Requirements at a glance
| Agency | City of Indianapolis / Marion County Board of Electrical Examiners; the Board assigns an International Code Council (ICC) exam |
|---|---|
| License | Master Electrician (unrestricted) |
| Exam | Master Electrician (ICC national exam): 100 questions, 5 hours, 75% |
| Books allowed | 2023 NEC and Ugly's Electrical References (any edition); open book |
| Edition check | The city's materials do not name the ICC exam number or NEC edition. Our bank follows ICC's national exam on the 2023 NEC; confirm the exact exam and edition with the Board |
| Eligibility | 6 years of electrical construction experience (up to 2 years may be credited for related college courses and up to 2 for a related apprenticeship); notarized employer letter, three customer reference letters; Board interview |
| Retakes | You may retake the exam, but if you have not passed within 6 months of approval, you wait one year from approval before orientation and licensure |
| Fees | $120 to ICC's testing vendor; City license holder fee $189 to $377 depending on when you apply in the two-year term ($247 renewal) |
| Bond and insurance | $10,000 surety bond, general liability insurance and workers' compensation |
Electricians seeking an unrestricted Master Electrician license in Indianapolis and Marion County. Indiana sets electrical licensing locally; the Board of Electrical Examiners approves candidates and assigns the ICC exam.
Official links
How to get licensed, step by step
Apply to the Board
Send the Board of Electrical Examiners your application, experience letters, three customer reference letters and a driver's license copy at least 10 business days before its meeting (second Thursday of each month), then interview with the Board. Questions: (317) 327-8467.
City of Indianapolis: contractor licenses (opens in a new tab)
Sit for the ICC exam
If the Board approves you, it assigns the appropriate ICC exam and gives you the information to register. Confirm the exam and NEC edition with the Board.
ICC: National Contractor/Trades Exam Bulletin (opens in a new tab)
Score 75%
The Board's 2026 policy sets a passing score of 75% on the 2023 NEC examination. If you already passed, you can submit your ICC score report with your application.
ICC: National Contractor/Trades Exam Bulletin (opens in a new tab)
Orientation and license
Reappear before the Board for orientation, then send proof of bond, insurance and workers' compensation with the license application and fees. Licenses expire December 31 of odd-numbered years.
City of Indianapolis: contractor licenses (opens in a new tab)
How to prepare
- The exam is open book on the 2023 NEC. Tab the load calculation tables in Chapter 9 and Annex D, Article 220 and the conductor ampacity tables.
- Ugly's is allowed in any edition; know where its formulas and tables are.
- Wiring methods and materials (19), services (16) and branch circuits (16) are more than half the exam.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2023 NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2023 EditionEssential
Allowed in the exam room. Almost every electrical question comes from it.
Ugly's Electrical References (any edition)
Allowed in the exam room. Formulas, conductor and conduit tables, motor data.
Official reference list (as published by the testing agency)
- 2023 National Electrical Code, NFPA 70 (open book)
- Ugly's Electrical References, any edition (open book)
What's on the exam
Official content outline from International Code Council (ICC), assigned by the Indianapolis Board of Electrical Examiners (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Knowledge | 12 | |
| Services and Service Equipment | 16 | |
| Feeders | 4 | |
| Branch Circuits and Conductors | 16 | |
| Wiring Methods and Materials | 19 | |
| Equipment and Devices | 10 | |
| Control Devices | 3 | |
| Motors and Generators | 8 | |
| Special Occupancies, Equipment, and Conditions | 12 |
Exam day details
- Administered by International Code Council (ICC), assigned by the Indianapolis Board of Electrical Examiners.
- Fee: $120 to ICC's testing vendor (Pearson). The Indianapolis license holder fee is separate ($189 to $377 depending on when you apply in the two-year term).
- 100 questions in 5 hours; 75% to pass. Open book.
- This bank follows ICC's national Master Electrician exam (R16-N) outline, which is based on the 2023 NEC. Indiana's state-adopted NEC is older, but our questions use the 2023 NEC text.
- The Indianapolis Board of Electrical Examiners interviews you first. If it approves you, it assigns "the appropriate International Code Council (ICC) exam" and gives you the information to sit for it. The city's materials do not name the exam number, so this page is built on ICC's national electrician exams and the 2023 NEC; confirm the exact exam and edition with the Board before you register.
- The Board's 2026 policy sets the passing score at 75% on the 2023 NEC examination and says it adopts the most current NEC edition within 90 days of a new one being announced. Ask the Board which edition applies on your test date.
- Experience needed to go before the Board: 6 years of electrical construction experience documented by a notarized employer letter (or three letters from supply houses or contractors, with business documents). The Board may credit up to 2 years for related college courses and up to 2 years for a related apprenticeship. You also need three customer reference letters and a copy of your driver's license, submitted at least 10 business days before the meeting (second Thursday of each month).
- After you pass, you reappear before the Board for orientation, then send proof of a $10,000 surety bond, general liability insurance and workers' compensation with the license application and fees. If you do not pass within 6 months of approval, you wait a year from approval before orientation and licensure. You have 2 years after passing to attend orientation.
- City fees (2026-2027 term): license holder $377 if you apply January to June 2026, $283 July to December 2026, $189 in 2027; $247 to renew. A business license is also required ($247, $185 or $124 by application date; not charged to sole proprietors). Licenses expire December 31 of odd-numbered years.
- The Board can reciprocate a license from another area if you passed a Prometric (Block) exam that meets its requirements; contact the Board at (317) 327-8467.
Frequently asked questions
What's on the Indianapolis Master Electrician exam?
The ICC national Master Electrician outline: wiring methods and materials 19%, services and service equipment 16%, branch circuits and conductors 16%, general knowledge 12%, special occupancies 12%, equipment and devices 10%, motors and generators 8%, feeders 4% and control devices 3%.
Which electrical exam does Indianapolis give?
The Board of Electrical Examiners assigns the appropriate ICC exam after it approves you. The city does not name the exam number or NEC edition in its materials, so confirm both with the Board. We built this exam on ICC's national Master Electrician exam and the 2023 NEC.
What score do I need?
The Board's 2026 policy sets 75% on the 2023 NEC examination.
Free questions with answers
Show all 10 free questions and answers
A one-family dwelling is supplied by a 3-wire service. What is the minimum rating the NEC allows for its service disconnecting means, regardless of the calculated load?
Answer: 100 amperes
230.79(C) sets 100 A, 3-wire, as the floor for a one-family dwelling. 60 A is the floor in 230.79(D) for all other installations, and 30 A applies only to a service with not more than two 2-wire branch circuits (230.79(B)). The calculated load can force a larger rating but never a smaller one.
Reference: NFPA 70, National Electrical Code, 2023, 230.79(C)
A 480Y/277-volt switchboard has exposed live parts on the front and a grounded concrete wall behind the working space. Using Table 110.26(A)(1), what is the minimum depth of working space?
Answer: 3 ft 6 in.
277 V to ground falls in the 151-600 V row. Grounded parts (a concrete wall counts as grounded) on the other side is Condition 2, which is 1.0 m (3 ft 6 in.). 3 ft is Condition 1 and 4 ft is Condition 3 (live parts on both sides).
Reference: NFPA 70, National Electrical Code, 2023, Table 110.26(A)(1)
A 1,200 A feeder disconnect is on a solidly grounded 208Y/120-volt system. What does 215.10 require?
Answer: No ground-fault protection, because the system is 150 volts or less to ground
215.10 requires ground-fault protection of equipment on feeder disconnects rated 1000 A or more only on solidly grounded wye systems of more than 150 volts to ground but not exceeding 1000 volts phase-to-phase (in accordance with 230.95). 208Y/120 is 120 V to ground, so it is outside the rule. A 480Y/277 system would be covered.
Reference: NFPA 70, National Electrical Code, 2023, 215.10
A 120-volt branch circuit serves 19 A of continuous load and 5 A of noncontinuous load. The breaker is not listed for 100 percent operation. What is the smallest standard breaker rating under 210.20(A) and 240.6(A)?
Answer: 30 A
210.20(A): 5 + (19 x 1.25 = 23.75) = 28.75 A minimum rating. The next standard size in 240.6(A) is 30 A. 25 A is below the computed 28.75 A; 20 A is below even the 24 A actual load; 35 A is larger than needed.
Reference: NFPA 70, National Electrical Code, 2023, 210.20(A), 240.6(A)
Under Table 300.5(A), what is the minimum cover for direct-buried Type UF cable in a location not otherwise specified (Column 1)?
Answer: 24 in.
Table 300.5(A), Column 1, requires 600 mm (24 in.) of cover for direct-buried cables or conductors in all locations not specified below. Smaller values apply to specific conditions such as rigid metal conduit (6 in.) or nonmetallic raceways (18 in.).
Reference: NFPA 70, National Electrical Code, 2023, Table 300.5(A)
Rigid metal conduit is installed underground in an ordinary location (not under a road or building). What is the minimum cover under Table 300.5(A)?
Answer: 6 in.
Table 300.5(A), Column 2 (rigid metal conduit or intermediate metal conduit), allows 150 mm (6 in.) of cover in all locations not specified otherwise. PVC and EMT (Column 3) need 18 in. and direct-buried cables need 24 in.
Reference: NFPA 70, National Electrical Code, 2023, Table 300.5(A)
A continuous-duty 25 hp, 460-volt, 3-phase squirrel-cage motor supplies a pump. Using Table 430.250 for full-load current, what is the minimum ampacity of the branch-circuit conductors under 430.22?
Answer: 42.5 A
Table 430.250 gives 34 A for 25 hp at 460 V. 430.22 requires conductors for a single continuous-duty motor to have ampacity not less than 125 percent of that table value: 34 x 1.25 = 42.5 A. 34 A omits the 125 percent factor. The other values do not follow from the rule.
Reference: NFPA 70, National Electrical Code, 2023, 430.22, Table 430.250
What is the maximum height above the floor for the center of the grip of a wall-mounted switch or circuit breaker operating handle in its highest position, under 404.8(A)?
Answer: 6 ft 7 in.
404.8(A) limits the center of the grip to 2.0 m (6 ft 7 in.) above the floor or working platform. Exceptions include switches on busways, switches adjacent to the equipment they supply, and hookstick-operable isolating switches. 240.24(A) uses the same value for circuit breakers.
Reference: NFPA 70, National Electrical Code, 2023, 404.8(A)
A shop has several separate motor-driven machines, each with its own motor. What is the general rule in 430.87 for motor controllers?
Answer: Each motor must have an individual motor controller
430.87: each motor shall be provided with an individual motor controller, with exceptions such as a single controller rated at not less than the equivalent horsepower of the group where permitted for motors of 1000 volts or less (Exception No. 1).
Reference: NFPA 70, National Electrical Code, 2023, 430.87
Under 625.43, when must the disconnecting means be provided for electric vehicle supply equipment (EVSE)?
Answer: When rated more than 60 amperes or more than 150 volts to ground
625.43 requires a readily accessible, lockable disconnecting means for EVSE and wireless power transfer equipment rated more than 60 A or more than 150 V to ground. If remote from the equipment, a plaque must show its location.
Reference: NFPA 70, National Electrical Code, 2023, 625.43
Sources
- ICC National Contractor/Trades Exam Bulletin (R16-N and R18-N electrician exams) (opens in a new tab)
- City of Indianapolis: electrical license (Board of Electrical Examiners) (opens in a new tab)
- Revised Code of Indianapolis and Marion County, Chapter 875 (contractors and skilled trades) (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.