Requirements at a glance
| Agency | Hawaii Contractors License Board (DCCA PVL); exams by PSI |
|---|---|
| Experience | At least 4 years of supervisory experience (foreman, supervising employee or contractor) in the classification within the past 10 years (HAR 16-77-18); the Board may accept equivalent training or experience |
| Exams | C-52 Ventilating and Air Conditioning Contractor: 80 questions, 3 hours, 75%, plus the Business and Law exam for new applicants |
| Books allowed | None; closed book |
| Fees | $80 to PSI per exam ($85 for B and A), plus the Board's application and license fees and required insurance |
Qualifiers for a Hawaii C-52 ventilating and air conditioning contractor license from the Contractors License Board, in addition to the Business and Law exam.
Official links
How to get licensed, step by step
Apply to the Board
Send the Contractors License Board your application. You can't register with PSI until the Board approves it and sends a letter of approval.
Contractors License Board (opens in a new tab)Hawaii Administrative Rules 16-77 (contractors) (opens in a new tab)
Schedule Business and Law and the C-52 exam with PSI
Register online or call PSI at 833-333-4754. Your approval is good for 6 months and you can test as often as you like in that time. After 6 months you need a new application.
Pass both exams
Each exam needs 75%. If you already hold a Hawaii license and add a classification, you take only the new trade exam.
Get licensed
Send the Board your results and proof of the insurance (workers' compensation and liability) the license requires.
Contractors License Board (opens in a new tab)Hawaii Revised Statutes chapter 444 (contractors) (opens in a new tab)
How to prepare
- Hawaii's trade exams are PSI exams on specific editions: the 2020 NEC, the 2018 UPC, IMC, IFGC and IBC. Hawaii's state electrical code is older than the 2020 NEC, so study to the editions on PSI's bulletin, and check the bulletin again before test day.
- Contractor exams are closed book except C-13, where PSI provides the NEC. Electrician exams provide the NEC too. Plumber and other contractor exams allow no reference books.
- General knowledge and code requirements is 34 of the 80 questions: study the 2018 IMC.
- Control (10) and equipment (10) draw on Modern Refrigeration and Air Conditioning; load calculations (6) follow ACCA Manual N.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
2018 International Mechanical Code (IMC), ICCEssential
On PSI's outline, closed book. Most of the general knowledge and code questions.
Modern Refrigeration and Air Conditioning, 21st Edition, Goodheart-Willcox
On PSI's outline, closed book. Source for controls, equipment and system theory.
ACCA Manual N: Commercial Load Calculation for Small Commercial Buildings, 5th Edition (2008)
On PSI's outline, closed book. Load calculation questions.
SMACNA HVAC Duct Construction Standards, Metal and Flexible, 4th Edition (2020)
On PSI's outline, closed book. Ducting questions.
29 CFR Part 1926 (OSHA construction standards)
On PSI's outline, closed book. Safety questions.
Official reference list (as published by the testing agency)
- International Mechanical Code (IMC), 2018 edition, ICC (not allowed in the exam room)
- Modern Refrigeration and Air Conditioning, 21st edition, Goodheart-Wilcox (not allowed)
- Manual N: Commercial Load Calculation for Small Commercial Buildings, 5th edition, 2008, ACCA (not allowed)
- HVAC Duct Construction Standards, Metal and Flexible, 4th edition, 2020, SMACNA (not allowed)
- 29 CFR Part 1926 (OSHA construction standards) (not allowed)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Knowledge and Code Requirements | 34 | |
| Load Calculations | 6 | |
| Control | 10 | |
| Ducting and Insulation | 8 | |
| Piping | 8 | |
| Safety OSHA | 4 | |
| Equipment | 10 |
Exam day details
- Administered by PSI Services for the Hawaii Contractors License Board.
- Fee: $80 to PSI. The Contractors License Board's application and license fees are separate.
- 80 scored questions in 3 hours; 60 correct (75%) to pass. The exam is closed book.
- The Board must approve your application before you can register with PSI. Your eligibility lasts 6 months, and you can test as often as you like within it.
- PSI may add up to 10 unscored pretest questions; they do not count against your time.
- Closed-book and open-book rules are on each exam page. PSI provides an online calculator, or you can bring a silent, non-programmable one.
Frequently asked questions
What's on the Hawaii C-52 exam?
80 scored questions: general knowledge and code requirements 34, control 10, equipment 10, ducting and insulation 8, piping 8, load calculations 6 and safety OSHA 4.
Which code edition is on the exam?
The 2018 International Mechanical Code.
Do I also take Business and Law?
Yes, if you are a new applicant.
Free questions with answers
Show all 10 free questions and answers
A gas furnace is installed in an attic and must be reached through a passageway. Under the general IMC rule, what are the minimum passageway height and width, and the maximum length measured along the centerline from the opening to the appliance?
Answer: 30 inches high, 22 inches wide, not more than 20 feet long
IMC 306.3: the attic passageway must be at least 30 inches high and 22 inches wide and no more than 20 feet long, with continuous solid flooring at least 24 inches wide. The 50-foot length applies only under the exception when the passageway is at least 6 feet high and 22 inches wide for its entire length.
Reference: 2018 International Mechanical Code, 306.3
An air handler above a finished ceiling has an auxiliary pan with no separate drain line. Which addition makes that auxiliary protection method code-compliant?
Answer: A UL 508 water-level detection device that shuts off the equipment before the pan overflows
IMC 307.2.3 allows an auxiliary pan without a separate drain only where it has a water-level detection device conforming to UL 508 that shuts off the equipment served before the pan overflows. An alarm alone or a second line joining the primary does not meet the section.
Reference: 2018 International Mechanical Code, 307.2.3
A duct system is designed to operate at 2.5 inches of water column. Which is the lowest standard duct pressure classification that satisfies IMC 603.3?
Answer: 3 inch w.c.
IMC 603.3 lists the classifications at positive or negative 0.5, 1, 2, 3, 4, 6 or 10 inches w.c., and the classification must equal or exceed the design pressure. 2 inch is below 2.5, so 3 inch is the lowest compliant class.
Reference: 2018 International Mechanical Code, 603.3
A 3/4-inch PEX tubing run is hung horizontally in a hydronic radiant system. What is the maximum horizontal support spacing in the IMC table?
Answer: 32 inches
IMC Table 305.4 lists PEX tubing 1 inch and smaller at 2 2/3 feet (32 inches) horizontally, and 1 1/4 inches and larger at 4 feet. A 3/4-inch tube is in the smaller group.
Reference: 2018 International Mechanical Code, Table 305.4
A portable ladder is used to reach an upper landing such as a roof. How far must the side rails extend above the upper landing surface under 29 CFR 1926.1053(b)(1)?
Answer: At least 3 feet
29 CFR 1926.1053(b)(1): when a portable ladder is used for access to an upper landing, the side rails extend at least 3 feet above the upper landing surface, or the ladder is secured and a grab rail provided where that extension is not possible.
Reference: 29 CFR 1926, 1926.1053(b)(1)
A cooling system delivers 1,000 cfm of supply air that is 20 degrees F colder than the room. What is the sensible cooling capacity delivered (Q = 1.08 x cfm x delta T)?
Answer: 21,600 Btu/h
General practice: Qs = 1.08 x 1,000 cfm x 20 F = 21,600 Btu/h. Multiplying only cfm by delta T gives 20,000 and ignores the 1.08 air constant; 43,200 doubles the result.
Reference: General practice, General practice: sensible heat equation Qs = 1.08 x cfm x delta T
What is the maximum control voltage the IMC allows for boiler control and limit circuits?
Answer: 150 volts nominal, line to line
IMC 1006.8 limits control voltage to 150 volts nominal line to line. The circuit is supplied from a two-wire grounded branch circuit or an isolation transformer with one secondary conductor grounded. Typical 24-volt thermostat circuits are well within this limit.
Reference: 2018 International Mechanical Code, 1006.8
What must a boiler low-water cutoff do when the water level falls below the lowest safe water level set by the manufacturer?
Answer: Automatically stop the combustion operation of the appliance
IMC 1007.2: low-water cutoff and flow sensing controls must automatically stop combustion when the water level drops below the lowest safe level or when circulation stops. An alarm alone does not meet the section.
Reference: 2018 International Mechanical Code, 1007.2
Which standard covers the controls and safety devices on a boiler with a fuel input rating of 8,000,000 Btu/h?
Answer: ASME CSD-1
IMC 1004.1: controls and safety devices for boilers with inputs of 12,500,000 Btu/h or less must meet ASME CSD-1; above that rating NFPA 85 applies. UL 834 is for packaged electric boilers, not for fuel-fired controls.
Reference: 2018 International Mechanical Code, 1004.1
What is the minimum unobstructed width of passageways around all sides of a boiler, unless otherwise approved?
Answer: 18 inches
IMC 1004.3 requires clearances around boilers to permit inspection, servicing, repair and gauge visibility, with passageways on all sides at least 18 inches wide unless otherwise approved.
Reference: 2018 International Mechanical Code, 1004.3
Sources
- PSI: Hawaii Contractors Candidate Information Bulletin (1/20/2026) (opens in a new tab)
- Hawaii DCCA Professional and Vocational Licensing (opens in a new tab)
- Hawaii Revised Statutes chapter 444 (contractors) (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.