Illinois licensing exam

Chicago Crane Operator Class I Written Exam: Practice Test & Licensing Guide

Practice for the City of Chicago Class I crane operator written exam (CTS 304), given by CTS: 65 questions in 3 hours on equipment types, operating practices, rigging and signals, inspections, safe working loads, OSHA rules and hoisting personnel. 70 to pass, closed book.

Questions
65
Time limit
3 hours
Passing score
70%
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Types of Equipment

Under the Chicago crane licensing program, a licensed operator is required for cranes and hoisting equipment with a rated capacity of at least what amount?

Requirements at a glance

AgencyCity of Chicago Department of Buildings (Board of Crane Operator Examiners); written exam by Continental Testing Services (CTS), exam code 304
EligibilityAge 21; 2,000 hours operating in the past 48 months or an approved apprenticeship; current federal crane operator certification for the equipment type; other conditions on the City page
Exam65 questions, 3 hours, 70 to pass
ScopeClass I: tower, crawler, truck and mobile cranes, boom trucks, carry deck and spider cranes, derricks and drum hoists
Book allowedClosed book: no books, notes or references; non-programmable calculator only
Fee$150 written (CTS); practical exam $400 per equipment type; 5-year license $550 (City, 2026)

Crane operators seeking a City of Chicago crane operator license for Class I equipment (tower, crawler, truck and mobile cranes, boom trucks, carry deck and spider cranes, derricks and drum hoists). Passing the Class I written exam lets you schedule any Class I or Class II practical exam. The practical exam is separate and is not covered here.

How to get licensed, step by step

  1. Apply through the City portal

    Applications go through the City's Inspections, Permits and Licenses portal; CTS processes them and runs the written exam.

    City of Chicago: Crane Operator License (opens in a new tab)Continental Testing Services: City of Chicago exams (opens in a new tab)

  2. Pass the written exam

    3 hours, 70 to pass. There are no make-up dates and no refunds; you can re-register for the next date.

    CTS: Chicago Crane Operators study guide (2017) (opens in a new tab)

  3. Study the CTS references

    IPT's Crane and Rigging Training Manual and the OSHA crane and rigging rules, including 29 CFR 1926 Subpart CC.

    CTS: Chicago Crane Operators study guide (2017) (opens in a new tab)OSHA: 29 CFR 1926 Subpart CC, cranes and derricks in construction (opens in a new tab)

  4. Schedule the practical

    A written pass unlocks the practical exam for your equipment type. You must pass at least one practical within one year of the written exam.

    City of Chicago: Crane Operator License (opens in a new tab)

How to prepare

  • CTS's guide is from July 2017, so confirm with CTS that the current exam matches it.
  • Rigging and signals (15) and safe working loads (14) are about 45% of the exam. Practice sling angle, load weight and capacity-deduction math by hand.
  • Class I includes 4 questions on hoisting personnel with a manbasket (29 CFR 1926 Subpart CC and the personnel platform rules); Class II does not.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • Garby, IPT's Crane and Rigging Training Manual (2005)
  • 29 CFR 1910 Subpart N, Sections 176-184 (materials handling and storage)
  • 29 CFR 1926.251 (rigging equipment)
  • 29 CFR 1926 Subpart N, Sections 550-554 (cranes, derricks, hoists)
  • 29 CFR 1926 Subpart O, Sections 600 and 602 (material handling equipment)
  • 29 CFR 1926 Subpart T, Sections 858 and 859 (demolition)
  • 29 CFR 1926 Subpart CC, Sections 1400-1441 (cranes and derricks in construction)

What's on the exam

Official content outline from Continental Testing Services (CTS) (number of questions per topic):

TopicQuestions
Types of Equipment10
Operating Practices8
Rigging & Signals15
Inspections & Maintenance4
Safe Working Loads14
OSHA Regulations & Workplace Safety10
Hoisting Personnel Safely4

Exam day details

  • Administered by Continental Testing Services (CTS) for the City of Chicago Department of Buildings (Board of Crane Operator Examiners).
  • Fee: $150
  • 65 questions in 3 hours; 70 to pass. The per-topic counts above are the numbers printed in CTS's guide.
  • Closed book: CTS says candidates may not use books, notes or other references. Bring two No. 2 pencils and a non-programmable, non-printing, solar- or battery-powered calculator.
  • Class I is the broader exam. It includes hoisting personnel (manbasket design and use), which the Class II exam does not.
  • The Chicago license also requires a practical exam per equipment type (CTS 317), the required federal crane operator certification and operating experience. The City lists the 2026 written exam fee as $150 and the practical as $400 per equipment type and exam date.
  • CTS's study guide is dated July 2017. Confirm with CTS that the current exam matches it.

Note: CTS's crane guide is from July 2017 and keyed to OSHA rules of that period; the topic counts, 3-hour limit, 70 pass mark and closed-book rule are from the guide. IPT's manual is not freely readable, so load-chart and rigging math rest on standard formulas and OSHA text.

Frequently asked questions

How many questions are on the Chicago Class I crane operator written exam?

65 questions in 3 hours, with 70 to pass. CTS's guide prints the count for each of the seven topics.

Is the Chicago crane operator written exam open book?

No. CTS's guide says candidates may not use books, notes or other reference materials; only a non-programmable calculator is allowed.

What is the difference between Class I and Class II?

Passing the Class I written exam lets you take any Class I or Class II practical exam; the Class II written exam only qualifies you for Class II practicals. Class I also tests hoisting personnel and the larger equipment types.

What does the exam cover?

Rigging and signals (15 questions) and safe working loads (14) are the largest topics, followed by types of equipment and OSHA regulations (10 each). CTS bases the questions on 29 CFR 1910 and 1926 and IPT's Crane and Rigging Training Manual.

Free questions with answers

Show all 10 free questions and answers
  1. Under the Chicago crane licensing program, a licensed operator is required for cranes and hoisting equipment with a rated capacity of at least what amount?

    Answer: 2,000 pounds or more

    The CTS study guide states that cranes and hoisting equipment with a rated capacity of 2,000 pounds or more require a licensed operator in the City of Chicago. Building inspectors may stop work where such equipment is run by an unlicensed operator. Smaller thresholds (500 or 1,000 lb) are not the Chicago figure.

    Reference: CTS Chicago Crane Operators Examination Study Guide (July 2017), General Information (opening paragraph)

  2. A tower crane changes its working radius by raising and lowering its jib instead of moving a trolley. On a congested site this design is useful mainly because it

    Answer: keeps the jib from swinging out over neighboring property when the jib is raised

    A luffing-boom tower crane (license type A-2) tilts its jib up to shorten radius, so the jib tip can clear adjacent buildings or other cranes. It still needs counterweight and a proper erection plan, and it does not have more capacity at every radius. Self-erecting cranes (A-3) are the ones designed to raise themselves.

    Reference: CTS Chicago Crane Operators Examination Study Guide (July 2017), Classifications of Equipment Requiring a Chicago Crane License (Class I, A-2)

  3. The operator decides the ground at the planned set-up does not meet the support requirements. What does Subpart CC require the operator's employer to do?

    Answer: Discuss with the controlling entity the ground preparations needed to meet the requirement

    Section 1926.1402(e) says that when the A/D director or the operator finds that ground conditions fail the requirement, that person's employer must have a discussion with the controlling entity about the preparations needed, using supporting materials where necessary. Proceeding on bad ground is not allowed.

    Reference: 29 CFR 1926 Subpart CC, 29 CFR 1926.1402(e)

  4. A competent person measures a hoist rope and finds the diameter is reduced by more than what amount from its nominal diameter before the rope is a Category II deficiency?

    Answer: More than 5 percent below nominal

    Under 1926.1413(a)(2)(ii)(B), a diameter reduction of more than 5 percent from nominal is a Category II apparent deficiency. Rope diameter is measured at its widest points, across the crowns of opposite strands. Reduction signals core collapse, internal wear or stretching.

    Reference: 29 CFR 1926 Subpart CC, 29 CFR 1926.1413(a)(2)(ii)(B)

  5. What operating design factor must any rotation resistant wire rope have, at minimum, under Subpart CC?

    Answer: 3.5

    Section 1926.1414(e)(2)(ii) sets 3.5 as the floor for all rotation resistant ropes (Types I, II and III). Type I normally needs at least 5, as do Types II and III unless extra conditions are met. Types II and III with a factor under 5 cannot be used for duty-cycle or repetitive lifts.

    Reference: 29 CFR 1926 Subpart CC, 29 CFR 1926.1414(e)(2)

  6. A two-leg bridle sling lifts a 6,000-lb load. Each leg makes a 60-degree angle with the horizontal. Ignoring the weight of the rigging, what is the tension in each leg?

    Answer: About 3,464 lb

    Each leg carries half the load vertically: 6,000 / 2 = 3,000 lb. Tension = vertical share / sin(angle from horizontal) = 3,000 / 0.866 = 3,464 lb. Using 3,000 ignores the angle; 6,928 forgets that two legs share the load; 6,000 uses cosine instead of sine.

    Reference: CTS Chicago Crane Operators Examination Study Guide (July 2017), Content outline 5 (Safe Working Loads); standard sling-angle formula

  7. As the angle between a sling leg and the horizontal gets smaller, what happens to the tension in the leg for the same load?

    Answer: It increases, so the sling's capacity at the angle is lower

    Leg tension equals the leg's share of the load divided by the sine of the angle from horizontal, so a smaller angle makes the sine smaller and the tension larger. Riggers keep sling angles large (45 degrees or more is a common practice) and use the sling tag or chart capacity at the actual angle.

    Reference: CTS Chicago Crane Operators Examination Study Guide (July 2017), Content outline 5 (Safe Working Loads); standard sling-angle formula

  8. When must the competent person begin the visual inspection of a crane under Subpart CC?

    Answer: Before each shift the equipment is used

    Section 1926.1412(d) requires a competent person to begin a visual inspection before each shift the equipment is used, completed before or during the shift. It is a visual check for apparent deficiencies; taking components apart or booming down is not required unless something found calls for it.

    Reference: 29 CFR 1926 Subpart CC, 29 CFR 1926.1412(d)

  9. A crane's rated capacity at the working radius is 9,500 lb. When it hoists a suspended personnel platform, what is the maximum total load permitted, including the platform, hook, load line and rigging?

    Answer: 4,750 lb

    The total load must not exceed 50 percent of rated capacity for the radius and configuration: 9,500 x 0.50 = 4,750 lb. Twenty-five percent gives 2,375, and 75 percent gives 7,125.

    Reference: 29 CFR 1926 Subpart CC, 29 CFR 1926.1431(d)(1)

  10. Under OSHA's demolition rules, the weight of a demolition ball on a crane is limited to which of the following, whichever gives the lesser value?

    Answer: 50 percent of the crane's rated load at the radius used, or 25 percent of the line's breaking strength

    Section 1926.859(b) limits the demolition ball to 50 percent of the crane's rated load, based on the boom length and the maximum angle of operation at which the ball will be used, or 25 percent of the nominal breaking strength of the line suspending it, whichever results in the lesser value. This is a Subpart T (demolition) rule, not a Subpart CC capacity rule.

    Reference: 29 CFR 1926 Subpart T (Demolition), 29 CFR 1926.859(b)

Sources

Questions last verified November 13, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.