Requirements at a glance
| Agency | Your Nebraska city licenses you (Omaha, Lincoln, Grand Island, Kearney, Columbus and others); IAPMO gives the exam |
|---|---|
| Experience | Set by your city (Nebraska has no state plumbing license) |
| Exam | 125 multiple-choice questions, 4 hours; pass mark not published |
| Books allowed | Original, bound Uniform Plumbing Code matching the exam's code year (no loose papers or notes) |
| Fees | IAPMO exam fee (not published), plus your city's license fees |
Plumbers applying to a Nebraska city that uses the IAPMO exam, such as Grand Island or Kearney, for a master license. Your city sets the experience rules.
How to get licensed, step by step
Get your city's approval
Ask your city which exam it uses and what experience it requires. IAPMO will not let you test without approval.
IAPMO: Nebraska plumbing license testing (opens in a new tab)
Register with IAPMO
Register for the exam on IAPMO's online proctored FLEX platform. For Lincoln, email the city (pgenrich@lincoln.ne.gov) instead.
IAPMO: Nebraska plumbing license testing (opens in a new tab)
Take the exam
The exam is open book with your bound UPC. A code book from the wrong year is turned away.
IAPMO: Nebraska plumbing license testing (opens in a new tab)
Get licensed
Send your city your results and license fee.
IAPMO: Nebraska plumbing license testing (opens in a new tab)
How to prepare
- Nebraska has no state plumbing license: your city licenses you. Grand Island and Kearney test the 2021 UPC, Columbus tests the 2018 UPC with gas, and Lincoln runs its own 2018 UPC exam with amendments. Get your city's approval and confirm the code year before you buy a book.
- IAPMO only admits an original, bound UPC whose edition matches the exam's code year, with no loose papers or notes in it. Our questions follow the 2021 UPC.
- Drainage (Chapter 7) and vents (Chapter 9) are the largest areas, then water supply and distribution (Chapter 6). Tab the sizing tables.
- The master exam adds an isometric analysis section: practice counting fixture units and sizing drains and vents from a described layout.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the UPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Uniform Plumbing Code (UPC), 2021 Edition, IAPMOEssential
Open book: an original bound copy. IAPMO requires the edition to match the exam's code year: 2021 for Grand Island and Kearney, 2018 for Columbus and Lincoln.
IAPMO store (opens in a new tab)Read free: 2021 UPC (IAPMO) (opens in a new tab)
Official reference list (as published by the testing agency)
- Uniform Plumbing Code (UPC), 2021 edition for the Grand Island and Kearney exams: an original, bound copy whose edition matches the exam's code year
What's on the exam
Official content outline from IAPMO (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Chapter 3: General Regulations | 7 | |
| Chapter 4: Plumbing Fixtures and Fixture Fittings | 10 | |
| Chapter 5: Water Heaters | 7 | |
| Chapter 6: Water Supply and Distribution | 13 | |
| Chapter 7: Sanitary Drainage | 22 | |
| Chapter 8: Indirect Wastes | 7 | |
| Chapter 9: Vents | 22 | |
| Chapter 10: Traps and Interceptors | 6 | |
| Chapter 11: Storm Drainage | 12 | |
| Chapter 12: Fuel Gas Piping | 9 | |
| Isometric Analysis | 10 |
Exam day details
- Administered by IAPMO for Nebraska cities (Grand Island, Kearney and others).
- Fee: Paid to IAPMO when you register (amount not published). Your city's license fees are separate.
- 125 multiple-choice questions in 4 hours (240 minutes).
- Open book: only an original, bound UPC (no photocopies) whose edition matches the exam's code year. Loose papers or notes in the book end the exam and are reported.
- Online proctored on IAPMO's FLEX platform. You need your city's approval before you register; IAPMO does not print the exam fee or pass mark.
- Nebraska has no state plumbing license. Cities such as Omaha, Lincoln, Grand Island, Kearney and Columbus license plumbers. Grand Island and Kearney use the 2021 UPC; Columbus tests the 2018 UPC with gas, and Lincoln runs its own 2018 UPC exam with amendments. Our questions follow the 2021 UPC.
Note: IAPMO does not publish the pass mark or fee, and Nebraska cities may amend the UPC.
Frequently asked questions
What's on the Nebraska master plumber exam?
125 questions from the 2021 UPC: drainage (Chapter 7) and vents (Chapter 9) 22 each, water supply and distribution 13, storm drainage 12, isometric analysis 10, fixtures 10, Chapter 12 9, general regulations 7, water heaters 7, indirect wastes 7 and traps and interceptors 6.
How long is the master exam?
4 hours for 125 questions, one hour longer than the journeyman exam.
Free questions with answers
Show all 10 free questions and answers
A building drain of a material approved only for use outside the building is to enter the structure. Under the 2021 UPC, how close to the building and how shallow may such piping be installed?
Answer: no closer than 2 feet to the building and no shallower than 1 foot
Section 312.3 forbids installing building sewer or drainage piping of materials not approved for use under or within a building under or within 2 feet of a building, or less than 1 foot below the ground surface. The distractors swap or alter the two distances.
Reference: 2021 Uniform Plumbing Code, Section 312.3
A site-built shower compartment is framed with a finished interior measuring 30 inches by 30 inches at the top of the threshold. Under the 2021 UPC, this compartment:
Answer: does not comply, because its area is only 900 square inches
Section 408.6 requires a finished interior of at least 1024 square inches that can also encompass a 30 inch circle, measured at the top of the threshold. 30 in x 30 in = 900 sq in, which is below 1024 even though the 30 inch circle fits.
Reference: 2021 Uniform Plumbing Code, Section 408.6
A fuel-burning storage water heater that is not direct-vent will be placed in a closet inside a bathroom. Which condition does the 2021 UPC require for this closet?
Answer: a listed gasketed self-closing door, outdoor combustion air, and exclusive use of the closet
Section 504.1 allows a fuel-burning water heater in a bedroom or bathroom closet only if the closet has a listed, gasketed, self-closing door with threshold and bottom seal, takes combustion air from outdoors per Section 506.4, and is for the exclusive use of the water heater. Section 504.1.1 forbids a hold-open feature.
Reference: 2021 Uniform Plumbing Code, Section 504.1
The discharge pipe from a temperature and pressure relief valve terminates outside the building above the ground. Where must the end of the pipe be located under the 2021 UPC?
Answer: not less than 6 inches and not more than 2 feet above the ground, pointing downward
Section 608.5(3) allows discharge by gravity through an air gap into the drainage system or outside the building with the pipe end not exceeding 2 feet and not less than 6 inches above the ground, pointing downward. The pipe must have no valves or isolation and may not be trapped or subject to freezing.
Reference: 2021 Uniform Plumbing Code, Section 608.5
A 4-inch horizontal building drain runs 60 feet at the standard slope. How much total drop does the 2021 UPC require over the run?
Answer: 15 inches
Section 708.1 requires a uniform slope of not less than 1/4 inch per foot. 60 ft x 1/4 in/ft = 15 inches. 7.5 inches uses the 1/8 inch per foot reduced slope, which is allowed for 4 inch or larger pipe only where the standard slope is impractical and the AHJ approves.
Reference: 2021 Uniform Plumbing Code, Section 708.1
What minimum vertical distance does the 2021 UPC require for a drainage air gap, measured from the lowest point of the indirect waste pipe to the flood-level rim of the receptor?
Answer: 1 inch
Section 801.2 requires indirect waste piping to discharge through an air gap or air break, and a drainage air gap must be not less than 1 inch measured from the lowest point of the indirect waste pipe or fixture outlet to the flood-level rim of the receptor. Do not confuse this with the water-supply air gaps of Table 603.3.1.
Reference: 2021 Uniform Plumbing Code, Section 801.2
A plastic vent stack extends through the roof near a parapet wall. How far above the roof and from the vertical surface must the terminal be under the 2021 UPC?
Answer: at least 6 inches above the roof and at least 1 foot from the vertical surface
Section 906.1 requires each vent pipe or stack to terminate vertically not less than 6 inches above the roof and not less than 1 foot from a vertical surface. ABS and PVC exposed to sunlight must be protected with water-based synthetic latex paint.
Reference: 2021 Uniform Plumbing Code, Section 906.1
A 6,000 square foot roof drains to one vertical leader in an area with a 3 in/h design rainfall. Using Table 1103.1, what is the smallest leader size?
Answer: 4 inches
Table 1103.1 at 3 in/h allows 2,930 sq ft for a 3 inch leader and 6,130 sq ft for a 4 inch leader. 6,000 sq ft exceeds 2,930 and is below 6,130, so 4 inches is the smallest size permitted.
Reference: 2021 Uniform Plumbing Code, Table 1103.1
A newly installed threaded (not welded) gas piping system will carry natural gas at 0.25 psi, which is under 14 inches water column. What pressure test does Section 1213.3 require?
Answer: at least 10 psi gauge, held at least 15 minutes with no perceptible drop
Section 1213.3 requires a test of at least 10 psi gauge, held not less than 15 minutes with no perceptible drop. The 60 psi, 30 minute test applies to welded piping and piping carrying gas above 14 inches water column.
Reference: 2021 Uniform Plumbing Code, Section 1213.3
A drainage stack serves 8 floors. Each floor has a bathroom group of 1 water closet (3 DFU), 2 lavatories (1 DFU each), 1 bathtub (2 DFU) and 1 shower (2 DFU). Using Tables 702.1 and 703.2, what is the smallest vertical stack size?
Answer: 4 inches
Each floor is 3 + 2 + 2 + 2 = 9 DFU, so the stack carries 8 x 9 = 72 DFU. Table 703.2 allows 48 DFU on a 3 inch vertical drain (and no more than five water closets); this stack has 8 water closets, so a 4 inch stack (256 DFU) is needed.
Reference: 2021 Uniform Plumbing Code, Table 703.2
Sources
Questions last verified November 6, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.