Arizona licensing exam

Arizona CR-21 Hardscaping and Irrigation Exam: Practice Test & Licensing Guide

The PSI trade exam for Arizona's CR-21 landscaping license: 75 questions on irrigation, grading and drainage, low-voltage lighting, masonry, plaster, concrete, walls and ROC rules, open book.

Questions
75
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Irrigation Systems

A homeowner's new lawn sprinkler system will connect to the house's potable water supply, and no fertilizer or chemicals will be injected. Under the 2018 IRC, which device is NOT one of the backflow preventers listed for this connection?

Requirements at a glance

AgencyArizona Registrar of Contractors (ROC); trade exam by PSI
Exams75 questions, 180 minutes, 70%, plus the online Statutes and Rules Exam (SRE)
Books allowed2018 IBC, 2018 IRC and 29 CFR 1926
Fees$66 PSI trade exam + $61 SRE, plus ROC license fees and bond

Landscapers who install hardscape (patios, pavers, low walls, decks, fire pits, water features) or irrigation systems in Arizona need a CR-21 license; its qualifying party takes this exam.

How to get licensed, step by step

  1. Pick your classification and qualifying party

    Find your classification on the ROC's list. The qualifying party (an owner or regular employee of the business) must have the required trade experience and takes the exams for the business.

    Arizona ROC: License classifications (opens in a new tab)

  2. Pass the Statutes and Rules Exam (SRE)

    Buy the ROC's online SRE course and exam through GMetrix ($61), work through the course, then take the final exam. 70% to pass, one attempt per purchase.

    Buy the Statutes and Rules Exam (GMetrix) (opens in a new tab)

  3. Schedule the CR-21 trade exam with PSI

    Book online with PSI ($66, or $116 for two exams). Bring the allowed references, bound and tabbed. If you fail, wait 30 days to retake.

    Schedule with PSI (Arizona contractors) (opens in a new tab)PSI content outline: CR-21 Hardscaping and Irrigation (opens in a new tab)

  4. Apply to the ROC

    Submit your application with your passing score reports within two years of passing, plus the license bond, fees and business documents the ROC asks for.

    Arizona ROC: Applying for a license (opens in a new tab)

How to prepare

  • Bring the exact code editions on PSI's list. Arizona's trade exams use older editions (2017 NEC, 2018 I-codes); a newer book gives some wrong answers.
  • Bind or spiral any printed references, and tab them with permanent tabs before exam day. Sticky notes are removed at check-in.
  • Practice finding answers fast. On a 100-question, 4-hour exam you have 2.4 minutes per question, and some of that goes to unscored items.
  • Irrigation is 15 questions: practice friction loss, precipitation rate and backflow device selection.
  • Low-voltage lighting is 10 questions: practice voltage drop and transformer sizing on 12-volt systems.
  • Know the CR-21 scope limits (wall, fence and deck heights) and Blue Stake rules.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 IRC and the 2018 IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Building Code and International Residential Code, 2018 (allowed in the exam room)
  • 29 CFR Part 1926, OSHA Construction (allowed in the exam room)
  • Arizona Registrar of Contractors rules; Arizona 811 Blue Stake brochure (not allowed in the room)
  • Simplified Irrigation Design; Landscaping Principles and Practices; Landscape Construction (not allowed in the room)
  • Modern Masonry; PCA Portland Cement Plaster/Stucco Manual; Fences and Retaining Walls (not allowed in the room)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Irrigation Systems15
Grading and Drainage10
Low Voltage Electricity10
Masonry7
Plastering7
Concrete7
Fences and Retaining Walls6
Rules and Regulations5
General Knowledge5
Safety3

Exam day details

  • Administered by PSI Services for the Arizona Registrar of Contractors (ROC).
  • Fee: $66 to PSI ($116 for two exams taken together). The ROC license application fee is separate.
  • 75 scored questions in 180 minutes, 70% to pass. PSI also offers the outline in Spanish.
  • CR-21 covers retaining walls up to 3 feet, garden walls and fences up to 6 feet, decks up to 29 inches above grade, and irrigation and landscape lighting wiring of 120 volts or less. Gas, plumbing and electrical service work must be subcontracted.
  • Open book: bring your own bound copies of the allowed references. You may highlight and add permanent tabs beforehand, but not write in them during the exam.
  • PSI adds 5 to 10 unscored trial questions, which count against your time.
  • If you fail, wait 30 days to retake; after a third failure the wait is 90 days. Submit your ROC application within two years of passing.
  • You also need Arizona's Statutes and Rules Exam (SRE), taken online through the ROC. The ROC can waive the trade exam if you were the qualifying party on a license in the same classification in the last five years.

Frequently asked questions

Do landscapers need a license in Arizona?

For hardscaping and irrigation work, yes: the CR-21 Hardscaping and Irrigation Systems license (or a related landscaping classification).

What's on the Arizona CR-21 exam?

75 questions: irrigation systems 15, grading and drainage 10, low-voltage electricity 10, masonry, plastering and concrete 7 each, fences and retaining walls 6, rules and regulations 5, general knowledge 5 and safety 3.

Can I take the CR-21 exam in Spanish?

PSI publishes the CR-21 content outline in English and Spanish. Ask PSI about a Spanish exam when you schedule.

Free questions with answers

Show all 10 free questions and answers
  1. A homeowner's new lawn sprinkler system will connect to the house's potable water supply, and no fertilizer or chemicals will be injected. Under the 2018 IRC, which device is NOT one of the backflow preventers listed for this connection?

    Answer: Double check valve assembly

    IRC P2902.5.3 lists three ways to protect the potable supply to a lawn irrigation system: an atmospheric vacuum breaker, a pressure vacuum-breaker assembly, or a reduced pressure principle backflow prevention assembly. A double check assembly is not on that list, even though some water utilities accept one. IPC 608.17.5 has the same list for commercial work. Find it in the IRC under Section P2902.5, Protection of Potable Water Connections.

    Reference: 2018 International Residential Code, P2902.5.3

  2. Full-circle spray heads are set on a 15 ft × 15 ft square pattern, and each head uses 3.7 GPM. What is the precipitation rate of the zone?

    Answer: 1.58 in/hr

    For a uniform pattern, PR (in/hr) = 96.3 × GPM per head ÷ (head spacing × row spacing). 96.3 converts gallons per minute over square feet into inches per hour. Here PR = 96.3 × 3.7 ÷ (15 × 15) = 356.3 ÷ 225 = 1.58 in/hr. The answer 1.83 in/hr comes from wrongly using the triangular-spacing factor (225 × 0.866 = 194.9). Each square holds the equivalent of one full head (four quarter-circles), so 6.33 in/hr (four heads' flow) and 0.40 in/hr (one quarter of the flow) are both wrong.

    Reference: General trade practice, Sprinkler precipitation rate: PR = 96.3 × GPM ÷ (S × L)

  3. You are regrading planting beds next to a new house. Under the 2018 IRC, at least how much must the grade fall within the first 10 feet away from the foundation?

    Answer: 6 inches

    IRC R401.3 requires lots to be graded so surface water drains away from foundation walls, with a fall of at least 6 inches within the first 10 feet. That works out to a 5 percent slope. The 2 percent figure in the same section applies only to impervious surfaces such as patios and walks within 10 feet of the foundation. Where lot lines or walls prevent the full 6-inch fall, the exception requires drains or swales instead.

    Reference: 2018 International Residential Code, R401.3

  4. A 24-volt irrigation controller valve circuit is run in Type UF cable across a yard. Under 2018 IRC Table E3803.1, what is the minimum cover in a general location?

    Answer: 6 inches

    Table E3803.1 (based on NEC Table 300.5), column 5, covers circuits for control of irrigation and landscape lighting limited to 30 volts or less, installed in Type UF or other identified cable or raceway. The minimum cover in locations not otherwise listed is 6 inches. The 24-inch figure is for 120-volt direct-burial cable (column 1). The 12-inch figure is for GFCI-protected 120-volt residential circuits of 20 amps or less (column 4).

    Reference: 2018 International Residential Code, Table E3803.1

  5. A licensed electrician runs a 120-volt, 20-ampere, GFCI-protected residential branch circuit in direct-burial UF cable to a fountain pump in a yard. Under 2018 IRC Table E3803.1, what is the minimum cover?

    Answer: 12 inches

    Table E3803.1, column 4, allows 12 inches of cover for residential branch circuits rated 120 volts or less with GFCI protection and overcurrent protection of 20 amperes or less. A note under the table says that where a wiring method in columns 1 to 3 (such as direct-burial cable) is combined with a circuit type in columns 4 or 5, the shallower depth may be used. Without the GFCI and 20-amp limit, direct-burial cable needs 24 inches (column 1). Remember that CR-21 work must not include a new electrical service panel.

    Reference: 2018 International Residential Code, Table E3803.1

  6. Vertical rebar is grouted into the cells of a block retaining wall, and the outer face will be in contact with soil. Under the 2018 IRC, what is the minimum masonry or grout cover over that reinforcement?

    Answer: 2 inches

    IRC R606.3.4 requires bars to be completely embedded in mortar or grout. Reinforcement other than joint reinforcement needs cover of at least one bar diameter but not less than 3/4 inch. Where it is exposed to weather or soil, the minimum cover is 2 inches. The 5/8-inch figure is the face cover for joint reinforcement in horizontal mortar joints. The 3/4-inch figure applies only to protected locations.

    Reference: 2018 International Residential Code, R606.3.4

  7. A weep screed is being installed at the base of a stucco wall on wood studs. Under the 2018 IRC, how high must it be above the adjacent soil and above an adjacent concrete patio?

    Answer: At least 4 inches above earth; at least 2 inches above paved areas

    IRC R703.7.2.1 requires a corrosion-resistant weep screed at least 0.019 inch thick (No. 26 galvanized) or a plastic weep screed, with a vertical attachment flange of at least 3 1/2 inches, at or below the foundation plate line. It must be at least 4 inches above earth or 2 inches above paved areas. This matters to landscapers: raising soil or adding a patio against an existing wall can bury the screed, trap water and cause rot. IBC 2512.1.2 has the same clearances.

    Reference: 2018 International Residential Code, R703.7.2.1

  8. Under 2018 IRC Table R402.2 footnote d, what total air content is required where air-entrained concrete is called for (such as exterior steps in a moderate weathering area)?

    Answer: 5 to 7 percent

    Footnote d to Table R402.2 requires air-entrained concrete with total air content of not less than 5 percent and not more than 7 percent by volume. The tiny entrained air bubbles relieve pressure when water in the concrete freezes, preventing scaling. Footnote f allows as little as 3 percent air only for steel-troweled garage floors, and only if strength is raised to 4,000 psi. Air content above 7 percent costs too much strength.

    Reference: 2018 International Residential Code, Table R402.2, footnote d

  9. A block retaining wall holds back 3 feet of soil with no surcharge. Its footing bottom is 18 inches below the lower grade, so the wall is 4 ft 6 in from footing bottom to top of wall. Is it exempt from a permit under the 2018 IRC?

    Answer: No; the 4 ft is measured from the footing bottom

    IRC R105.2 exempts retaining walls not over 4 feet tall measured from the bottom of the footing to the top of the wall, unless they support a surcharge. Here 3 ft retained + 1.5 ft below grade = 4.5 ft, so the exemption does not apply and a permit is required. Measuring only the retained soil height is a common mistake. Note that the CR-21 scope separately limits retaining walls to 3 feet above the lower finish grade.

    Reference: 2018 International Residential Code, R105.2 (Building)

  10. Under the ROC rules (R4-9-102 and R4-9-103), what is the tallest retaining wall a CR-21 Hardscaping and Irrigation Systems licensee may build?

    Answer: Up to 3 feet from the finish grade of the lower elevation

    The C-21 and R-21 scopes in R4-9-102 and R4-9-103, which CR-21 combines under R4-9-104, allow retaining walls up to three feet from the finish grade of the lower elevation. The 6-foot figure is the limit for decorative garden walls, fences and screens. The 4-foot figure measured from the footing is the IRC/IBC permit exemption, not the license scope. Load-bearing walls are excluded from CR-21.

    Reference: Arizona Administrative Code Title 4, Chapter 9 (Registrar of Contractors), R4-9-102 (C-21 scope, item 6)

Sources

Questions last verified October 20, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.