Montana licensing exam

Montana Master Plumber Exam: Practice Test & Licensing Guide

The IAPMO written exam for a Montana master plumber license: 125 multiple-choice questions on the Uniform Plumbing Code and Board rules. Open book, 70% to pass.

Questions
125
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Administration, Definitions & Licensing Statutes

A permit for a plumbing job was issued, but no work was started. Under the 2024 UPC, after how many days from the date of the permit does it expire by limitation?

Requirements at a glance

AgencyMontana Board of Plumbers (Department of Labor and Industry); written exams by IAPMO
Experience4 years as a licensed journeyman plumber, 3 of them under a master or supervising (confirm with the Board)
Exam125 multiple-choice questions, 3 hours, 70%
Books allowedOriginal bound UPC with factory tabs, the Montana amendments for the same code year and a simple non-scientific calculator
FeesBoard application $380 (ARM 24.180.401), plus the IAPMO exam fee (not published) and license fees

Licensed journeyman plumbers applying to the Montana Board of Plumbers for a master license after four years as a journeyman, three of them under or supervising a master.

How to get licensed, step by step

  1. Apply to the Board

    Send the Board of Plumbers your application and documentation of your experience. You must have Board approval before you can register.

    Montana Board of Plumbers (opens in a new tab)Board of Plumbers: exam information (opens in a new tab)

  2. Register with IAPMO

    After approval, wait for the Friday after you are approved, then register for the exam with IAPMO. It is online proctored on IAPMO's FLEX platform.

    IAPMO: Montana plumbing license testing (opens in a new tab)

  3. Take the exam

    The exam is open book with your bound UPC and the Montana amendments. After three failed written attempts in a year you need 20 hours of continuing education before a fourth.

    Board of Plumbers: exam information (opens in a new tab)

  4. Get licensed

    Send the Board your results and license fee. Watch the proposed 2024 UPC adoption (MAR Notice 2026-95) for code changes.

    Montana Board of Plumbers (opens in a new tab)Montana DLI: MAR Notice 2026-95 (proposed 2024 UPC adoption) (opens in a new tab)

How to prepare

  • Confirm the UPC edition with IAPMO before you buy a book. The Board's sheets say 2021, Montana law adopted the 2024 UPC effective September 26, 2026, and IAPMO only admits a book that matches the exam's code year. Our questions follow the 2024 UPC with the proposed Montana amendments.
  • Your UPC must be an original bound copy with factory tabs only; no loose papers or notes. Bring the Montana amendments for the same code year and a simple non-scientific calculator.
  • Water supply sizing, drainage fixture units and vent sizing carry the most weight in our estimate. Tab the sizing tables and the Montana amendments.
  • The master exam has 125 questions in the same 3 hours, so practice your pace: about 86 seconds per question.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the UPC and the Montana amendments. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • Uniform Plumbing Code (IAPMO), original bound copy with factory tabs; the edition must match the exam's code year (see the edition note)
  • Montana amendments to the UPC (ARM 24.301.301) for the same code year
  • Statutes and Rules Relating to the Board of Plumbers and Building Codes
  • A simple, non-scientific calculator

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Administration, Definitions & Licensing Statutes8
Fixtures & Traps12
Water Supply & Distribution18
Sanitary Drainage18
Vents12
Indirect & Special Wastes, Interceptors6
Storm Drainage5
Gas, Medical Gas & Fire Protection References4
Installation, Testing, Inspection & Montana Amendments10
Calculations (Fixture Units, Sizing)7

Exam day details

  • Administered by IAPMO for the Montana Board of Plumbers.
  • Fee: Paid to IAPMO when you register (amount not published). Board application and license fees are separate.
  • 125 multiple-choice questions in 3 hours (180 minutes); 70% correct to pass.
  • Code edition: the Board's exam sheets and IAPMO's page (checked November 2, 2026) still say the 2021 UPC. Montana law adopted the 2024 UPC effective September 26, 2026, and the Montana amendments to it were adopted as proposed (MAR Notice 2026-95.2, effective September 26, 2026). IAPMO has not confirmed which edition it tests, so our questions follow the 2024 UPC with the adopted Montana amendments. IAPMO only admits you with a code book and amendments that match the exam's code year, so confirm the year with IAPMO (certifications@iapmo.org, 708-995-3000) before you buy a book.
  • Open book: an original, bound UPC (factory tabs only, no loose papers or notes), the Montana amendments for the same code year, and a simple non-scientific calculator. Any loose notes found during the exam end it and are reported to the Board.
  • Online proctored on IAPMO's FLEX platform. You need Board approval before you register, and the exam fee is paid to IAPMO (the amount is not published).
  • If you fail three written attempts in a year, you need 20 hours of continuing education before a fourth. Failing the fourth bars reapplication for one year.
  • IAPMO and the Board publish no topic outline or weights; they say only that the exam is based on the UPC as amended and the Board's statutes and rules. The topic weights on this page are our estimate.

Note: The tested UPC edition is unconfirmed (2021 on the Board's sheets, 2024 in law), and no topic weights are published, so our topic split is an estimate.

Frequently asked questions

What's on the Montana master plumber written exam?

125 multiple-choice questions based on the Uniform Plumbing Code as amended by Montana and the Board's statutes and rules. No official topic breakdown is published, so ours is an estimate.

Which UPC edition does the Montana plumbing exam use?

The Board and IAPMO pages checked on November 2, 2026 still say 2021. Montana adopted the 2024 UPC effective September 26, 2026. IAPMO has not confirmed which it tests, so ask IAPMO before buying a book. Our questions follow the 2024 UPC.

Free questions with answers

Show all 10 free questions and answers
  1. A permit for a plumbing job was issued, but no work was started. Under the 2024 UPC, after how many days from the date of the permit does it expire by limitation?

    Answer: 180 days

    Section 104.4.3 makes a permit null and void when the authorized work is not commenced within 180 days of issuance, or when work is suspended or abandoned for 180 days after it starts. One year is only the outer limit for the reduced-fee renewal in the same section. Note: Montana's amendment (ARM 24.301.301(11), effective 9/26/2026) leaves Section 104 in place for local jurisdictions, while the state itself enforces Title 50, chapter 60, part 5, MCA instead.

    Reference: 2024 Uniform Plumbing Code, 104.4.3

  2. A row of wall-hung urinals is being laid out in a commercial restroom. Under the 2024 UPC, what are the minimum distances from the urinal center to a side partition and between urinals, center to center?

    Answer: 12 inches to the partition and 24 inches center to center

    Section 402.5 sets urinals at not less than 12 inches from the center to a side wall or partition and not less than 24 inches center to center. The 15-inch and 30-inch values are the water closet and bidet dimensions in the same section, and are the usual wrong pairing.

    Reference: 2024 Uniform Plumbing Code, 402.5

  3. Static pressure in a building supply is 92 psi. Which combination does the 2024 UPC require?

    Answer: A pressure regulator preceded by a strainer, reducing pressure to 80 psi or less, with an expansion tank downstream

    Section 608.2 requires an approved pressure regulator preceded by an adequate strainer when static pressure exceeds 80 psi, reducing it to 80 psi or less. Regulators of 1 1/2 inches or larger need no strainer. Pipe sizing then uses 80 percent of the reduced pressure with Table 610.4, and an expansion tank is installed in the cold supply downstream of the regulator so thermal expansion cannot push pressure back above 80 psi.

    Reference: 2024 Uniform Plumbing Code, 608.2

  4. What minimum clear space is required in front of a cleanout on a 3-inch drain under Section 707.9 of the 2024 UPC?

    Answer: 24 inches by 24 inches

    Section 707.9 requires a clearance of 18 by 18 inches in front of cleanouts in piping 2 inches or smaller, and 24 by 24 inches for piping exceeding 2 inches. A 3-inch drain exceeds 2 inches, so the larger clearance applies.

    Reference: 2024 Uniform Plumbing Code, 707.9

  5. A minimum-size 3-inch vent is to run at its full permitted length from Table 703.2. What is the greatest length that may be installed in a horizontal position under Section 904.2 of the 2024 UPC?

    Answer: About 70 feet, one-third of the 212-foot table length

    Table 703.2 allows a 3-inch vent a maximum length of 212 feet. Section 904.2 says not more than one-third of the permitted length of a minimum-sized vent may be horizontal: 212 / 3 = 70.7 feet, so about 70 feet. If the vent is increased one pipe size for its entire length, the length limits no longer apply.

    Reference: 2024 Uniform Plumbing Code, 904.2 and Table 703.2

  6. A two-compartment sink, each compartment 24 inches by 24 inches by 12 inches deep, discharges to a hydromechanical grease interceptor. Using the fixture-capacity method of Section 1014.2.1 of the 2024 UPC (0.75 fill factor, 231 cubic inches per gallon, 1-minute drain period), what flow rate must be handled?

    Answer: 44.9 gpm

    Each compartment: 24 x 24 x 12 = 6,912 cubic inches; 6,912 / 231 = 29.92 gal. With the 0.75 fill factor, 29.92 x 0.75 = 22.44 gal. Two compartments: 22.44 x 2 = 44.9 gal. With a 1-minute drain period, 44.9 gal / 1 min = 44.9 gpm. Skipping the fill factor gives 59.8, and 29.9 and 22.4 each count only one compartment (without and with the fill factor).

    Reference: 2024 Uniform Plumbing Code, 1014.2.1 and Example 1014.2.1

  7. A flat roof has a horizontal projected area of 5,600 square feet and is drained by two equal vertical leaders. The design rainfall is 4 inches per hour. Using Table 1103.1 of the 2024 UPC, what is the smallest leader size?

    Answer: 4 inches

    Each leader serves 5,600 / 2 = 2,800 square feet. At 4 in/h, Table 1103.1 allows 720 sq ft for 2-inch, 2,200 sq ft for 3-inch, and 4,600 sq ft for 4-inch leaders. A 3-inch leader (2,200 sq ft) is too small for 2,800, so 4 inches is the smallest size. Using the full 5,600 sq ft on one leader would call for a 5-inch (8,650 sq ft at 4 in/h).

    Reference: 2024 Uniform Plumbing Code, 1103.1 and Table 1103.1

  8. What does the Montana amendment do with Chapter 12, Fuel Piping, of the 2024 UPC?

    Answer: Deletes it and uses the International Fuel Gas Code

    ARM 24.301.301 deletes UPC Chapter 12, Fuel Piping, and replaces it with the International Fuel Gas Code, so fuel gas piping on a Montana job is designed and installed under the IFGC rather than the UPC chapter. NFPA 54 and Appendix D are not what the amendment adopts.

    Reference: ARM 24.301.301 (adopted eff. 9/26/2026, MAR Notice 2026-95.2), ARM 24.301.301(37)

  9. Horizontal 1 1/4-inch copper water tube is suspended in a basement. Under Table 313.3 of the 2024 UPC, what is the maximum support spacing, and what is the vertical rule?

    Answer: 6 feet horizontally, and at each floor not exceeding 10 feet vertically

    Table 313.3 for copper and copper alloy: 1 1/2 inches and smaller, 6 feet horizontally; 2 inches and larger, 10 feet; vertical supports at each floor, not to exceed 10 feet. The 10-foot horizontal figure applies only from 2 inches up, and 25 feet is for vertical steel pipe.

    Reference: 2024 Uniform Plumbing Code, Table 313.3

  10. A single-family house has one 1.6 gpf gravity-tank water closet, two lavatories, one bathtub/shower combination, one kitchen sink (with a dishwasher and food waste disposer) and one clothes washer. Using Table 702.1 of the 2024 UPC (private use), what is the total drainage fixture unit load?

    Answer: 12 DFU

    Table 702.1 private values: water closet 3.0, lavatories 2 x 1.0 = 2.0, bathtub/shower 2.0, domestic kitchen sink with or without dishwasher and disposer 2.0, clothes washer 3.0. Total = 3 + 2 + 2 + 2 + 3 = 12 DFU. Adding 2 DFU for the dishwasher separately gives 14, since the kitchen sink value already includes it; omitting the clothes washer gives 9.

    Reference: 2024 Uniform Plumbing Code, Table 702.1

Sources

Questions last verified November 2, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.