Indiana licensing exam

Indiana Journeyman Plumber Exam: Practice Test & Licensing Guide

The Prov exam for the Indiana journeyman plumber license: 90 open-book questions on the 2006 International Plumbing Code with Indiana amendments, Indiana business rules and plumbing law, 3 hours, 70% to pass.

Questions
90
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Vents

An open vent pipe extends through a roof that is used only for weather protection. What is the minimum height it must terminate above the roof?

Requirements at a glance

AgencyIndiana Plumbing Commission (Professional Licensing Agency); exams by Prov
ExamJourneyman Plumber: 90 questions, 3 hours, 70%
Books allowed2006 IPC (2nd printing, Indiana edition), 675 IAC 16-1.4 and the Indiana code compilation or Indiana Plumbing Supplement; all open book
RetakesUp to 7 attempts on one approval, no required wait, no more than 7 per year
Fees$75 to Prov, plus Commission fees (see below)
EligibilityAge 18+; 4 years in a Commission-approved apprenticeship, or a notarized statement of 4 years' plumbing experience (IC 25-28.5-1-12)
Commission fees$30 application; $30 license ($15 if issued in an odd-numbered year); $30 renewal every 2 years

Plumbers applying for an Indiana journeyman plumber license from the Indiana Plumbing Commission. Indiana licenses plumbers statewide.

How to get licensed, step by step

  1. Apply to the Plumbing Commission

    Indiana licenses plumbers statewide. Send the Commission your application for the license you want (age 18 or older); it approves you to test. Indiana residents need 4 years in a Commission-approved apprenticeship or 4 years of documented plumbing experience; out-of-state applicants can use their state license.

    Indiana Plumbing Commission (Professional Licensing Agency) (opens in a new tab)PLA: plumbing licensing information (opens in a new tab)

  2. Schedule with Prov

    Once approved, register and schedule at provexam.com, at one of Prov's 17 Indiana testing centers or remotely from home. Reschedule at least 3 days ahead or you lose the fee.

    Schedule with Prov (opens in a new tab)Prov: Indiana plumbing bulletin (opens in a new tab)

  3. Take the open-book exam

    90 questions in 3 hours; 70% to pass. Prov scores it immediately and sends the result to the Commission. A passing result is valid for 2 years.

    Prov: Indiana plumbing bulletin (opens in a new tab)

  4. Get licensed

    After you pass, the Commission issues your license. Licenses expire December 31 of odd-numbered years and renew every 2 years. To work in Indianapolis, a plumbing contractor also registers the state license with the City.

    Indiana Plumbing Commission (Professional Licensing Agency) (opens in a new tab)

How to prepare

  • Indiana's code is the 2006 IPC with Indiana amendments (675 IAC 16-1.4), not a current IPC. Read the amendments first: they change the base text.
  • Tab your books before exam day: Chapters 7 (drainage), 9 (vents) and 6 (water supply) and the sizing tables.
  • Vents (17) and sanitary drainage (15) are about a third of the exam. Practice sizing vents and drains from fixture units.
  • Indiana business is only 6 questions: read the Indiana code compilation or Plumbing Supplement for the licensing rules.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2006 IPC and 675 IAC 16-1.4. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • 2006 International Plumbing Code, 2nd printing, Indiana edition (ICC item 3200s06in); the 2006 IPC or the 2006 IPC Code and Commentary may be substituted (open book)
  • 2012 Indiana Amendments, 675 IAC 16-1.4 (open book; candidate-printed copy allowed)
  • A Compilation of the Indiana Code and the Indiana Administrative Code, 2014, Indiana Plumbing Commission (open book; the Indiana Plumbing Supplement may be substituted)

What's on the exam

Official content outline from Prov, Inc. (number of questions per topic):

TopicQuestions
Indiana Business6
General Requirements7
Storm Water Systems6
Developed Length/Isometric Analysis8
Vents17
Sanitary Drainage15
Water Supply and Distribution14
Water Heaters7
Fixtures10

Exam day details

  • Administered by Prov, Inc. for the Indiana Plumbing Commission.
  • Fee: $75 to Prov, plus the Commission's $30 application fee and a $30 license fee ($15 if issued in an odd-numbered year).
  • 90 questions in 3 hours; 70% to pass.
  • Indiana's plumbing code is the 2012 Indiana Plumbing Code, which is the 2006 IPC with Indiana amendments. It is not the current IPC, and our questions use the 2006 text and the Indiana amendments.
  • To qualify (age 18 or older): Indiana residents need 4 years in a Commission-approved apprenticeship program or a notarized statement showing 4 years of plumbing trade experience (IC 25-28.5-1-12). Out-of-state applicants can qualify with a plumbing license from their state.
  • Commission fees: $30 application, then a $30 license fee ($15 if the license is issued in an odd-numbered year). Journeyman licenses expire December 31 of odd-numbered years and renew for $30 (860 IAC 1-1-2.1).
  • Open book: bring the references the Prov bulletin lists as open book. The IPC 2006 (2nd printing, Indiana edition) may be replaced by the 2006 IPC or the 2006 IPC Code and Commentary, and you may print 675 IAC 16-1.4 yourself.
  • The Indiana Plumbing Commission approves your application first; then you schedule with Prov, at one of its 17 Indiana testing centers or remotely from home.
  • Prov scores the exam immediately and sends the result to the Commission.
  • You can take the exam up to 7 times on one approval (no required wait between attempts, no more than 7 per year), after which you must reapply. A passing result stays valid for 2 years.
  • Reschedule or cancel at least 3 days before your appointment, or you forfeit the exam fee.

Frequently asked questions

What's on the Indiana journeyman plumber exam?

90 questions: vents 17, sanitary drainage 15, water supply and distribution 14, fixtures 10, developed length and isometric analysis 8, general requirements 7, water heaters 7, Indiana business 6 and storm water systems 6.

Which plumbing code does Indiana use?

The 2012 Indiana Plumbing Code: the 2006 International Plumbing Code, 2nd printing, with the Indiana amendments in 675 IAC 16-1.4.

How many times can I take the Indiana plumbing exam?

Up to 7 times on a single approval, with no required wait between attempts and no more than 7 per year. After that you reapply to the Plumbing Commission.

Free questions with answers

Show all 10 free questions and answers
  1. An open vent pipe extends through a roof that is used only for weather protection. What is the minimum height it must terminate above the roof?

    Answer: 6 inches

    Section 904.1 (Indiana text: six inches) requires open vents through a roof to end at least 6 inches above it. The 7-foot figure applies only where the roof is used for something other than weather protection, such as a deck.

    Reference: 2012 Indiana Plumbing Code (2006 IPC, 2nd printing, with 675 IAC 16-1.4 amendments), 904.1

  2. An open vent terminal will sit 8 feet horizontally from an openable window of the same building. What is the least height at which the terminal can be placed above the top of that window opening?

    Answer: 2 feet

    Section 904.5 keeps a vent terminal at least 10 feet horizontally from any openable window or air intake unless the terminal is at least 2 feet above the top of the opening. At 8 feet away, it must be 2 feet higher than the window top.

    Reference: 2012 Indiana Plumbing Code (2006 IPC, 2nd printing, with 675 IAC 16-1.4 amendments), 904.5

  3. What is the minimum slope for a horizontal drainage pipe 4 inches in diameter?

    Answer: 1/8 inch per foot

    Table 704.1 requires 1/4 inch per foot for pipe 2-1/2 inches or smaller, 1/8 inch per foot for 3 to 6 inch pipe, and 1/16 inch per foot for 8 inch and larger.

    Reference: 2012 Indiana Plumbing Code (2006 IPC, 2nd printing, with 675 IAC 16-1.4 amendments), Table 704.1

  4. A water service pipe and a building sewer will run in separate trenches. What separation of undisturbed or compacted earth is normally required between them?

    Answer: 5 feet

    Section 603.2 requires 5 feet of undisturbed or compacted earth between the water service pipe and the building sewer, with exceptions such as a service pipe at least 12 inches above the top of the sewer or a sleeved crossing.

    Reference: 2012 Indiana Plumbing Code (2006 IPC, 2nd printing, with 675 IAC 16-1.4 amendments), 603.2

  5. A water heater is in an area where leakage will cause damage, so a pan is installed. What is the minimum diameter of the pan's indirect waste drain pipe?

    Answer: 3/4 inch

    Section 504.7.1 requires the pan to be at least 1.5 inches deep and drained by an indirect waste pipe with a minimum diameter of 3/4 inch. Section 504.7 sets 24 gage galvanized steel as the minimum pan material.

    Reference: 2012 Indiana Plumbing Code (2006 IPC, 2nd printing, with 675 IAC 16-1.4 amendments), 504.7, 504.7.1

  6. An automatic clothes washer standpipe is being installed in a house. Which arrangement is correct under the Indiana Plumbing Code?

    Answer: A 2-inch trap and drain, trap not below the floor

    Section 406.3 requires the standpipe trap and fixture drain to be at least 2 inches, connecting to a branch or stack at least 3 inches. Indiana adds to Section 802.4 that a trap for a clothes-washer standpipe receptor shall not be installed below the floor.

    Reference: 2012 Indiana Plumbing Code (2006 IPC, 2nd printing, with 675 IAC 16-1.4 amendments), 406.3, 802.4 (amended by 675 IAC 16-1.4-9)

  7. A pipe passes under a footing or through a foundation wall. What is required to protect it?

    Answer: Relieving arch, or sleeve two sizes larger

    Section 305.5 requires a relieving arch or a pipe sleeve built into the foundation wall, with the sleeve two pipe sizes greater than the pipe passing through.

    Reference: 2012 Indiana Plumbing Code (2006 IPC, 2nd printing, with 675 IAC 16-1.4 amendments), 305.5

  8. A roof with a horizontally projected area of 2,500 square feet is designed for a rainfall rate of 4 inches per hour. Using Table 1106.2, what is the smallest vertical leader that can serve it?

    Answer: 4 inches

    At 4 inches per hour Table 1106.2 allows 720 sq ft for a 2-inch leader, 2,200 sq ft for 3-inch and 4,600 sq ft for 4-inch. The 3-inch leader is too small for 2,500 sq ft, so a 4-inch leader is the smallest.

    Reference: 2012 Indiana Plumbing Code (2006 IPC, 2nd printing, with 675 IAC 16-1.4 amendments), Table 1106.2

  9. A 45-degree offset in a waste line has a rise (offset distance) of 24 inches. What is the length of pipe along the offset, the travel, to the nearest inch?

    Answer: 34 inches

    For a 45-degree offset the travel equals the offset distance times the square root of 2 (1.414). 24 x 1.414 = 33.9, or about 34 inches. 24 inches ignores the diagonal; 48 inches doubles the rise.

    Reference: 2012 Indiana Plumbing Code (2006 IPC, 2nd printing, with 675 IAC 16-1.4 amendments), Section 202 (definition of Developed length); Section 706.3 (fittings for change in direction)

  10. Under IC 25-28.5-1-12(a), a natural person over what age may be licensed as a journeyman plumber in Indiana?

    Answer: 18 years

    IC 25-28.5-1-12(a) permits a natural person over the age of 18 to be licensed as a journeyman plumber. Age 17 is the minimum for registering as an apprentice (IC 25-28.5-1-18.1).

    Reference: Indiana Code (IC 25-28.5-1, 2026 text; Indiana Plumbing Commission), IC 25-28.5-1-12(a); IC 25-28.5-1-18.1(a)

Sources

Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.