Requirements at a glance
| Agency | California Contractors State License Board (CSLB); exams by PSI |
|---|---|
| Experience | 4 years of journey-level experience in the trade within the last 10 years |
| Exams | C-20 HVAC trade exam, plus the Law and Business exam |
| Format | Closed book, 4-choice, 3.5 hours per exam; question count and pass score not published |
| Study references | 2025 California Mechanical Code (UMC 2024 base); ASHRAE, SMACNA and ACCA manuals |
| Fees | $450 application (one classification); $200 (sole owner) or $350 initial license fee after you pass; $25,000 contractor bond; fingerprints |
Qualifiers for a California C-20 HVAC contractor license. Taken together with the Law and Business exam. Technicians handling refrigerants also need the federal EPA 608 certification.
Official links
How to get licensed, step by step
Pick your classification
Find the CSLB classification for your work. The qualifier named on the license needs 4 years of journey-level experience in it within the past 10 years.
Apply to CSLB
Submit the $450 application with your experience verification. CSLB reviews it and refers you to test.
California Contractors State License Board (CSLB) (opens in a new tab)CSLB: List of all fees (opens in a new tab)
Schedule Law and Business and the C-20 exam with PSI
Book both exams with PSI. Pass both within 18 months of acceptance; each exam sitting costs $51.43 paid to PSI. Passing results stay good for 5 years.
PSI: schedule your CSLB exam (877-392-6422) (opens in a new tab)
Bond, fees and fingerprints
After you pass, CSLB sends a Bond and Fee letter: file the $25,000 contractor bond, pay the initial license fee and complete fingerprints to receive your license.
How to prepare
- The CSLB exams are closed book and CSLB doesn't publish question counts or the passing score, so aim for steady scores well above 80% on our practice tests rather than a bare minimum.
- Use CSLB's free study guide for your classification: it lists the sections, approximate weights and the references the questions come from.
- Every license needs two exams (Law and Business plus the trade exam). Pass both within 18 months of CSLB accepting your application.
- Fabrication, installation and startup is about 38% of the exam: duct sizing, equipment installation, combustion air and startup checks.
- Planning and estimating includes load calculations (ACCA Manuals J and N) and equipment selection (Manual S).
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
CSLB examination study guide for your classificationEssential
Free from CSLB. Lists the sections, approximate weights and references for the exam.
2025 California Building, Electrical, Plumbing and Mechanical Codes
Not allowed in the exam room. CSLB's study guides cite the 2025 California codes (effective January 1, 2026).
Official reference list (as published by the testing agency)
- CSLB C-20 HVAC study guide (4/2026)
- 2025 California Mechanical Code (UMC 2024 base), Plumbing Code, Electrical Code, Building Code and Energy Code
- ASHRAE Handbooks; SMACNA duct standards; ACCA Manuals D, J, S, N, Q and P; Stanfield, Fundamentals of HVACR
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Planning and Estimating | 22 | |
| Fabrication, Installation, and Startup | 38 | |
| Troubleshooting, Repair, and Maintenance | 20 | |
| Safety | 20 |
Exam day details
- Administered by PSI Services for the California Contractors State License Board (CSLB).
- Fee: $450 CSLB application fee (one classification), paid to CSLB. Separately, each exam sitting costs $51.43, paid directly to PSI (a retake costs it again, after a 21-day wait). Cancel or reschedule at least 2 days ahead to keep your fee. The $200 or $350 initial license fee and the $25,000 bond come after you pass.
- Closed book: no code books, notes or calculators from home. PSI provides a calculator, and every question has four choices with no penalty for guessing.
- You get 3.5 hours per exam and see your result on screen. A failing report breaks your performance down by section.
- Every license needs two exams: Law and Business plus the trade exam for the classification (C-61 has no trade exam). You must pass both within 18 months of CSLB accepting your application, and passing results stay good for 5 years.
- The qualifier needs 4 years of journey-level experience within the last 10 years. Each exam sitting costs $51.43 paid to PSI, and you must cancel or reschedule at least 2 days before the appointment to keep the fee.
- Work worth $500 or more (labor and materials) requires a California contractor license.
Note: CSLB does not publish the number of questions or the passing score for its exams. The 100-question practice length is ours, and the pass line shown in our practice tests is only a study target. Check CSLB's study guide and the PSI bulletin for current details.
Frequently asked questions
What's on the California C-20 exam?
CSLB lists approximate weights: fabrication, installation and startup 38%, planning and estimating 22%, troubleshooting, repair and maintenance 20% and safety 20%.
Do I need EPA 608 for the C-20 exam?
EPA 608 is a separate federal certification for handling refrigerants, not part of the CSLB application. We cover it in our national EPA 608 practice tests.
Which codes does the C-20 exam use?
The study guide cites the 2025 California Mechanical, Plumbing, Electrical and Building Codes and the Energy Code, plus ASHRAE, SMACNA and ACCA manuals. The exam is closed book.
How many questions are on the exam and what score do I need?
CSLB doesn't publish either number, so we don't state them. Each exam is closed book with 4-choice questions and 3.5 hours to finish. Your result appears on screen, and a failing report shows how you did by section.
Free questions with answers
Show all 10 free questions and answers
An air handler delivers 1,200 CFM. Return air is 75°F and supply air is 55°F. What is the sensible cooling capacity being delivered?
Answer: 25,920 Btu/h
Sensible heat Q = 1.08 x CFM x TD. TD = 75 - 55 = 20°F, so Q = 1.08 x 1,200 x 20 = 25,920 Btu/h. 28,800 comes from using 1.2 as the constant, 24,000 from dropping the constant entirely, and 21,600 from using 0.9.
Reference: General trade practice, Sensible heat equation Q = 1.08 x CFM x TD
A gas furnace has a 60,000 Btu/h input and an 80% AFUE. It moves 1,000 CFM across the heat exchanger. Approximately what temperature rise should you expect across the furnace?
Answer: 44°F
Output = 60,000 x 0.80 = 48,000 Btu/h. Temperature rise = output / (1.08 x CFM) = 48,000 / (1.08 x 1,000) = 44.4°F. Using the 60,000 input gives 55.6°F, and dropping the 1.08 constant gives 48°F; both ignore a step.
Reference: General trade practice, Air temperature rise = Btu/h output / (1.08 x CFM)
A 12-inch round duct carries 1,200 CFM. What is the approximate air velocity in the duct?
Answer: 1,528 fpm
Velocity = CFM / area. Area of a 12-inch round duct = 3.1416 x (0.5 ft)^2 = 0.7854 ft2. V = 1,200 / 0.7854 = 1,528 fpm. Forgetting to divide the diameter-squared term by 4 gives 382 fpm; treating the duct as 1 ft2 gives 1,200 fpm.
Reference: General trade practice, Duct velocity V = Q / A
A tenant-improvement job in an office (not a residential occupancy, not a health care facility) uses flexible duct to reach a diffuser. What is the maximum length of flexible air duct the mechanical code allows?
Answer: 5 feet
CMC 603.4.1 limits flexible air ducts to 5 feet in length, and they may not be used in lieu of rigid elbows or fittings; residential occupancies are excepted. The 10-foot figure applies only to health care terminal connections under 603.4.1.1.
Reference: 2025 California Mechanical Code, Section 603.4.1
An unlisted central furnace with a temperature limit control set at no more than 250°F supplies a duct. What clearance to combustibles is required, and for how far from the furnace supply plenum?
Answer: 6 inches for at least 6 feet
CMC 603.13.3 requires 6 inches of clearance to combustibles for at least 6 feet from the supply plenum of an unlisted furnace equipped with a limit control set no higher than 250°F. Beyond 6 feet no clearance is required. The 3-foot distance is for listed furnaces.
Reference: 2025 California Mechanical Code, Section 603.13.3
A gas furnace with hot-surface ignition lights, then shuts off after a few seconds and repeats this on every call for heat. What is the most likely cause?
Answer: A dirty flame sensor that cannot prove the flame
In a modern furnace the control board must prove flame with a flame sensor within a few seconds. A coated or oxidized sensor rod cannot carry the tiny flame-rectification current, so the board closes the gas valve and retries. Cleaning the rod with fine abrasive cloth usually fixes it. The other choices do not apply to a gas furnace.
Reference: General trade practice, Furnace troubleshooting: flame sensor and flame rectification
An air conditioner's outdoor unit hums, but neither the condenser fan nor the compressor starts. Contactor line and load voltages are correct. What is the most likely failed part?
Answer: The run capacitor
A humming outdoor unit with correct voltage at the contactor points to a failed dual-run capacitor: neither motor gets the phase shift needed to start. Check the capacitor with a capacitance meter, and replace it with one of the same microfarad rating and equal or higher voltage rating.
Reference: General trade practice, Single-phase motor troubleshooting: run capacitor
A technician measures a suction line temperature of 56°F at the condensing unit. A gauge reading converts to a saturation temperature of 41°F. What is the superheat?
Answer: 15°F
Superheat = actual suction line temperature minus saturation temperature at suction pressure = 56 - 41 = 15°F. Adding the two numbers gives 97, and reporting either individual value is not superheat.
Reference: General trade practice, Superheat = suction line temperature - suction saturation temperature
HVAC crews are installing rooftop units on an outdoor job site in California. Above what outdoor air temperature must the employer have and maintain shade at all times while employees are present?
Answer: 80 degrees Fahrenheit
Title 8 section 3395 (heat illness prevention in outdoor places of employment) requires shade at all times when the temperature exceeds 80°F, and the shade must be able to accommodate the employees on a rest or meal period. 95°F is the threshold for the high-heat procedures, not the shade requirement.
Reference: Cal/OSHA Title 8, California Code of Regulations, Section 3395(d)
A technician is entering a permit-required space to inspect a below-grade plenum. What range of oxygen concentration is considered a safe atmosphere under the confined space rule?
Answer: 19.5 to 23.5 percent
Section 5157 defines hazardous atmospheres to include oxygen below 19.5 percent or above 23.5 percent, so the acceptable range is 19.5 to 23.5 percent. Flammable gas, vapor or mist above 10 percent of its lower flammable limit is also hazardous.
Reference: Cal/OSHA Title 8, California Code of Regulations, Section 5157(b), hazardous atmosphere
Sources
- CSLB: Examination study guides (content outlines) (opens in a new tab)
- CSLB: Examination FAQ (opens in a new tab)
- CSLB: List of all fees (opens in a new tab)
- CSLB: Get Licensed to Build (PDF) (opens in a new tab)
Questions last verified October 26, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.