Requirements at a glance
| Agency | Montana Board of Plumbers (Department of Labor and Industry); written exams by IAPMO |
|---|---|
| Experience | 5 years or 7,500 hours of plumbing experience, or a registered apprenticeship (confirm with the Board) |
| Exam | 100 multiple-choice questions, 3 hours, 70%, plus a separate practical (3 virtual diagrams, 2.5 hours) that we don't cover |
| Books allowed | Original bound UPC with factory tabs, the Montana amendments for the same code year and a simple non-scientific calculator |
| Fees | Board application $270 (ARM 24.180.401), plus the IAPMO exam fee (not published) and license fees |
Plumbers applying to the Montana Board of Plumbers for a journeyman license after documenting five years or 7,500 hours of experience, or a registered apprenticeship.
Official links
- Montana Board of Plumbers (opens in a new tab)
- Board of Plumbers: exam information (opens in a new tab)
- IAPMO: Montana plumbing license testing (opens in a new tab)
- Montana DLI: MAR Notice 2026-95 (proposed 2024 UPC adoption) (opens in a new tab)
- Montana DLI: current adopted building codes (opens in a new tab)
How to get licensed, step by step
Apply to the Board
Send the Board of Plumbers your application and documentation of your experience. You must have Board approval before you can register.
Montana Board of Plumbers (opens in a new tab)Board of Plumbers: exam information (opens in a new tab)
Register with IAPMO
After approval, wait for the Friday after you are approved, then register for the exam with IAPMO. It is online proctored on IAPMO's FLEX platform.
IAPMO: Montana plumbing license testing (opens in a new tab)
Take the exam
The exam is open book with your bound UPC and the Montana amendments. After three failed written attempts in a year you need 20 hours of continuing education before a fourth.
Get licensed
Send the Board your results and license fee. Watch the proposed 2024 UPC adoption (MAR Notice 2026-95) for code changes.
Montana Board of Plumbers (opens in a new tab)Montana DLI: MAR Notice 2026-95 (proposed 2024 UPC adoption) (opens in a new tab)
How to prepare
- Confirm the UPC edition with IAPMO before you buy a book. The Board's sheets say 2021, Montana law adopted the 2024 UPC effective September 26, 2026, and IAPMO only admits a book that matches the exam's code year. Our questions follow the 2024 UPC with the proposed Montana amendments.
- Your UPC must be an original bound copy with factory tabs only; no loose papers or notes. Bring the Montana amendments for the same code year and a simple non-scientific calculator.
- Water supply sizing, drainage fixture units and vent sizing carry the most weight in our estimate. Tab the sizing tables and the Montana amendments.
- The journeyman license also requires a practical diagram exam, which this site does not cover.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the UPC and the Montana amendments. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Uniform Plumbing Code (UPC), IAPMOEssential
Open book: an original bound copy with factory tabs. IAPMO requires the edition to match the exam's code year: the Board's sheets say 2021, Montana adopted the 2024 UPC effective September 26, 2026. Confirm with IAPMO.
IAPMO store (opens in a new tab)Read free: 2024 UPC (IAPMO) (opens in a new tab)
Montana amendments to the UPC (ARM 24.301.301)Essential
Allowed in the exam; must match the code year. The proposed 2024 amendments are in MAR Notice 2026-95.
Montana DLI: MAR Notice 2026-95 (proposed 2024 UPC adoption) (opens in a new tab)
Official reference list (as published by the testing agency)
- Uniform Plumbing Code (IAPMO), original bound copy with factory tabs; the edition must match the exam's code year (see the edition note)
- Montana amendments to the UPC (ARM 24.301.301) for the same code year
- Statutes and Rules Relating to the Board of Plumbers and Building Codes
- A simple, non-scientific calculator
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Administration, Definitions & Licensing Statutes | 8 | |
| Fixtures & Traps | 12 | |
| Water Supply & Distribution | 18 | |
| Sanitary Drainage | 18 | |
| Vents | 12 | |
| Indirect & Special Wastes, Interceptors | 6 | |
| Storm Drainage | 5 | |
| Gas, Medical Gas & Fire Protection References | 4 | |
| Installation, Testing, Inspection & Montana Amendments | 10 | |
| Calculations (Fixture Units, Sizing) | 7 |
Exam day details
- Administered by IAPMO for the Montana Board of Plumbers.
- Fee: Paid to IAPMO when you register (amount not published). Board application and license fees are separate.
- 100 multiple-choice questions in 3 hours (180 minutes); 70% correct to pass.
- Code edition: the Board's exam sheets and IAPMO's page (checked November 2, 2026) still say the 2021 UPC. Montana law adopted the 2024 UPC effective September 26, 2026, and the Montana amendments to it were adopted as proposed (MAR Notice 2026-95.2, effective September 26, 2026). IAPMO has not confirmed which edition it tests, so our questions follow the 2024 UPC with the adopted Montana amendments. IAPMO only admits you with a code book and amendments that match the exam's code year, so confirm the year with IAPMO (certifications@iapmo.org, 708-995-3000) before you buy a book.
- The journeyman license also has a separate practical exam of three virtual diagrams (2.5 hours, 70% to pass). We do not cover the practical; this practice test is for the written exam.
- Open book: an original, bound UPC (factory tabs only, no loose papers or notes), the Montana amendments for the same code year, and a simple non-scientific calculator. Any loose notes found during the exam end it and are reported to the Board.
- Online proctored on IAPMO's FLEX platform. You need Board approval before you register, and the exam fee is paid to IAPMO (the amount is not published).
- If you fail three written attempts in a year, you need 20 hours of continuing education before a fourth. Failing the fourth bars reapplication for one year.
- IAPMO and the Board publish no topic outline or weights; they say only that the exam is based on the UPC as amended and the Board's statutes and rules. The topic weights on this page are our estimate.
Note: The tested UPC edition is unconfirmed (2021 on the Board's sheets, 2024 in law), and no topic weights are published, so our topic split is an estimate.
Frequently asked questions
What's on the Montana journeyman plumber written exam?
100 multiple-choice questions based on the Uniform Plumbing Code as amended by Montana and the Board's statutes and rules. No official topic breakdown is published, so ours is an estimate.
Which UPC edition does the Montana plumbing exam use?
The Board and IAPMO pages checked on November 2, 2026 still say 2021. Montana adopted the 2024 UPC effective September 26, 2026. IAPMO has not confirmed which it tests, so ask IAPMO before buying a book. Our questions follow the 2024 UPC.
Free questions with answers
Show all 10 free questions and answers
A journeyman applicant documents experience through a master plumber's affirmation rather than an apprenticeship. What minimum aggregate experience, spread over at least five years, does the Board's checklist require?
Answer: 7,500 hours of plumbing experience
The checklist, citing 37-69-304, MCA and ARM 24.180.504, calls for 7,500 aggregate hours over not less than five years in a major phase of plumbing. A registered apprenticeship completion certificate is an alternative route. The smaller and larger totals are not the Board's figure.
Reference: Montana Board of Plumbers, Journeyman Plumber Checklist (updated 02/09/2023), Option 1, citing 37-69-304, MCA and ARM 24.180.504
A contractor asks the Montana Department of Labor and Industry for a plumbing permit on a new commercial building under state jurisdiction. When can the plumbing permit be issued?
Answer: Only after the building permit for that building has been issued
ARM 24.301.361(6) says no plumbing permit shall be issued for a building or structure under department jurisdiction until the building permit for it has been issued. The plumbing permit is therefore never ahead of the building permit.
Reference: ARM 24.301.361 Plumbing Permits (text current as of 2022 MAR p. 911), ARM 24.301.361(6)
What is the maximum flow rate of a showerhead under UPC 408.3, and at what pressure is it rated?
Answer: 2.5 gpm at 80 psi
Section 408.3 limits a showerhead to 2.5 gpm at 80 psi. The 60 psi rating is used for lavatory faucets in Section 407.2.1, and 2.2 gpm is the private lavatory faucet limit.
Reference: 2024 Uniform Plumbing Code, Section 408.3, Water Consumption
Using Table 702.1 for a private dwelling, what is the total drainage fixture unit load of two 1.6 gpf gravity-tank water closets, two lavatories, one bathtub/shower combination, one shower, one kitchen sink with a dishwasher connected to it, and one clothes washer?
Answer: 17 DFU
Private values are 3.0 per 1.6 gpf water closet (6), 1.0 per lavatory (2), 2.0 for the bath/shower combination, 2.0 for the shower, 2.0 for the kitchen sink (with or without a dishwasher or disposer) and 3.0 for the washer: 6 + 2 + 2 + 2 + 2 + 3 = 17. Adding the dishwasher again gives 19; leaving out the washer gives 14.
Reference: 2024 Uniform Plumbing Code, Table 702.1, Drainage Fixture Unit Values
Which rule applies to a pressure relief valve installed on a water heater system under UPC 608.4?
Answer: It is set at no more than 150 psi, and no shutoff valve may sit between it and the system
Section 608.4 calls for an approved automatic pressure relief valve with a drain, set at not more than 150 psi, and prohibits any shutoff valve between the relief valve and the system. Section 504.6 repeats the no-shutoff-valve rule for water heaters.
Reference: 2024 Uniform Plumbing Code, Section 608.4, Pressure Relief Valves
Under UPC 707.9, what is the minimum clearance in front of a cleanout on a 3-inch drain?
Answer: 24 inches by 24 inches
Section 707.9 requires 18 by 18 inches in front of cleanouts on pipe 2 inches or smaller and 24 by 24 inches for pipe over 2 inches. A 3-inch drain falls in the larger group.
Reference: 2024 Uniform Plumbing Code, Section 707.9, Clearance
Where frost or snow closure is likely, Montana's amended UPC 906.7 makes a vent terminal larger. What are the requirements?
Answer: At least 3 inches in diameter, with the size change at least 1 foot below the roof inside
For locations with a minimum design temperature below zero degrees F, vent terminals must be at least 3 inches in diameter and never smaller than the required vent pipe. The diameter change is made inside the building at least 1 foot below the roof, and the terminal ends at least 12 inches above the roof (or as required by the administrative authority).
Reference: 2024 Uniform Plumbing Code as amended by ARM 24.301.301 (adopted eff. 9/26/2026, MAR Notice 2026-95.2), ARM 24.301.301, amendment to Subsection 906.7, Frost or Snow Closure
Montana amends UPC 704.3 on commercial sinks. When may a three-compartment warewashing sink have a direct connection to the sewerage system?
Answer: When used only as wash, rinse and sanitizing bins
Montana's 704.3 bars a direct connection between the sewerage system and drains from equipment in which food or utensils are placed, with an exception for a three-compartment warewashing sink used only as a wash bin, rinse bin and sanitizing bin. Using the sanitizing bin for produce or other food preparation removes the exception and requires an indirect connection.
Reference: 2024 Uniform Plumbing Code as amended by ARM 24.301.301 (adopted eff. 9/26/2026, MAR Notice 2026-95.2), ARM 24.301.301, amendment to Subsection 704.3, Commercial Sinks
A storm drain is connected to a combined sewer. What does UPC 1101.15 require of the leaders and storm drains?
Answer: They must be trapped
Section 1101.15 requires leaders and storm drains connected to a combined sewer to be trapped, and floor and area drains connected to a storm drain to be trapped. Under Section 1101.15.1, leaders connected to a sewer carrying storm water exclusively need no trap.
Reference: 2024 Uniform Plumbing Code, Section 1101.15, Traps on Storm Drains and Leaders
How does Montana's amendment in ARM 24.301.301 treat UPC Chapter 12, Fuel Gas Piping?
Answer: It deletes the chapter and replaces it with the International Fuel Gas Code
The Montana amendment states that Chapter 12, Fuel Piping, is deleted and replaced with the International Fuel Gas Code. A Montana plumber sizing or installing gas piping therefore uses the IFGC rather than the UPC chapter.
Reference: 2024 Uniform Plumbing Code as amended by ARM 24.301.301 (adopted eff. 9/26/2026, MAR Notice 2026-95.2), ARM 24.301.301, amendment to Chapter 12
Sources
- Montana Board of Plumbers: exam information (opens in a new tab)
- IAPMO: Montana plumbing license testing (opens in a new tab)
- Montana Administrative Register: MAR Notice 2026-95.2, adoption of the 2024 UPC amendments (effective 9/26/2026) (opens in a new tab)
- Montana Board of Plumbers (opens in a new tab)
- Montana DLI: current adopted building codes (opens in a new tab)
Questions last verified November 2, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.