licensing exam

New Jersey HVACR Contractor Exam: Practice Test & Licensing Guide

The PSI trade exam for a New Jersey HVACR contractor license: 50 questions on heating and cooling, refrigerants, piping, fuel gas, venting, ducts and load calculations. Open book, 70% to pass.

Questions
50
Time limit
2.1666666666666665 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Combustion Air, Chimneys, Flues and Vents

A furnace rated 80,000 Btu/h input and a water heater rated 40,000 Btu/h input share one room that will draw all its combustion air from inside the building. Using the standard method, what minimum volume of indoor air is required?

Requirements at a glance

AgencyState Board of Examiners of Heating, Ventilating, Air Conditioning and Refrigeration Contractors (Division of Consumer Affairs); exams by PSI
EligibilityAge 21 plus the education and experience in N.J.A.C. 13:32A-2.2
ExamsHVACR Trade, plus Business and Law
Fees$84 to PSI (Business and Law is $47), plus Board application and license fees

Candidates for a New Jersey heating, ventilating, air conditioning and refrigeration contractor license from the State Board of Examiners of Heating, Ventilating, Air Conditioning and Refrigeration Contractors.

How to get licensed, step by step

  1. Apply to the board

    Get the Board's approval to test. It sends an Examination Eligibility Notice with instructions for paying and scheduling.

    New Jersey Division of Consumer Affairs: professional boards (opens in a new tab)

  2. Schedule the HVACR exam and Business and Law with PSI

    Pay and schedule with PSI online or at (855) 340-3713. First-time candidates take all required exams on the same day. Fees are not refundable or transferable and are valid for one year.

    Schedule with PSI (NJ HVACR) (opens in a new tab)

  3. Retake if needed

    Retake only the exams you failed, after the waiting period your board sets (6 months between attempts for most boards). Check your Eligibility Notice for the exact limits.

    Schedule with PSI (NJ HVACR) (opens in a new tab)

  4. Get licensed

    PSI sends your results to the board. Contact the board for the license application, fees and insurance requirements.

    New Jersey Division of Consumer Affairs: professional boards (opens in a new tab)

How to prepare

  • Bring the exact editions on PSI's outline, and check the bulletin again before test day. New Jersey adopted newer codes in August 2026, but the exam bulletins still name the 2023 NEC, the 2021 National Standard Plumbing Code and the 2021 IMC and IFGC.
  • First-time candidates take all required exams on the same day, so practice the trade exam and Business and Law together.
  • You can highlight, underline and index books you bring, but not write in them. The 2023 NEC is provided at the electrical and alarm test centers.
  • Tab the IMC and IFGC chapters on equipment, venting and combustion air, and the gas pipe sizing tables.
  • Manual J and a ductulator are allowed: practice load calculations and duct sizing with them.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Mechanical Code (IMC), 2021 Edition (the 2018 edition stopped being allowed on 6/13/2024)
  • International Fuel Gas Code (IFGC), 2021 Edition (the 2018 edition stopped being allowed on 6/13/2024)
  • Manual J: Residential Load Calculation, reprinted 2016, ACCA
  • A handheld ductulator is allowed

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Electrical Knowledge, Motors, and Controls7
Piping - Refrigeration, Hydronic, Steam, Process7
Heating and Cooling Principles, Theory, and Equipment8
Refrigerants and Refrigeration8
Fuel and LP Gas5
Combustion Air, Chimneys, Flues and Vents5
Ducts, Ventilation and Exhaust5
Load Calculations5

Exam day details

  • Administered by PSI Services for the New Jersey Division of Consumer Affairs boards.
  • Fee: $84 to PSI. Board application and license fees are separate.
  • 50 questions in 130 minutes; 35 correct (70%) to pass.
  • Code questions are based only on the listed editions of the IMC and IFGC. You bring your own copies.
  • HVACR candidates take the HVACR Trade and Business and Law exams on the same day for the first attempt. If you fail, you can retest without a limit on attempts but must wait 6 months between attempts.
  • Your board (or committee) must approve your application first and sends an Examination Eligibility Notice. Then you pay and schedule with PSI by phone at (855) 340-3713 or online.
  • Exam fees are not refundable or transferable and are valid for one year from payment.
  • References may be highlighted, underlined and indexed before the exam but not written in; loose or attached papers are not allowed. A book PSI provides at the test center can't be marked.

Frequently asked questions

What's on the New Jersey HVACR contractor exam?

50 questions: heating and cooling principles, theory and equipment 8, refrigerants and refrigeration 8, electrical knowledge, motors and controls 7, piping 7, fuel and LP gas 5, combustion air, chimneys, flues and vents 5, ducts, ventilation and exhaust 5 and load calculations 5.

Which code editions are on the exam?

The 2021 IMC and 2021 IFGC, plus Manual J (reprinted 2016). The 2018 editions are no longer allowed.

Can I use a calculator or ductulator?

A handheld ductulator is allowed in the exam center, and PSI provides an online calculator on screen.

Free questions with answers

Show all 10 free questions and answers
  1. A furnace rated 80,000 Btu/h input and a water heater rated 40,000 Btu/h input share one room that will draw all its combustion air from inside the building. Using the standard method, what minimum volume of indoor air is required?

    Answer: 6,000 cubic feet

    The standard method requires 50 cubic feet per 1,000 Btu/h of the input of all appliances in the space. Total input is 80,000 + 40,000 = 120,000 Btu/h, so 120 x 50 = 6,000 cubic feet. 2,400 comes from dividing by 50, and 12,000 doubles the factor to 100.

    Reference: 2021 International Fuel Gas Code (NJ UCC Fuel Gas Subcode), 304.5.1

  2. Where must the shutoff valve for a gas appliance be located relative to the appliance?

    Answer: In the same room, within 6 feet, and upstream of the union or connector

    The appliance shutoff must be in the same room, within 6 feet of the appliance, upstream of the union, connector or quick disconnect, and accessible. Section 409.1.2 also bans shutoff valves in concealed locations and furnace plenums.

    Reference: 2021 International Fuel Gas Code (NJ UCC Fuel Gas Subcode), 409.5.1

  3. Which of the following is prohibited on a domestic clothes dryer exhaust system?

    Answer: A screen over the duct termination

    Dryer exhaust must end outdoors with a backdraft damper, and screens must not be installed at the termination because lint clogs them. Booster fans are also prohibited in domestic dryer exhaust systems (504.6). The 3-foot clearance applies when the manufacturer does not state a location.

    Reference: 2021 International Mechanical Code (NJ UCC Mechanical Subcode), 504.4

  4. A hydronic system has a maximum design pressure of 90 psi. What is the minimum hydrostatic test pressure and minimum test duration?

    Answer: 135 psi for 15 minutes

    1.5 x 90 = 135 psi, which is above the 100 psi minimum, so 135 psi governs. The test lasts not less than 15 minutes. 100 psi uses only the floor, 180 psi doubles the design pressure, and the code does not require a 60-minute hydronic test.

    Reference: 2021 International Mechanical Code (NJ UCC Mechanical Subcode), 1208.1

  5. A technician measures a suction line temperature of 52 degrees F at the evaporator outlet. The saturation temperature for the measured suction pressure is 40 degrees F. What is the superheat?

    Answer: 12 degrees F

    Superheat = actual suction line temperature minus the saturation temperature at suction pressure: 52 - 40 = 12 degrees F. Subtracting in the wrong order gives -12, and adding gives 92.

    Reference: General refrigeration practice, Superheat = line temperature minus saturation temperature

  6. A liquid line temperature is 95 degrees F and the saturation temperature for the measured liquid line pressure is 105 degrees F. What is the subcooling?

    Answer: 10 degrees F

    Subcooling = saturation temperature at condensing pressure minus actual liquid line temperature: 105 - 95 = 10 degrees F. Superheat uses the opposite subtraction order because it is measured on the suction side.

    Reference: General refrigeration practice, Subcooling = saturation temperature minus liquid line temperature

  7. An air handler is installed in an attic reached through a scuttle opening. What are the minimum passageway dimensions and maximum length (standard case)?

    Answer: 30 inches high, 22 inches wide, 20 feet long

    Section 306.3 requires an unobstructed passageway at least 30 inches high and 22 inches wide, not over 20 feet long measured along the centerline, with solid flooring at least 24 inches wide. A passageway at least 6 feet high and 22 inches wide may run up to 50 feet.

    Reference: 2021 International Mechanical Code (NJ UCC Mechanical Subcode), 306.3

  8. What minimum level service space is required at the front or service side of an appliance installed in an attic (standard case)?

    Answer: 30 inches deep by 30 inches wide

    Section 306.3 requires a level service space not less than 30 inches deep and 30 inches wide at the service side. A switch-controlled light at the passageway opening and a receptacle at the appliance are also required (306.3.1).

    Reference: 2021 International Mechanical Code (NJ UCC Mechanical Subcode), 306.3

  9. A 200-square-foot wall has these series R-values: outside film 0.17, siding 0.80, sheathing 1.32, insulation 13, drywall 0.45 and inside film 0.68. With a 50 degree F design temperature difference, what is the approximate heat loss?

    Answer: 609 Btu/h

    Total R = 0.17 + 0.80 + 1.32 + 13 + 0.45 + 0.68 = 16.42, so U = 1/16.42 = 0.0609. Q = 0.0609 x 200 x 50 = 609 Btu/h. 769 uses the insulation R-13 alone, 10,000 omits U, and 164,200 multiplies by R.

    Reference: ACCA Manual J (load calculation concepts), Series R-values and U-factor

  10. A 40 VA, 24-volt control transformer is used to power thermostat circuits. What is the maximum secondary current it can supply?

    Answer: 1.67 amperes

    Current = VA / volts = 40 / 24 = 1.67 amperes. Loads connected to the secondary (contactor, gas valve, relays) must total less than that or the transformer overheats and its fuse or breaker trips.

    Reference: General electrical practice, Transformer secondary current

Sources

Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.