Requirements at a glance
| Agency | Your Kansas city or county licenses you; the International Code Council (ICC) gives the exam through Pearson VUE. There is no statewide license |
|---|---|
| Experience | Set by your city or county. Sedgwick County/Wichita: electrical master is journeyman plus 2 years; mechanical and plumbing master is 2 years as a journeyman or 4 years in the field |
| Exam | KGF: 100 questions, 4 hours, 75% |
| Books allowed | 2018 International Plumbing Code and 2018 International Fuel Gas Code |
| Fees | $115 per ICC exam (national T-series exams are $120), plus your city or county's certificate or license fees |
Plumbers applying for a master certificate or plumbing contractor license from a Kansas city or county that accepts the ICC standard exam, such as Sedgwick County/Wichita or Johnson County.
Official links
How to get licensed, step by step
Ask your city or county which exam it accepts
Kansas law lets each jurisdiction name the standard examinations it accepts as proof of competency. Confirm the exam and the experience rules before you pay.
Sedgwick County MABCD: master and journeyman trade certificates (opens in a new tab)Johnson County Contractor Licensing: exam information (opens in a new tab)Kansas statute K.S.A. 12-1525 (standard examinations) (opens in a new tab)
Register for the master plumber exam (KGF) with ICC and Pearson VUE
Create an ICC account, pick the Kansas standard exam from the Exam Catalog and schedule a Pearson VUE appointment. If you fail, wait 10 days to retake.
Schedule with Pearson VUE (ICC exams) (opens in a new tab)ICC: State of Kansas exam bulletin (PDF) (opens in a new tab)
Pass at 75% with your books
The exam is open book with four-option multiple choice and no penalty for guessing. Bring only the approved references.
ICC: State of Kansas exam bulletin (PDF) (opens in a new tab)
Apply to your city or county
Send your passing score and proof of experience to the jurisdiction, with its fee. It issues the certificate or license and sets renewal rules.
Sedgwick County MABCD: master and journeyman trade certificates (opens in a new tab)Johnson County Contractor Licensing: exam information (opens in a new tab)
How to prepare
- Study the edition the exam is built on: the 2017 NEC for electrical and the 2018 IPC, IMC and IFGC for plumbing and mechanical. Your city's adopted code can be newer.
- The exam is open book, but there is not time to look up every answer. Tab your books by chapter and table before exam day.
- The 2014 NEC / 2015 I-Code Kansas exams end December 1, 2026. If your jurisdiction wants a 2021-based exam, ask about the national ICC T-series instead.
- Administration and general knowledge (36%) and gas piping (21%) are more than half the exam. Know IPC Chapter 1 permits and inspections cold.
- Tab the drain, vent and water pipe sizing tables (Chapters 7, 9, 6) and the IFGC Chapter 4 sizing tables.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 International Plumbing Code (IPC)Essential
Allowed in the exam room. Most of the plumbing exam: administration, fixtures, water, drainage and vents.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
2018 International Fuel Gas Code (IFGC)
Allowed in the exam room. Gas piping, sizing tables, combustion air, appliance venting and installation.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
Official reference list (as published by the testing agency)
- 2018 International Plumbing Code (IPC) (allowed in the exam room)
- 2018 International Fuel Gas Code (IFGC) (allowed in the exam room)
What's on the exam
Official content outline from International Code Council (ICC), delivered by Pearson VUE, (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Administration General Knowledge | 36 | |
| Plumbing Fixtures | 13 | |
| Water Supply and Distribution | 9 | |
| Sanitary Drainage | 8 | |
| Plumbing Vent Requirements | 6 | |
| Traps, Interceptors, and Separators | 5 | |
| Storm Drainage | 2 | |
| Gas Piping | 21 |
Exam day details
- Administered by International Code Council (ICC), delivered by Pearson VUE, for Kansas cities and counties.
- Fee: $115 to ICC through Pearson VUE per exam. Your city or county's license fees are separate.
- 100 multiple-choice questions in 4 hours; 75 correct (75%) to pass.
- Open book: bring the approved references. Questions are four-option multiple choice with no penalty for guessing; 75% to pass.
- Kansas has no statewide electrician, plumber or mechanical license. ICC only tests; the city or county where you want to work sponsors you and issues the license.
- If you fail, wait 10 days to retake.
- The 2014 NEC / 2015 I-Code exams stop being offered December 1, 2026. These Kansas standard exams are based on the 2017 NEC and 2018 I-Codes; the national T-series exams cover the 2020 NEC and 2021 I-Codes.
Frequently asked questions
What's on the Kansas master plumber exam?
100 questions by weight: administration and general knowledge 36%, gas piping 21%, plumbing fixtures 13%, water supply and distribution 9%, sanitary drainage 8%, plumbing vents 6%, traps, interceptors and separators 5% and storm drainage 2%.
Which code books does the Kansas plumber exam use?
The 2018 International Plumbing Code and the 2018 International Fuel Gas Code.
What experience do I need for a master plumber certificate?
It depends on the jurisdiction. Sedgwick County asks for 2 years as a journeyman or 4 years in the field. Check with your city or county.
Free questions with answers
Show all 10 free questions and answers
A completed copper water supply system will be proved tight with an air test instead of a water test. Under the 2018 IPC, what is the minimum air pressure and hold time?
Answer: 50 psi held for at least 15 minutes
Section 312.5 allows a water test at not less than the system working pressure or, for piping other than plastic, an air test of not less than 50 psi, held for not less than 15 minutes. Plastic water piping cannot be air tested, and the water used must come from a potable source.
Reference: 2018 International Plumbing Code, Section 312.5
A lavatory is being set beside a side wall in a toilet room. Under Section 405.3.1, what is the minimum distance from the center of the lavatory to the wall?
Answer: 15 inches
Section 405.3.1 says a water closet, urinal, lavatory or bidet shall not be set closer than 15 inches from its center to any side wall, partition, vanity or other obstruction. The 12-inch figure applies only to an accessible children's water closet. The 20-inch value is the rim space that counts as one lavatory in Section 419.1, which is unrelated.
Reference: 2018 International Plumbing Code, Section 405.3.1
Three wall-hung lavatories are installed side by side in a washroom with no partitions between them. Under Section 405.3.1, what is the minimum center-to-center spacing between adjacent lavatories?
Answer: 30 inches between centers of adjacent lavatories
Where partitions or other obstructions do not separate adjacent fixtures, Section 405.3.1 requires at least 30 inches between their centers. The 15-inch value is the minimum from a fixture centerline to a side wall or partition, not between two fixtures.
Reference: 2018 International Plumbing Code, Section 405.3.1
A laundry tray is served by a faucet with an effective opening of 3/4 inch, and the spout is located close to a wall. What is the minimum air gap above the flood level rim according to Table 608.16.1?
Answer: 2-1/2 inches
Table 608.16.1 lists sinks, laundry trays and other fixtures with effective openings not greater than 3/4 inch at 1-1/2 inches away from a wall and 2-1/2 inches close to a wall. The 1-1/2 inch value is for the same fixture away from a wall; 1 inch is the lavatory value away from a wall.
Reference: 2018 International Plumbing Code, Table 608.16.1
A building drain makes a horizontal change of direction of 90 degrees. What does Section 708.1.4 require at that change of direction?
Answer: A cleanout installed at the change of direction
Section 708.1.4 requires a cleanout wherever a horizontal drainage pipe, building drain or building sewer changes horizontal direction by more than 45 degrees. If more than one such change occurs within 40 feet of developed length, one cleanout for the first change can serve the others.
Reference: 2018 International Plumbing Code, Section 708.1.4
A dry vent connects to a horizontal drain pipe. Where must the vent connection be made on the pipe according to Section 905.3?
Answer: Above the centerline of the horizontal drain
Section 905.3 requires every dry vent connecting to a horizontal drain to connect above the centerline of the pipe so that waste will not flow into the vent and block it. Section 905.2 also requires vents to be graded to drain back to the drainage pipe.
Reference: 2018 International Plumbing Code, Section 905.3
A fixture drain is fitted with a trap. What are the maximum distances allowed by Section 1002.1 from the fixture outlet to the trap weir?
Answer: 24 inches vertical and 30 inches horizontal
Section 1002.1 limits the vertical distance from the fixture outlet to the trap weir to 24 inches and the horizontal distance, measured centerline of outlet to centerline of the trap inlet, to 30 inches. Fixtures with integral traps are excepted.
Reference: 2018 International Plumbing Code, Section 1002.1
A flat roof measures 40 feet by 60 feet. A vertical wall 20 feet wide and 12 feet high rises above the roof and diverts rainwater onto it. Under Section 1106.4, what area is used to size the storm drainage?
Answer: 2,520 square feet
Roof area is 40 x 60 = 2,400 sq ft. Section 1106.4 adds one-half of the area of any vertical wall that diverts rainwater to the roof: 20 x 12 = 240 sq ft, half is 120 sq ft. 2,400 + 120 = 2,520 sq ft. Adding the full wall area gives 2,640.
Reference: 2018 International Plumbing Code, Section 1106.4
A new natural gas system in a house will operate at 14 inches of water column (about 1/2 psig). What is the minimum test pressure under Section 406.4.1 of the 2018 IFGC?
Answer: 3 psig
1-1/2 times a 1/2 psig working pressure is only 0.75 psig, but Section 406.4.1 sets a floor: the test pressure must be not less than 3 psig irrespective of design pressure. A 3 psig test is therefore required.
Reference: 2018 International Fuel Gas Code, Section 406.4.1
What is the minimum burial depth below grade for underground gas piping under Section 404.12 of the 2018 IFGC (outside the exception for individual outdoor appliance lines)?
Answer: 12 inches
Section 404.12 requires underground gas piping to be installed at least 12 inches below grade. Section 404.12.1 allows individual lines to outdoor lights, grills and similar appliances to be 8 inches deep when approved and not subject to physical damage.
Reference: 2018 International Fuel Gas Code, Section 404.12
Sources
- ICC: State of Kansas Contractor/Trades Examination Information Bulletin (10/12/2026) (opens in a new tab)
- Pearson VUE: ICC exams (opens in a new tab)
- Sedgwick County MABCD: master and journeyman trade certificates (opens in a new tab)
- Johnson County Contractor Licensing: exam information (opens in a new tab)
Questions last verified November 4, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.