The Prov exam for Maine's master plumber license: 100 questions in 3 hours, weighted toward drainage, waste and venting, water supply, regulations and general knowledge. 75% to pass.

Questions
100
Time limit
3 hours
Passing score
75%
Books
Not published by Maine
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Knowledge

A person who was ordered by the Plumbers' Examining Board itself to correct a plumbing deficiency wants to appeal to Superior Court under Rule 80B. By when must the petition for review be filed?

Requirements at a glance

AgencyPlumbers' Examining Board; exam by Prov
Exam100 questions, 3 hours, 75% to pass
Experience1 year and 2,000 hours as a journeyman plumber, or 4 years and 8,000 hours as a trainee (confirm with the board)
Books allowedNone marked open book in the bulletin; the UPC 2021, Maine Plumbing Laws and Rules 2016 and Plumbing Basics for Contractors are study only
Fees$65 to Prov; board application and license fees are separate

Plumbers applying to the Maine Plumbers' Examining Board for a master license.

How to get licensed, step by step

  1. Meet the master requirements

    Log 1 year and 2,000 hours as a journeyman, or 4 years and 8,000 hours as a trainee.

    Maine Office of Professional and Occupational Regulation (opens in a new tab)Maine Revised Statutes Title 32, Chapter 49 (plumbers) (opens in a new tab)

  2. Apply to the Plumbers' Examining Board

    The board reviews your application and approves you to test.

    Maine Office of Professional and Occupational Regulation (opens in a new tab)

  3. Schedule with Prov

    After the board approves you, book at provexam.com/scheduler (3 Maine centers, or remote through Examroom). If you fail, wait 1 day; there is no attempt limit. You can reschedule free up to 3 days ahead.

    Schedule with Prov (opens in a new tab)Prov: Maine OPOR Candidate Information Bulletin (opens in a new tab)

How to prepare

  • The pass mark is 75%, so you can miss 25 of 100.
  • General regulations (18) is nearly double its weight on the journeyman exam; study the Maine Plumbing Laws and Rules.
  • Confirm with Prov whether the plumbing tables are allowed on this exam.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • Uniform Plumbing Code, 2021 (study only)
  • Maine Plumbing Laws and Rules, 2016 (study only)
  • Plumbing Basics for Contractors, 5th Edition, 2023 (study only)

What's on the exam

Official content outline from Prov, Inc. (number of questions per topic):

TopicQuestions
General Knowledge16
General Regulations18
Water Supply Systems Including Backflow Prevention & Water Heaters18
Drainage, Waste, Sanitary Venting20
Plumbing Fixtures8
Traps and Interceptors6
Specialty Venting4
Indirect Waste6
Roof Drainage4

Exam day details

  • Administered by Prov, Inc. for the Maine Office of Professional and Occupational Regulation.
  • Fee: $65 to Prov. Board application and license fees are separate.
  • 100 questions in 3 hours; 75 correct (75%) to pass, higher than the other Maine trade exams.
  • Prov's page doesn't mark any reference as open book; all three listed references are study only.
  • The licensing board approves your application first; then you schedule with Prov at a Maine test center or remotely through Examroom.
  • If you fail, wait 1 day to retake. There is no limit on attempts. You can reschedule free up to 3 days before your appointment.

Note: Prov's bulletin doesn't say whether the Maine Plumbing Tables are allowed on the master exam as they are on the journeyman exam. Confirm the open-book rules with Prov.

Frequently asked questions

What's on the Maine master plumber exam?

100 questions: drainage, waste and sanitary venting 20, general regulations 18, water supply systems 18, general knowledge 16, plumbing fixtures 8, traps and interceptors 6, indirect waste 6, specialty venting 4 and roof drainage 4.

What score do I need?

75%, which is 75 of 100 questions.

Is the master plumber exam open book?

Prov's bulletin doesn't mark any reference as open book for this exam. Confirm with Prov before test day.

Free questions with answers

Show all 10 free questions and answers
  1. A person who was ordered by the Plumbers' Examining Board itself to correct a plumbing deficiency wants to appeal to Superior Court under Rule 80B. By when must the petition for review be filed?

    Answer: Within 48 hours of receipt of the board's order

    Section 3402 allows appeal of a board order to the Superior Court under M.R. Civ. P. 80B by filing a petition within 48 hours of receipt. The board's order is not stayed unless the court orders it for good cause. The 7-day period is for appealing a state inspector's order to the board.

    Reference: Maine Revised Statutes Title 32, Chapter 49, §3402

  2. Under the Maine amendment to UPC 104.1, which of these persons may apply for and obtain a plumbing permit for a new commercial building?

    Answer: A person holding a valid, current master plumber license from the board

    Maine's amended 104.1 lets only these persons apply for and obtain plumbing permits: a holder of a valid, current master plumber license (Title 32, section 3501, subsection 2-A); a person plumbing a single-family residence that is their own bona fide personal abode (Title 32, section 3302, subsection 1(C)); and a manufactured-housing dealer or mechanic licensed under 10 M.R.S. section 9022(1) or (3), only for connecting HUD-code or pre-HUD-code homes to existing water and sewage systems. Journeymen, trainees and general contractors may not pull permits.

    Reference: 02-395 C.M.R. ch. 4, § 1 (Maine plumbing installations rule adopting the 2021 UPC with amendments), 104.1 (as amended)

  3. A new potable water system is disinfected by the UPC method and the chlorine solution will stand in the pipes for 24 hours. What minimum chlorine concentration is required?

    Answer: 50 parts per million

    Section 609.10 allows filling the system with at least 50 ppm chlorine and valving it off for 24 hours, or with at least 200 ppm and leaving it 3 hours. After the contact time the system is flushed until the chlorine is at normal supply levels.

    Reference: 2021 Uniform Plumbing Code, Section 609.10

  4. Under Maine's added UPC 901.4, what must be provided in the basement of every new building?

    Answer: An accessible future vent connection

    Maine adds 901.4 (Future Vents) to chapter 9: every new building must have an accessible future vent connection in the basement. It must be drip connected, identified and labeled "Future Vent".

    Reference: 02-395 C.M.R. ch. 4, § 1 (Maine plumbing installations rule adopting the 2021 UPC with amendments), 901.4 (Maine addition)

  5. A new commercial building in Maine requires a main vent stack. How must the basement future vent connection required by UPC 901.4 be sized?

    Answer: Full size of the main vent stack

    Maine's 901.4 requires buildings that require a main vent stack to have a future vent connection full size of that stack. Buildings that do not need a main vent stack get a minimum 2 inch connection.

    Reference: 02-395 C.M.R. ch. 4, § 1 (Maine plumbing installations rule adopting the 2021 UPC with amendments), 901.4 (Maine addition)

  6. A small shop in Maine has a total occupant load of 8, including customers and employees. What does amended UPC 422.2 allow?

    Answer: One toilet facility for use by one person at a time, for both sexes

    Exception (2) to Maine's 422.2 says that in occupancies with a total occupant load of 10 or less, including customers and employees, one toilet facility designed for use by no more than one person at a time may be used by both sexes.

    Reference: 02-395 C.M.R. ch. 4, § 1 (Maine plumbing installations rule adopting the 2021 UPC with amendments), 422.2(2) (as amended)

  7. What liquid seal depth must a fixture trap have under the 2021 UPC?

    Answer: At least 2 inches but no more than 4 inches

    Section 1005.1 requires each trap to have a liquid seal of not less than 2 inches and not more than 4 inches, except where the AHJ finds a deeper seal necessary. A 6 inch seal is the sand interceptor figure.

    Reference: 2021 Uniform Plumbing Code, Section 1005.1

  8. A vertical wet vent serves one- and two-unit fixtures on one story. What limits does UPC 908.1 set?

    Answer: No more than 4 fixtures on one story and a wet vent no longer than 6 feet developed length

    Section 908.1 limits vertical wet venting to one- and two-fixture-unit fixtures serving as a vent for no more than four fixtures on the same story, with a wet vent no more than 6 feet in developed length.

    Reference: 2021 Uniform Plumbing Code, Section 908.1

  9. An indirect waste pipe is 10 feet long. What does UPC 803.3 require?

    Answer: It must be directly trapped, but the trap need not be vented

    Section 803.3 says indirect waste pipes longer than 5 feet and shorter than 15 feet must be directly trapped, and those traps need not be vented. Vents from indirect waste may not combine with a sewer-connected vent.

    Reference: 2021 Uniform Plumbing Code, Section 803.3

  10. A 4,500 square foot roof drains to a single vertical leader in an area with a 3 in/h design rainfall. Table 1103.1 gives 2,930 sq ft for a 3 inch leader and 6,130 sq ft for a 4 inch leader at 3 in/h. What is the smallest leader?

    Answer: 4 inches

    4,500 sq ft exceeds the 3 inch leader limit of 2,930 sq ft and is under the 4 inch limit of 6,130 sq ft, so a 4 inch leader is the smallest that works. A 3 inch leader is too small.

    Reference: 2021 Uniform Plumbing Code, Table 1103.1