The PSI trade exam for Nevada's C-21 license: 85 questions on refrigeration, load calculations, fuel gas, ducts, venting and the 2018 Uniform Mechanical Code, open book.

Questions
85
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Fuel Systems

Under 2018 UMC 1312.6, where must the manual shutoff valve for a gas furnace be located?

Requirements at a glance

AgencyNevada State Contractors Board (NSCB); exams by PSI
Experience4 years as a journeyman, foreman, supervisor or contractor in the classification within the last 15 years (up to 3 years can be education)
Exams85 questions, 3 hours, 70%, plus the Construction Management Survey (business and law)
Books allowed2018 UMC and NFPA 54 (2012)
Fees$95 per PSI exam ($140 for a trade exam plus the CMS), plus NSCB application and license fees and a bond

Qualifying individuals for a Nevada C-21 Refrigeration and Air Conditioning contractor license. Technicians who handle refrigerant also need EPA 608 certification.

How to get licensed, step by step

  1. Pick your classification

    Find the NSCB classification that covers your work, and name the qualifying individual (an owner or a qualified employee) with 4 years of experience in it.

    NSCB: License classifications (opens in a new tab)

  2. Apply to the NSCB

    Submit the application with your experience verification, financial statement and fingerprints. The Board sends you an exam eligibility notice once it accepts your qualifications.

    Nevada State Contractors Board (opens in a new tab)

  3. Schedule the CMS and C-21 trade exam with PSI

    Book both exams with PSI. Bring the allowed references, tabbed. If you fail, wait 2 weeks; you get three attempts and must pass within 6 months of filing.

    Schedule with PSI (Nevada contractors) (opens in a new tab)PSI: Nevada "C" classification bulletin and outlines (opens in a new tab)

  4. Post your bond and get licensed

    After you pass, the Board sets your monetary limit and bond amount ($1,000 to $500,000). File the bond and pay the license fee to receive your license.

How to prepare

  • Bring the exact editions on PSI's outline. Nevada's trade exams use the 2017 NEC, the 2018 IBC/IRC and the 2018 UPC/UMC; a newer book gives some wrong answers.
  • Tab your books with permanent tabs before exam day. Sticky notes are removed at check-in, and you can't write in the books.
  • OSHA 1926 isn't allowed in the room, but every trade exam has a safety section from it. Learn the common numbers (fall protection at 6 ft, ladders 3 ft above the landing, trenches 5 ft).
  • Fuel systems is the biggest section (10): practice gas pipe sizing and know combustion air and venting rules (UMC Chapters 7, 8 and 13).
  • Load calculations (6) use the sensible-heat and hydronic formulas: BTU/h = 1.08 × CFM × ΔT and BTU/h = 500 × GPM × ΔT.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 UMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • Uniform Mechanical Code (UMC), 2018, IAPMO (allowed in the exam room)
  • NFPA 54: National Fuel Gas Code, 2012 (allowed in the exam room)
  • 29 CFR Part 1926, OSHA Construction (not allowed in the room)
  • Modern Refrigeration and Air Conditioning; SMACNA HVAC Duct Construction Standards; ACCA Manual N; Evaporative Air Conditioning Handbook; FSEC solar manual (not allowed in the room)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Piping6
Insulation1
Hangers and Supports3
Sound, Vibration and Seismic Control1
Heating and Cooling Principles3
Refrigerants and Refrigeration7
Load Calculations6
Testing, Adjusting and Balancing3
Controls5
Machine Room1
A/C and Heat Pump Equipment4
Furnaces and Heaters4
Hydronics2
Chimneys, Flues and Vents5
Combustion Air2
Fuel Systems10
Ducts6
Evaporative Cooling2
Chillers3
Solar4
Ventilation and Exhausts3
Safety4

Exam day details

  • Administered by PSI Services for the Nevada State Contractors Board (NSCB).
  • Fee: $95 to PSI for one exam, $140 for a trade exam plus the CMS. NSCB application and license fees are separate.
  • 85 questions in 3 hours; 60 correct (70%) to pass.
  • Nevada's HVAC exam uses the Uniform Mechanical Code (UMC), not the IMC.
  • Open book: bring your own copies of the allowed references. You may highlight and add permanent tabs beforehand, but not write in them; sticky notes are removed.
  • PSI may add up to 10 unscored trial questions, which count against your time.
  • If you fail, wait 2 weeks to retake. You get three attempts, and you must pass within 6 months of filing your application; a third failure voids the application.
  • Every Nevada contractor license needs both the Construction Management Survey (business and law) and the trade exam for the classification, plus 4 years of experience in the last 15.

Frequently asked questions

What's on the Nevada C-21 exam?

85 questions across 22 areas. Fuel systems (10) is the biggest, then refrigerants and refrigeration (7), and piping, load calculations and ducts (6 each).

Which mechanical code does Nevada's C-21 exam use?

The 2018 Uniform Mechanical Code (UMC) and NFPA 54 (2012) for fuel gas. Bring those editions.

Do I need EPA 608 in Nevada?

Yes, federally, for anyone who handles refrigerant. It's separate from the NSCB license.

Free questions with answers

Show all 10 free questions and answers
  1. Under 2018 UMC 1312.6, where must the manual shutoff valve for a gas furnace be located?

    Answer: Accessible, within 6 ft of the furnace, upstream of the connector, with a union downstream

    UMC 1312.6 (NFPA 54 9.6.5) requires each appliance to have an accessible, approved manual shutoff valve (or listed gas convenience outlet) serving only that appliance, located within 6 ft of it, upstream of any connector, with a union or flanged connection downstream so the controls can be removed. A valve at the meter or in a distant attic does not meet the 6-ft rule. The same rule appears in UPC 1212.6.

    Reference: 2018 Uniform Mechanical Code (IAPMO), 1312.6

  2. Using 2018 UMC Table 1315.2(1) (Schedule 40, under 2 psi, 0.5 in. w.c. drop), a branch must carry 140 cfh and the longest length from the meter is 30 ft. What is the smallest pipe size?

    Answer: 3/4 in

    In Table 1315.2(1), the 30-ft row lists 95 cfh for 1/2 in, 199 cfh for 3/4 in and 374 cfh for 1 in. 1/2 in can't carry 140 cfh; 3/4 in is the smallest size that can. 1 in and 1-1/4 in would work but are larger than needed.

    Reference: 2018 Uniform Mechanical Code (IAPMO), Table 1315.2(1)

  3. A 14-in Type B gas vent passes through a roof. Under 2018 UMC 802.6.1(2), how high must it terminate?

    Answer: 2 ft above the highest point where it passes through the roof and 2 ft above any part of the building within 10 ft

    UMC 802.6.1 lets gas vents 12 inches or smaller, at least 8 ft from a vertical wall, terminate per Figure 802.6.1 and Table 802.6.1 (roof pitch). Vents over 12 inches, or closer than 8 ft to a vertical wall, must terminate at least 2 ft above the highest point where they pass through the roof and at least 2 ft above any part of the building within 10 ft horizontally. A 14-in vent falls under the second rule.

    Reference: 2018 Uniform Mechanical Code (IAPMO), 802.6.1

  4. An R-410A system serves a single 12 ft × 15 ft office with an 8-ft ceiling. Using the Table 1102.3 limit of 26 lb per 1,000 cu ft, what is the most refrigerant the circuit may hold before Section 1106.1.1 would require a machinery room (or other measures)?

    Answer: 37.4 lb

    Room volume = 12 × 15 × 8 = 1,440 cu ft. Allowable = 1,440 ÷ 1,000 × 26 lb = 37.4 lb. A circuit charge above the Table 1102.3 quantity for the smallest space it serves triggers the machinery room requirement of 1106.1.1. 26 lb ignores the room volume, and 14.4 lb is the volume in thousands of cubic feet times 10.

    Reference: 2018 Uniform Mechanical Code (IAPMO), Table 1102.3, 1106.1.1

  5. An air handler moves 1,200 cfm of standard air with a 20°F temperature difference across the coil. Using Q = 1.08 × CFM × ΔT, what is the sensible heat transferred?

    Answer: 25,920 Btu/h

    Sensible heat Q = 1.08 × CFM × ΔT = 1.08 × 1,200 × 20 = 25,920 Btu/h (about 2.2 tons). The 1.08 factor combines air density (0.075 lb/cu ft), specific heat (0.24 Btu/lb·°F) and 60 minutes per hour. 24,000 forgets the 1.08 factor.

    Reference: General trade practice, Load calculation: sensible heat formula

  6. Under 2018 UMC 603.5, how often must horizontal runs of flexible air duct be supported, and what is the maximum sag?

    Answer: Every 4 ft; sag not over 1/2 in per ft of support spacing

    UMC 603.5 requires flexible air ducts (UL 181) to be installed per the manufacturer and SMACNA, with horizontal runs supported at not more than 4-ft intervals, vertical risers at 6 ft, sag not exceeding 1/2 in per ft of support spacing, supports at least 1-1/2 in wide at the duct, bends with at least a one-diameter radius, and minimum length to make the connection.

    Reference: 2018 Uniform Mechanical Code (IAPMO), 603.5

  7. Using 2018 UMC Table 310.3, what is the minimum condensate drain size for a 30-ton rooftop unit?

    Answer: 1 in

    Table 310.3 sizes condensate waste pipe by refrigeration capacity: up to 20 tons, 3/4 in; 21–40 tons, 1 in; 41–90 tons, 1-1/4 in; 91–125 tons, 1-1/2 in; 126–250 tons, 2 in (at 1/8 in per ft, three-quarters full). 30 tons falls in the 1-inch row.

    Reference: 2018 Uniform Mechanical Code (IAPMO), Table 310.3

  8. Outdoor air in Las Vegas is 105°F dry bulb and 65°F wet bulb. A direct evaporative cooler has a saturation effectiveness of 85%. What is the approximate supply air temperature?

    Answer: 71°F

    Supply temperature = DB − effectiveness × (DB − WB) = 105 − 0.85 × (105 − 65) = 105 − 34 = 71°F. Evaporative coolers can approach, but never reach, the wet-bulb temperature (65°F). Low wet-bulb temperatures are why evaporative cooling works well in southern Nevada.

    Reference: General trade practice, Evaporative cooling: saturation effectiveness

  9. A residential 24-V control transformer is rated 40 VA. What is the maximum current it can supply to the control circuit?

    Answer: 1.67 A

    I = VA ÷ V = 40 ÷ 24 = 1.67 A. Adding contactors, zone dampers or humidifier relays beyond that rating overheats the transformer. The fuse on the control board is usually 3 or 5 A to protect the board, not the transformer's continuous rating.

    Reference: General trade practice, HVAC controls: transformer capacity

  10. Under 29 CFR 1926.350(a)(10), how must stored oxygen cylinders be separated from acetylene cylinders on a jobsite?

    Answer: By 20 ft, or a noncombustible barrier at least 5 ft high rated at least 1/2 hour

    1926.350(a)(10) requires oxygen cylinders in storage to be separated from fuel-gas cylinders and combustibles by at least 20 ft or by a noncombustible barrier at least 5 ft high with at least a 1/2-hour fire rating. HVAC brazing rigs carried between jobs must follow it when stored.

    Reference: 29 CFR Part 1926, 1926.350(a)(10)

Sources

Questions last verified October 22, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.