Requirements at a glance
| Agency | Plumbers' Examining Board; exam by Prov |
|---|---|
| Exam | 80 questions, 3 hours, 70% to pass |
| Experience | 2 years and 4,000 hours as a plumber trainee under a master plumber, or 2,000 hours as a journeyman-in-training (confirm with the board) |
| Books allowed | Maine Plumbing Tables (2015 UPC), a printout from the proctor. The UPC, Maine Plumbing Laws and Rules and Plumbing Basics for Contractors are study only |
| Fees | $65 to Prov; board application and license fees are separate |
Plumbers applying to the Maine Plumbers' Examining Board for a journeyman license. You need 2 years and 4,000 hours as a trainee under a master plumber, or 2,000 hours as a journeyman-in-training.
Official links
How to get licensed, step by step
Log your experience
Log 2 years and 4,000 hours as a trainee under a master plumber, or 2,000 hours as a journeyman-in-training.
Maine Office of Professional and Occupational Regulation (opens in a new tab)Maine Revised Statutes Title 32, Chapter 49 (plumbers) (opens in a new tab)
Apply to the Plumbers' Examining Board
The board reviews your application and approves you to test.
Maine Office of Professional and Occupational Regulation (opens in a new tab)
Schedule with Prov
After the board approves you, book at provexam.com/scheduler (3 Maine centers, or remote through Examroom). If you fail, wait 1 day; there is no attempt limit. You can reschedule free up to 3 days ahead.
Schedule with Prov (opens in a new tab)Prov: Maine OPOR Candidate Information Bulletin (opens in a new tab)
How to prepare
- You can't bring a UPC into the room, so learn the code well enough to answer from memory and from the tables.
- Drainage, waste and venting (18) and water supply (16) are 34 of 80 questions.
- Maine adopts the 2021 UPC with amendments, but the open-book tables are labeled 2015 UPC. Ask Prov which applies.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2021 UPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2021 Uniform Plumbing Code (UPC), IAPMOEssential
Study only on the plumber exams (not allowed in the room). Maine adopts it with amendments.
IAPMO (opens in a new tab)Read free (IAPMO ePubs) (opens in a new tab)
Plumbing Basics for Contractors, 5th Edition (2023)
Listed by Prov as study only for the plumber exams.
Official reference list (as published by the testing agency)
- Maine Plumbing Tables, 2015 UPC (open book; the proctor supplies a printout and you can't bring your own)
- Uniform Plumbing Code, 2021 (study only)
- Maine Plumbing Laws and Rules, 2016 (study only)
- Plumbing Basics for Contractors, 5th Edition, 2023 (study only)
What's on the exam
Official content outline from Prov, Inc. (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Knowledge | 15 | |
| General Regulations | 10 | |
| Water Supply Systems Including Backflow Prevention & Water Heaters | 16 | |
| Drainage, Waste, Sanitary Venting | 18 | |
| Plumbing Fixtures | 5 | |
| Traps and Interceptors | 5 | |
| Specialty Venting | 3 | |
| Indirect Waste | 3 | |
| Roof Drainage | 5 |
Exam day details
- Administered by Prov, Inc. for the Maine Office of Professional and Occupational Regulation.
- Fee: $65 to Prov. Board application and license fees are separate.
- 80 questions in 3 hours; 56 correct (70%) to pass.
- The only open-book item is the Maine Plumbing Tables, a printout the proctor gives you. The UPC, Maine Plumbing Laws and Rules and Plumbing Basics for Contractors are for study only.
- The licensing board approves your application first; then you schedule with Prov at a Maine test center or remotely through Examroom.
- If you fail, wait 1 day to retake. There is no limit on attempts. You can reschedule free up to 3 days before your appointment.
Note: The open-book Maine Plumbing Tables are listed as based on the 2015 UPC, while Maine's rules adopt the 2021 UPC. The tables are a proctor printout that isn't public, so check the current Prov bulletin.
Frequently asked questions
What's on the Maine journeyman plumber exam?
80 questions: drainage, waste and sanitary venting 18, water supply systems including backflow prevention and water heaters 16, general knowledge 15, general regulations 10, plumbing fixtures 5, traps and interceptors 5, roof drainage 5, specialty venting 3 and indirect waste 3.
Can I bring my UPC to the Maine plumber exam?
No. Prov lists the UPC 2021 as study only. The Maine Plumbing Tables are the only open-book reference, and the proctor provides them.
Which code does Maine plumbing follow?
The 2021 Uniform Plumbing Code with Maine amendments (Plumbers' Examining Board Rule ch. 4).
Free questions with answers
Show all 10 free questions and answers
A plumber calls for a rough-in inspection although half of the drain piping has not been installed. According to Maine's amended UPC 105.2.6, which statement is correct?
Answer: A reinspection fee may be assessed because the work was called in before it was ready
Section 105.2.6 permits a fee where the portion of work called for is not complete or corrections have not been made. It is not meant to charge a fee the first time a ready job is rejected for code violations, but it does control calling for inspections before the job is ready. Missing plans or no access on the inspection date are separate grounds.
Reference: Maine Plumbing Rules, 02-395 C.M.R. ch. 4, § 1 (2021 UPC as amended), 105.2.6 (Reinspections)
A plumber wants to save a trench by tying a new floor drain's waste line into the closet bend of a water closet. Under the 2021 UPC this connection is:
Answer: Prohibited; no waste connects to a closet bend or stub
UPC 310.3 prohibits any waste connection to a closet bend or stub, to protect the water closet from backups and the drain from interference. Neither a small pipe size nor a cleanout creates an exception.
Reference: 2021 Uniform Plumbing Code, 310.3
A horizontal drain makes two 90 degree changes of direction in the same turning direction, with no cleanout between the turns. Under UPC 707.4, what is needed?
Answer: An added cleanout, since the total change exceeds 135 degrees
UPC 707.4 requires a cleanout wherever the aggregate horizontal change of direction exceeds 135 degrees. Two 90 degree turns total 180 degrees, so the run needs another cleanout. The 100 feet figure is the separate spacing limit for straight runs.
Reference: 2021 Uniform Plumbing Code, 707.4
After accounting for friction and other losses, a water main leaves only 11 psi of residual pressure at a building. What does UPC 608.1 require?
Answer: A tank and pump or other means providing at least 15 psi
UPC 608.1 requires the supply system to deliver at least 15 psi residual pressure after losses, unless a fixture needs more. Below that, a booster arrangement such as a tank and pump is required.
Reference: 2021 Uniform Plumbing Code, 608.1
A circuit-vented horizontal branch serves four water closets and connects to a stack that also takes waste from upper-floor branches. What extra vent does UPC 911.3 require?
Answer: A 2 inch relief vent connected to the horizontal branch
Where a circuit-vented branch receives upper-floor waste via a stack and serves four or more water closets, a relief vent is required to carry air during peak flow. The code sets it at 2 inches.
Reference: 2021 Uniform Plumbing Code, 911.3
What is the maximum support spacing for horizontal Schedule 40 PVC DWV piping under UPC Table 313.3?
Answer: 4 feet for all sizes
Table 313.3 lists 4 feet as the maximum horizontal hanger spacing for plastic DWV pipe, closer than steel or cast iron pipe because plastic sags.
Reference: 2021 Uniform Plumbing Code, Table 313.3
A floor-mounted water closet is being roughed in beside a framed side wall. What is the minimum distance from the centerline of the water closet to the wall under UPC 402.5?
Answer: 15 inches
UPC 402.5 requires at least 15 inches from the center of a water closet to a side wall or obstruction, and 30 inches center to center from an adjacent fixture.
Reference: 2021 Uniform Plumbing Code, 402.5
What range of liquid seal depth must a fixture trap have under UPC 1005.1, unless the authority requires deeper?
Answer: At least 2 inches and not more than 4 inches
UPC 1005.1 requires a seal of not less than 2 inches and not more than 4 inches. Too deep a seal causes slow drainage and too shallow a seal is easily lost to siphonage or evaporation.
Reference: 2021 Uniform Plumbing Code, 1005.1
A clothes washer standpipe receptor is being installed. What is the allowed height of the standpipe above its trap weir under UPC 804.1?
Answer: At least 18 inches and not more than 30 inches
UPC 804.1 requires a standpipe at least 18 inches and no more than 30 inches above the trap weir, so washer discharge cannot overflow and the trap seal is not siphoned.
Reference: 2021 Uniform Plumbing Code, 804.1
A roof in an area with a design rainfall rate of 2.3 inches per hour, a rate not listed in Table 1103.1, is drained by a 4 inch vertical leader. Using the table note for unlisted rates, what is the most roof area that leader may serve?
Answer: 8,000 square feet
Note 2 to UPC Table 1103.1 says to divide the area in the 1 inch per hour column by the desired rainfall rate. A 4 inch leader is rated 18,400 square feet at 1 inch per hour: 18,400 / 2.3 = 8,000 square feet. 9,200 is the listed 2 inch per hour value (not conservative for 2.3), 4,600 is the 4 inch per hour value, and 42,320 comes from multiplying instead of dividing.
Reference: 2021 Uniform Plumbing Code, Table 1103.1, note 2
Sources
- Prov: Maine OPOR Candidate Information Bulletin (v1.1, November 9, 2026) (opens in a new tab)
- Maine Office of Professional and Occupational Regulation (opens in a new tab)
- Maine Revised Statutes Title 32, Chapter 49 (plumbers) (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.