Indiana Plumbing Contractor Exam: Practice Test & Licensing Guide

The Prov exam for the Indiana plumbing contractor license: 90 open-book questions on the 2006 International Plumbing Code with Indiana amendments, with a heavier Indiana business and law section. 3 hours, 70% to pass.

Questions
90
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Indiana Business

A person works under the supervision, direction and responsibility of a licensed plumbing contractor, installing and repairing plumbing as an occupation. Which license category does the statute describe?

Requirements at a glance

AgencyIndiana Plumbing Commission (Professional Licensing Agency); exams by Prov
ExamPlumbing Contractor: 90 questions, 3 hours, 70%
Books allowed2006 IPC (2nd printing, Indiana edition), 675 IAC 16-1.4 and the Indiana code compilation or Indiana Plumbing Supplement; all open book
RetakesUp to 7 attempts on one approval, no required wait, no more than 7 per year
Fees$100 to Prov, plus Commission fees (see below)
Also allowedNASCLA Contractors Guide to Business, Law and Project Management, 14th Edition
EligibilityAge 18+; 4 years in a Commission-approved apprenticeship, 4 years' plumbing experience (notarized statement), or 4 years in a plumbing business under a licensed plumbing contractor (IC 25-28.5-1-12)
Commission fees$50 application; $100 license ($50 if issued in an odd-numbered year); $100 renewal every 2 years

Plumbers applying for an Indiana plumbing contractor license from the Indiana Plumbing Commission.

How to get licensed, step by step

  1. Apply to the Plumbing Commission

    Indiana licenses plumbers statewide. Send the Commission your application for the license you want (age 18 or older); it approves you to test. Indiana residents need 4 years in a Commission-approved apprenticeship or 4 years of documented plumbing experience; out-of-state applicants can use their state license.

    Indiana Plumbing Commission (Professional Licensing Agency) (opens in a new tab)PLA: plumbing licensing information (opens in a new tab)

  2. Schedule with Prov

    Once approved, register and schedule at provexam.com, at one of Prov's 17 Indiana testing centers or remotely from home. Reschedule at least 3 days ahead or you lose the fee.

    Schedule with Prov (opens in a new tab)Prov: Indiana plumbing bulletin (opens in a new tab)

  3. Take the open-book exam

    90 questions in 3 hours; 70% to pass. Prov scores it immediately and sends the result to the Commission. A passing result is valid for 2 years.

    Prov: Indiana plumbing bulletin (opens in a new tab)

  4. Get licensed

    After you pass, the Commission issues your license. Licenses expire December 31 of odd-numbered years and renew every 2 years. To work in Indianapolis, a plumbing contractor also registers the state license with the City.

    Indiana Plumbing Commission (Professional Licensing Agency) (opens in a new tab)

How to prepare

  • Indiana's code is the 2006 IPC with Indiana amendments (675 IAC 16-1.4), not a current IPC. Read the amendments first: they change the base text.
  • Tab your books before exam day: Chapters 7 (drainage), 9 (vents) and 6 (water supply) and the sizing tables.
  • Indiana business is 14 of 90 questions: use the NASCLA guide and the Indiana plumbing supplement for contracts, insurance, liens and licensing rules.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2006 IPC and 675 IAC 16-1.4. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • 2006 International Plumbing Code, 2nd printing, Indiana edition (ICC item 3200s06in); the 2006 IPC or the 2006 IPC Code and Commentary may be substituted (open book)
  • 2012 Indiana Amendments, 675 IAC 16-1.4 (open book; candidate-printed copy allowed)
  • NASCLA Contractors Guide to Business, Law and Project Management, 14th Edition (open book)
  • Indiana Plumbing Supplement, Prov (open book)

What's on the exam

Official content outline from Prov, Inc. (number of questions per topic):

TopicQuestions
Indiana Business14
General Requirements9
Fixtures10
Water Heaters5
Water Supply and Distribution12
Sanitary Drainage13
Vents13
Developed Length/Isometric Analysis10
Storm Water Systems4

Exam day details

  • Administered by Prov, Inc. for the Indiana Plumbing Commission.
  • Fee: $100 to Prov, plus the Commission's $50 application fee and a $100 license fee ($50 if issued in an odd-numbered year).
  • 90 questions in 3 hours; 70% to pass.
  • Indiana business and law is 14 of the 90 questions, more than twice its share on the journeyman exam.
  • Indiana's plumbing code is the 2012 Indiana Plumbing Code, which is the 2006 IPC with Indiana amendments. It is not the current IPC.
  • To qualify (age 18 or older): Indiana residents need 4 years in a Commission-approved apprenticeship program, a notarized statement showing 4 years of plumbing trade experience, or 4 years working in a plumbing business under a licensed plumbing contractor (IC 25-28.5-1-12). Out-of-state applicants can qualify with a plumbing license from their state.
  • Commission fees: $50 application, then a $100 license fee ($50 if the license is issued in an odd-numbered year). Contractor licenses expire December 31 of odd-numbered years and renew for $100 (860 IAC 1-1-2.1).
  • Open book: bring the references the Prov bulletin lists as open book. The IPC 2006 (2nd printing, Indiana edition) may be replaced by the 2006 IPC or the 2006 IPC Code and Commentary, and you may print 675 IAC 16-1.4 yourself.
  • The Indiana Plumbing Commission approves your application first; then you schedule with Prov, at one of its 17 Indiana testing centers or remotely from home.
  • Prov scores the exam immediately and sends the result to the Commission.
  • You can take the exam up to 7 times on one approval (no required wait between attempts, no more than 7 per year), after which you must reapply. A passing result stays valid for 2 years.
  • Reschedule or cancel at least 3 days before your appointment, or you forfeit the exam fee.

Frequently asked questions

What's on the Indiana plumbing contractor exam?

90 questions: Indiana business 14, sanitary drainage 13, vents 13, water supply and distribution 12, fixtures 10, developed length and isometric analysis 10, general requirements 9, water heaters 5 and storm water systems 4.

Which books can I use on the Indiana plumbing contractor exam?

It is open book: the 2006 IPC (Indiana 2nd printing, or the plain 2006 IPC or Code and Commentary), 675 IAC 16-1.4, the NASCLA Contractors Guide to Business, Law and Project Management (14th edition) and the Indiana Plumbing Supplement.

How is the contractor exam different from the journeyman exam?

Same code and format (90 questions, 3 hours, 70%), but Indiana business is 14 questions instead of 6 and the fee is $100 instead of $75.

Free questions with answers

Show all 10 free questions and answers
  1. A person works under the supervision, direction and responsibility of a licensed plumbing contractor, installing and repairing plumbing as an occupation. Which license category does the statute describe?

    Answer: Journeyman plumber

    IC 25-28.5-1-2(3) defines a journeyman plumber as one who engages in plumbing work as an occupation under the supervision, direction and responsibility of a licensed plumbing contractor. The contractor carries responsibility for the project; the apprentice is still learning under immediate supervision.

    Reference: Indiana Code 25-28.5 (Plumbers), IC 25-28.5-1-2(3)

  2. Which of the following must a plumbing contractor include on written or printed advertising for plumbing services and on vehicles used to provide plumbing services?

    Answer: The license number of the plumbing contractor, recognizably displayed

    IC 25-28.5-1-35(b) requires the contractor's license number to be recognizably displayed in all written or printed advertising and on all vehicles used to provide plumbing services. Under 860 IAC 1-4-2 it must be of adequate size and close enough to be readily seen by a person with normal vision. (IC 25-28.5-1-31(c) separately requires the contractor's name or business name; renewal dates, bond amounts and journeyman names are not required.)

    Reference: Indiana Code 25-28.5 (Plumbers), IC 25-28.5-1-35(b); 860 IAC 1-4-2

  3. A drainage system is water tested in sections rather than all at once. What is the minimum head of water on any joint, other than the uppermost 10 feet of the system?

    Answer: 10 feet of head on each joint

    Section 312.2 says each section is filled with water and no section is tested with less than a 10-foot head; successive sections overlap so that no joint, except in the uppermost 10 feet of the system, sees less than a 10-foot head. The pressure is held at least 15 minutes.

    Reference: 2006 IPC (2012 Indiana Plumbing Code, 675 IAC 16-1.4), Section 312.2

  4. A contractor is specifying the drain for a site-built shower (not a bathtub). Under Section 417.3, which waste outlet meets the code?

    Answer: A 1 1/2-inch outlet with a removable strainer at least 3 inches in diameter and openings at least 1/4 inch

    Section 417.3 requires shower waste outlets of at least 1 1/2 inches, and, for other than bathtub outlets, removable strainers not less than 3 inches in diameter with openings not less than 0.25 inch in minimum dimension. Where showers share a waste outlet, the floor must be pitched so waste from one shower does not flow over another's floor area.

    Reference: 2006 IPC (2012 Indiana Plumbing Code, 675 IAC 16-1.4), Section 417.3

  5. A non-direct-vent gas water heater must be placed in an enclosure opening off a bedroom. Under the exceptions to Indiana's added Section 502.2.1, which installation is allowed?

    Answer: A dedicated enclosure taking all combustion air directly from outdoors, entered through a solid, weather-stripped door with an approved self-closing device

    675 IAC 16-1.4-6(c) adds Section 502.2.1, which bars fuel-fired appliances from sleeping rooms, bathrooms, toilet rooms, storage closets and surgical rooms, and from taking combustion air from them. Exception (iii) allows an appliance in a dedicated enclosure in which all combustion air comes directly from outdoors per Section 703 of the Indiana Mechanical Code, with access through a solid door weather-stripped to energy code exterior air-leakage requirements and fitted with an approved self-closing device. Louvers or grilles to the bedroom would draw combustion air from a prohibited room.

    Reference: 675 IAC 16-1.4, 675 IAC 16-1.4-6(c), Section 502.2.1

  6. A thermal expansion tank is added on a closed water supply system with a storage water heater. Under Indiana's amended Section 607.3.2, which statement is correct?

    Answer: No valves may be installed between the water heating appliance and the expansion tank

    Section 607.3.2 requires a device to control thermal expansion pressure where a backflow device or check valve closes the system, and Indiana adds that when expansion tanks are used, there shall be no valves installed between the water heating appliance and the expansion tank.

    Reference: 675 IAC 16-1.4, 675 IAC 16-1.4-7(i), Section 607.3.2

  7. A horizontal fixture drain is 2 inches in diameter. What is the minimum slope under Table 704.1?

    Answer: 1/4 inch per foot

    Table 704.1 sets 1/4 inch per foot (2 percent) for horizontal drainage pipe of 2 1/2 inches or less. Pipes of 3 to 6 inches use 1/8 inch per foot.

    Reference: 2006 IPC (2012 Indiana Plumbing Code, 675 IAC 16-1.4), Table 704.1

  8. A 2-inch fixture trap is on a fixture drain sloped 1/4 inch per foot. Using Table 906.1, what is the maximum developed length from the trap weir to the vent fitting?

    Answer: 8 feet

    Table 906.1 lists 1 1/4-inch traps at 5 feet, 1 1/2-inch at 6 feet, 2-inch at 8 feet (all at 1/4 inch per foot), and 3-inch at 12 feet and 4-inch at 16 feet (at 1/8 inch per foot).

    Reference: 2006 IPC (2012 Indiana Plumbing Code, 675 IAC 16-1.4), Table 906.1

  9. A storm sump pump is installed in an office building basement. Under Section 1113.1.4, which valves are required on the pump discharge piping?

    Answer: A gate valve and a full flow check valve

    Section 1113.1.4 requires sump discharge piping to include a gate valve and a full flow check valve, with pipe and fittings the same size as or larger than the pump discharge tapping. The exception allowing only a check valve applies to one- and two-family dwellings, not an office building. Section 1113.1.2 also sets the pit at not less than 18 inches in diameter and 24 inches deep unless otherwise approved.

    Reference: 2006 IPC (2012 Indiana Plumbing Code, 675 IAC 16-1.4), Section 1113.1.4

  10. Which description matches the code definition of developed length in Chapter 2?

    Answer: The length of a pipeline measured along the centerline of the pipe and fittings

    Chapter 2 defines developed length as the length of a pipeline measured along the centerline of the pipe and fittings. It follows every bend and offset, so it is longer than the straight-line distance between the ends.

    Reference: 2006 IPC (2012 Indiana Plumbing Code, 675 IAC 16-1.4), Chapter 2, Definitions: Developed Length

Sources

Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.