Maine licensing exam

Maine Master Oil Burner Technician Exam (Up to 15 GPH): Practice Test & Licensing Guide

The Prov exam for the Maine Fuel Board's master oil burner technician license (1 and 2 oils, up to 15 gph): 105 open-book questions in 3 hours on the Oil Heat Tech Manual, NFPA 31 and Maine Fuel Board laws and rules. 70% to pass.

Questions
105
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Maine Fuel Board Laws & Rules

A journeyman oil burner technician applies for a master oil burner license. What licensed practical experience does the Maine Fuel Board statute require?

Requirements at a glance

AgencyMaine Fuel Board; exam by Prov
Exam105 questions (5 unscored pilot items), 3 hours, open book, 70% to pass
ScopeInstalling and servicing oil-burning equipment, 1 and 2 oils, up to 15 gph
Experience4 years of licensed experience, at least 2 of them as a journeyman (confirm with the Fuel Board)
Fees$90 to Prov; Fuel Board application and license fees are separate

Technicians who install or service oil-burning equipment up to 15 gph in their own business and apply to the Maine Fuel Board for a master license. Master oil burner licenses need 4 years of experience, 2 of them as a journeyman.

How to get licensed, step by step

  1. Complete the Fuel Board training

    The Fuel Board approves online training for oil burner technicians and requires 4 years of licensed experience for a master license.

    Maine Fuel Board (opens in a new tab)Maine Revised Statutes Title 32, Chapter 139 (Maine Fuel Board) (opens in a new tab)

  2. Apply to the Maine Fuel Board

    The board reviews your application and approves you to test.

    Maine Fuel Board (opens in a new tab)

  3. Schedule with Prov

    After the board approves you, book at provexam.com/scheduler (3 Maine centers, or remote through Examroom). If you fail, wait 1 day; there is no attempt limit. You can reschedule free up to 3 days ahead.

    Schedule with Prov (opens in a new tab)Prov: Maine OPOR Candidate Information Bulletin (opens in a new tab)

How to prepare

  • NFPA 31 (35) and the Maine Fuel Board Laws & Rules (31) are 66 of 105 questions; tab both.
  • Bring the Fuel Board Memorandums of Understanding; Prov lists them as open book.
  • Study the 2020 NFPA 31 and 2022 NORA manual the bulletin names, not older editions.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from NFPA 31. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • NFPA 31: Standard for the Installation of Oil-Burning Equipment (2020)Essential

    Allowed in the exam room. 35 of the 105 questions.

    NFPA (opens in a new tab)

  • NORA Technicians Manual for Liquid Heating Fuels (2022)

    Allowed in the exam room. The Oil Heat Tech Manual questions (19) come from it.

Official reference list (as published by the testing agency)
  • NORA Technicians Manual for Liquid Heating Fuels, 2022 (open book)
  • NFPA 31 Standard for the Installation of Oil-Burning Equipment, 2020 (open book)
  • Maine Fuel Board Laws and Rules, 2023, and the Fuel Board Memorandums of Understanding (open book)
  • Uniform Plumbing Code, 2021 (open book)
  • NFPA 211, 2019; NFPA 30A, 2021; NFPA 88A, 2019; NFPA 90B, 2021 (open book)

What's on the exam

Official content outline from Prov, Inc. (number of questions per topic):

TopicQuestions
Oil Heat Tech Manual19
NFPA 3135
Maine Fuel Board Laws & Rules31
Uniform Plumbing Code5
NFPA 703
NFPA 2113
NFPA 90A or 90B3
NFPA 30A2
NFPA 88A2
General Knowledge2

Exam day details

  • Administered by Prov, Inc. for the Maine Fuel Board (Office of Professional and Occupational Regulation).
  • Fee: $90 to Prov. Fuel Board application and license fees are separate.
  • 105 questions in 3 hours, including 5 unscored pilot items. 70% to pass.
  • Open book: the references above are permitted in the exam room.
  • The NFPA 70 questions come from the NEC; Prov's list for this exam doesn't print a NEC edition in the book list.
  • The licensing board approves your application first; then you schedule with Prov at a Maine test center or remotely through Examroom.
  • If you fail, wait 1 day to retake. There is no limit on attempts. You can reschedule free up to 3 days before your appointment.

Frequently asked questions

What's on the Maine master oil burner exam?

105 questions: NFPA 31 35, Maine Fuel Board laws and rules 31, Oil Heat Tech Manual 19, Uniform Plumbing Code 5, NFPA 70 3, NFPA 211 3, NFPA 90A or 90B 3, NFPA 30A 2, NFPA 88A 2 and general knowledge 2.

Is this the exam for oil burners over 15 gph?

No. Prov has separate exams for over 15 gph and for 4, 5 and 6 oils. This one covers 1 and 2 oils up to 15 gph.

Is the exam open book?

Yes. Prov marks every listed reference open book, including NFPA 31 (2020) and the NORA Technicians Manual (2022).

Free questions with answers

Show all 10 free questions and answers
  1. A journeyman oil burner technician applies for a master oil burner license. What licensed practical experience does the Maine Fuel Board statute require?

    Answer: 4 years as apprentice or journeyman, at least 2 of them as a journeyman

    Title 32 MRSA 18132(2)(A) requires 4 years of licensed practical experience as an apprentice or journeyman oil burner technician, and at least 2 of those 4 years must have been as a licensed journeyman (or other requirements the Board sets). Apprentice time can count toward the 4 years, so the "journeyman only" choice is wrong.

    Reference: Maine Revised Statutes, Title 32, Chapter 139 (Maine Fuel Board), §18132(2)(A)

  2. Under the Maine Fuel Board statute, a journeyman oil burner technician may install and service oil burning equipment under what supervision, and what must be true of the supervising master?

    Answer: Indirect supervision by a master who holds at least the same authority

    32 MRSA 18133(1)(A) lets a journeyman install, clean, service, alter or repair oil burning equipment under the indirect supervision of, or in the employ of, a master oil burner technician, and the supervising or employing master must hold at least the same authority as the journeyman. Direct supervision is the apprentice standard.

    Reference: Maine Revised Statutes, Title 32, Chapter 139 (Maine Fuel Board), §18133(1)(A)

  3. The manufacturer's instructions for an oil burner call for a configuration the installer considers unworkable on site. What does NFPA 31 require before the installer changes or modifies them?

    Answer: Written approval from the manufacturer before making the change

    NFPA 31 4.3.2 requires installation in accordance with the manufacturer's instructions and all federal, state and local rules. If it becomes necessary to change, modify or alter the instructions in any way, written approval must be obtained from the manufacturer first. The instructions are also to be left with the owner. Section numbers here are from the 2001 edition; the 2020 edition Maine adopts may number them differently.

    Reference: NFPA 31, Standard for the Installation of Oil-Burning Equipment (Maine adopts the 2020 ed.; requirement read in the 2001 ed. because the 2020 text is not publicly available; long-standing provision), 4.3.2 (2001 ed.) Installation of Oil-Burning Appliances and Equipment

  4. A furnace room next to an outside wall gets combustion air by natural ventilation through one permanent inlet. The burner fires 0.75 gal/h. What minimum free area does NFPA 31 5.5.1 require?

    Answer: 35 in.2

    NFPA 31 5.5.1 requires a permanent inlet of not less than 1 in.2 per 4,000 Btu/hr (35 in.2 per gal/hr) of burner input, but in no case less than 35 in.2. 0.75 x 35 = 26.25 in.2, which is below the floor, so 35 in.2 governs. Section numbers here are from the 2001 edition; the 2020 edition Maine adopts may number them differently.

    Reference: NFPA 31, Standard for the Installation of Oil-Burning Equipment (Maine adopts the 2020 ed.; requirement read in the 2001 ed. because the 2020 text is not publicly available; long-standing provision), 5.5.1 (2001 ed.) Combustion Air for Commercial and Industrial Installations

  5. At what pump pressure do nozzle manufacturers calibrate and stamp the rated flow (gph) on a nozzle?

    Answer: 100 psig

    Beckett's AF/AFG manual states that nozzle manufacturers calibrate nozzle flow rates at 100 psig. At a higher pump pressure the actual flow is greater than the number stamped on the nozzle body, and at a lower pressure it is less.

    Reference: R. W. Beckett AF / AFG Burner Manual (flame retention oil burner), Prepare the Burner: Nozzle and Pump Pressure

  6. Using the nozzle flow table, a 0.75 gph nozzle (rated at 100 psig) is run at a pump pressure of 150 psi on No. 2 fuel oil. What is the approximate actual flow?

    Answer: 0.92 gph

    Figure 6, Nozzle Flow Rate by Size, lists a 0.75 nozzle at 0.84 gph at 125 psi, 0.89 at 140, 0.92 at 150, 0.99 at 175 and 1.06 at 200. At 150 psi it flows about 0.92 gph. Flow rises with the square root of pressure: 0.75 x sqrt(1.5) = 0.92.

    Reference: R. W. Beckett AF / AFG Burner Manual (flame retention oil burner), Figure 6. Nozzle Flow Rate by Size

  7. What minimum capacity must the temperature, pressure and vacuum relief device on a water heater have under UPC 504.6?

    Answer: Discharge capacity not less than the heater's input rating

    UPC 504.6: the hourly Btu discharge capacity or the rated steam relief capacity of the device shall be not less than the input rating of the water heater. A relief valve smaller than the input rating cannot dump heat as fast as the burner makes it.

    Reference: Uniform Plumbing Code (IAPMO), 2021 edition, 504.6

  8. A 120/240 volt service panelboard in a boiler room has no live or grounded parts on the opposite side of the work space. What minimum clear depth of working space is required in front of it?

    Answer: 3 ft

    NEC 110.26(A)(1) and Table 110.26(A)(1): for 0 to 150 volts to ground, the minimum clear distance (depth) of working space in front of equipment is 3 ft for conditions 1, 2 and 3. For 151 to 600 volts it becomes 3 ft, 3-1/2 ft and 4 ft by condition. The 30 in. figure is the width, not the depth.

    Reference: NFPA 70, National Electrical Code, 2020 ed. (adopted by Maine Fuel Board Rule 02-658 ch. 6, 6.1.9; 2020 wording as quoted in IAEI Magazine, July-Aug 2020), 110.26(A)(1) Depth of Working Space; Table 110.26(A)(1)

  9. Which pair of NFPA 211 (2019) chapters does the Maine Fuel Board expressly NOT adopt?

    Answer: Chapter 11, Fireplaces, and Chapter 12, Masonry Heaters

    Rule 6.2.6.2 states that the Board does not adopt Chapter 11, Fireplaces, of NFPA 211, and 6.2.6.3 excludes Chapter 12, Masonry Heaters. Other exclusions include Chapter 15 (Inspection of Existing Chimneys), Section 13.5.2 and parts of Chapter 14 (14.2 and 14.7.2). The edition adopted is 2019.

    Reference: Maine Fuel Board Rules, 02-658 C.M.R. ch. 6, 6.2.6.2 and 6.2.6.3

  10. A boiler has a rated input of 245,000 Btu/hr. Using 140,000 Btu/hr per gal/hr for fuel oil, what nozzle firing rate at the design pressure does this represent?

    Answer: 1.75 gal/hr

    NFPA 31 (2020) 5.4.3.2 equates 1 in.2 per 5,000 Btu/hr with 28 in.2 per gal/hr, which works out to 140,000 Btu/hr per gal/hr. Firing rate = input / 140,000 Btu per gal. 245,000 / 140,000 = 1.75 gal/hr. Inverting the ratio gives 0.57, using 175,000 Btu/hr per gal/hr gives 1.40, and a misplaced decimal gives 17.5.

    Reference: NFPA 31, Standard for the Installation of Oil-Burning Equipment, 2020 ed. (wording confirmed in NFPA's published revision reports for the 2020 ed.), 5.4.3.2 (1 in.2 per 5000 Btu/hr = 28 in.2 per gal/hr)

Sources

Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.