Requirements at a glance
| Agency | Kentucky DHBC, Division of Plumbing (exam given by DHBC) |
|---|---|
| Experience | 2 years as a journeyman in the past 5 years plus 2 years under a master plumber (or an approved alternative) |
| Exam | Written and pipe-sizing drawing portions, 80% on each; question count not published |
| Reference | Kentucky State Plumbing Code (815 KAR 20), KRS 318, 815 KAR 2 |
| Fees | $150 exam, $250 license |
Applicants for a Kentucky master plumber license from the Department of Housing, Buildings and Construction.
Official links
How to get licensed, step by step
Qualify
Journeyman: 2 years as an apprentice, or an approved course plus 1 year. Master: 2 years as a journeyman in the past 5 years plus 2 years under a master plumber, or an engineer or other-state path.
815 KAR: DHBC administrative regulations (opens in a new tab)
Register for the master plumber exam
Send DHBC Form PLB-3 and the non-refundable exam fee. Exams are held in February, May, August and November at regional sites, and applications must be in 3 weeks before the exam; seats are first come, first served. Sites include Louisville (Local 502), Reidland (184), Lexington (452), Owensboro (633), Hazard CTC and Erlanger (Enzweiler).
Kentucky Department of Housing, Buildings and Construction (DHBC) (opens in a new tab)DHBC: Plumbing exam schedule (opens in a new tab)815 KAR: DHBC administrative regulations (opens in a new tab)
Pass every portion
You need the passing score on each portion (written, pipe-sizing drawing and, for journeymen, the practical). You have 1 year from your first notice to finish, and a passing score is valid for 3 years.
815 KAR: DHBC administrative regulations (opens in a new tab)
Get licensed
Send DHBC your passing results and the license fee ($60 journeyman, $250 master).
Kentucky Department of Housing, Buildings and Construction (DHBC) (opens in a new tab)
How to prepare
- Kentucky's State Plumbing Code is the set of regulations in 815 KAR 20. Read the sections on drainage, venting, water supply and fixtures.
- The written part also covers KRS Chapter 318 (plumber licensing) and 815 KAR 2.
- The master exam is more complex than the journeyman exam (815 KAR 20:030), so practise sizing from a stack, branch and fixture drawing.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from 815 KAR 20. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
815 KAR 20: Kentucky State Plumbing CodeEssential
The state plumbing code is the set of 815 KAR 20 regulations. Free to read on the legislature's site.
KRS Chapter 318: Plumbers and Plumbing
Plumber licensing statute covered by the written exam.
Official reference list (as published by the testing agency)
- Kentucky State Plumbing Code (815 KAR 20)
- Kentucky Revised Statutes Chapter 318 (plumbers)
- 815 KAR 2 (plumbing licensing and administration)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Basic Principles of Plumbing | 20 | |
| Kentucky Plumbing Law (KRS 318) | 15 | |
| Plumbing Administration (815 KAR 2) | 10 | |
| Kentucky State Plumbing Code (815 KAR 20) | 35 | |
| Pipe Sizing from Drawings | 20 |
Exam day details
- Administered by Kentucky Department of Housing, Buildings and Construction (Division of Plumbing).
- Fee: $150 non-refundable to DHBC per exam; license fee $250 (815 KAR 20:030).
- Written questions on basic principles of plumbing, KRS Chapter 318, 815 KAR 2 and 815 KAR 20, plus a drawing where you insert the proper pipe size for the stacks, branches and fixtures shown (815 KAR 20:030).
- You need 80% on each portion. A passing score is valid for 3 years, and you must pass within 1 year of your first notice of examination.
- Exams are held in February, May, August and November at union training centers and colleges (Louisville, Reidland, Lexington, Owensboro, Hazard, Erlanger). Applications are due 3 weeks ahead and seats are first come, first served.
- Master license: 2 years as a journeyman in the past 5 years plus 2 years under a master plumber, or an engineer or other-state path. License fee $250.
Note: DHBC publishes no question count, time limit, reference list or topic weights for the plumbing exams, and does not say whether they are open book. The question count, time and open-book setting here are our practice values, and the topic weights are our estimate from 815 KAR 20:030; the pass scores, fees and schedule are from that regulation, form PLB-3 and the DHBC exam schedule (docs/sources/kentucky/gap/plb-schedule2.txt). Ask DHBC Plumbing at 502-573-0397 for the exam format.
Frequently asked questions
How many questions are on the Kentucky master plumber exam?
DHBC does not publish a question count or time limit. It has a written portion and a pipe-sizing drawing portion, and each needs 80%.
Is there a plumbing code book I need?
The Kentucky State Plumbing Code is the set of regulations in 815 KAR 20, and the written exam also covers KRS 318 and 815 KAR 2.
How often is the exam given?
DHBC schedules it in February, May, August and November, at regional sites.
Free questions with answers
Show all 10 free questions and answers
A journeyman plumber takes a 6-hour renewal package. How many of those hours can be safety practices and procedures and still count toward the annual requirement?
Answer: No more than 2 hours
815 KAR 2:010 Section 1(5) says more than two hours of safety practices and procedures per twelve-month period will not be accepted. Safety is an allowed subject for plumbers, but it is capped, so the other four hours must come from business, code or trade subjects.
Reference: 815 KAR 2:010, Section 1(5)
Under the KRS 318.010(4) definition of plumbing, storm sewers and rain water piping located within a building are included out to what point?
Answer: A point 2 feet outside the building
KRS 318.010(4)(d) includes storm sewers and rain water piping inside a building to a point two feet outside of it. The property line is the limit for the water service and house sewer in (a) and (c), and the five-foot figure in (c) concerns sewers extending from a main or manhole.
Reference: KRS Chapter 318, KRS 318.010(4)(d)
A master plumber who procured permits for a company dies. How long may the company continue to use his master license under KRS 318.054(5)?
Answer: Up to 180 continuous calendar days, if bonding and insurance stay in effect
KRS 318.054(5) grants an interim period of up to 180 continuous calendar days, provided the company documents and keeps the required bonding and insurance in force. The deceased master's license is terminated at the end of the interim, and the company then needs an employee holding a valid master license.
Reference: KRS Chapter 318, KRS 318.054(5)
What non-refundable examination fee must a master plumber applicant pay with the examination registration under 815 KAR 20:030?
Answer: $150
Section 1(1)(a)2 sets the examination fee at $150 for a master plumber and $50 for a journeyman. The $250 figure is the master license fee, and $125 is the master inactive-status fee.
Reference: 815 KAR 20:030, Section 1(1)(a)2
What minimum score must a master plumber applicant earn on each portion of the Kentucky master plumber examination?
Answer: 80 percent
Section 2(2)(a)2 requires proof of a passing score of at least eighty percent on each portion of the master examination. Seventy-five percent is the journeyman requirement in Section 3(2)(b).
Reference: 815 KAR 20:030, Section 2(2)(a)2
A plumbing exam applicant fails to complete the required examination within one year after the first notice of examination. What happens to the application?
Answer: The application is void
Section 1(1)(b) of 815 KAR 20:030 says that if the applicant fails to successfully complete the examination within one year from the date of the first notice of examination, the application shall be void. Retakes within that year require only the exam fee again.
Reference: 815 KAR 20:030, Section 1(1)(b)
What is the basic purpose of a plumbing trap, as defined in 815 KAR 20:010?
Answer: To hold a liquid seal that blocks sewer gas without materially hindering flow
Section 1(220) defines a trap as a fitting or device that provides a liquid seal to prevent the emission of sewer gases without materially affecting the flow of sewage or waste water through it. Venting, not the trap, admits air to prevent siphonage.
Reference: 815 KAR 20:010, Section 1(220)
A potable water outlet has a 2-inch effective opening and is well away from any wall. What minimum air gap applies under 815 KAR 20:120 Section 1(7)(a)?
Answer: 4 inches
For effective openings greater than one inch the air gap is twice the effective opening when the outlet is not affected by a near wall: 2 x 2 in = 4 in. Two inches would use a factor of one, three inches matches no rule here, and the wall-affected factor of 3 would give 6 inches.
Reference: 815 KAR 20:120, Section 1(7)(a)2 and table
On a plan, a stack serves 3 lavatories (1 fixture unit each), 2 bathtubs (1 1/2 each) and 2 water closets of 1.6 gallons per flush (4 each). What is the smallest stack size allowed by 815 KAR 20:090 Sections 10 and 11?
Answer: 3 inches
Using the 815 KAR 20:080 fixture unit values: 3 x 1 = 3, 2 x 1.5 = 3, 2 x 4 = 8, so 14 fixture units. The Section 10 table gives 2 1/2 inches only 12 fixture units, and 3 inches 36. Water closets also need at least a 3 inch soil pipe (Section 10(2)), and two water closets are within the limit of four at 1.6 gpf. Four inches would be oversized, which the exam penalizes.
Reference: 815 KAR 20:090, Section 10 and 11(3)
A drawing shows one stack with 5 water closets at 1.6 gallons per flush and 5 lavatories, 25 fixture units in all. What stack size does 815 KAR 20:090 Section 11(3) require?
Answer: 4 inches
The 25 fixture units fit a 3 inch stack by the Section 10 table (36 maximum), but Section 11(3)(b) says more than four water closets at 1.6 gpf or less shall not discharge into a 3 inch stack. Five water closets force a 4 inch stack. Five inches (342 fixture units) would be oversized.
Reference: 815 KAR 20:090, Section 11(3)(b)
Sources
- Kentucky Department of Housing, Buildings and Construction (opens in a new tab)
- 815 KAR (Kentucky Administrative Regulations, Title 815) (opens in a new tab)
- Kentucky Revised Statutes (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.