Requirements at a glance
| Agency | Alabama Electrical Contractors Board (AECB); exam by Prov |
|---|---|
| Exam | 110 questions, 5 hours, 75% to pass, open book |
| Books allowed | 2023 NEC, American Electrician's Handbook (17th), NASCLA Contractors Guide (13th or 14th) and the 2014 Alabama Supplement |
| Fee | $165 to the Board with your application; Board license fees are separate |
Electricians applying for an Alabama electrical contractor license (unlimited in voltage and bid size) from the Alabama Electrical Contractors Board.
Official links
How to get licensed, step by step
Meet the eligibility requirement
The Board requires 8,000 hours of design, planning, layout and supervision of electrical work. Hours as a journeyman in charge of jobs count, and up to 2,000 hours can come from school or apprenticeship.
Apply to the board
Send the Board your application and the $165 exam fee. Contractors also sit a separate Business and Law exam ($86 to Prov).
Schedule with Prov
Once the Board approves you, register and schedule your exam. Prov grades the exam right away and sends your result to the board. If you fail, wait 30 days before retesting.
Bring your references
All of these exams are open book. Bring the exact books the bulletin lists; permanent tabs and pen highlighting are allowed, sticky notes and loose notes are not.
How to prepare
- About 30 of the 110 questions are business and law: estimating, licensing laws, payroll and employment taxes, financial management, labor laws and contracts.
- The electrical half mirrors the journeyman exam, with grounding and bonding (9) and service, feeders and branch circuits (10) as big sections.
- The bulletin lists the 2023 NEC. The Board has said testing moves to the 2026 NEC in 2027, so check the current bulletin before you buy books.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Official reference list (as published by the testing agency)
- NFPA 70, National Electrical Code (NEC), 2023 edition (allowed in the exam room)
- American Electrician's Handbook, 17th Edition, McGraw Hill (allowed in the exam room)
- NASCLA Contractors Guide to Business, Law and Project Management, 13th or 14th edition (allowed in the exam room)
- Alabama Supplement to the Contractors Guide to Business, Law and Project Management, 2014 (allowed in the exam room)
What's on the exam
Official content outline from Prov, Inc. (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Business Organization | 1 | |
| Risk Management | 2 | |
| Project Management | 2 | |
| Estimating | 4 | |
| Safety and Environmental | 2 | |
| Labor Laws | 3 | |
| Payroll and Employment Taxes | 4 | |
| Financial Management | 4 | |
| Contracts | 3 | |
| Lien Laws | 1 | |
| Licensing Laws | 4 | |
| General Electrical Knowledge | 10 | |
| Grounding and Bonding | 9 | |
| Conductors and Cables | 10 | |
| Raceways and Boxes | 8 | |
| Special Occupancies and Equipment | 4 | |
| Electrical Power | 3 | |
| Motors | 6 | |
| Low Voltage | 2 | |
| Lighting | 3 | |
| Illuminated Signs | 2 | |
| Fire Detection and Alarm Systems | 2 | |
| Safety Information | 5 | |
| Overcurrent Protection | 6 | |
| Service, Feeders, and Branch Circuits | 10 |
Exam day details
- Administered by Prov, Inc. for the Alabama Electrical Contractors Board.
- Fee: $165 to the Electrical Contractors Board with your application (as of 1/17/2026). Board application and license fees are separate.
- 110 questions in 5 hours; 75% to pass.
- Eligibility: 8,000 hours of experience in design, planning, layout and supervision of electrical work (journeyman-in-charge hours count); up to 2,000 hours can come from school or an approved apprenticeship (AECB rule 303-X-3).
- Electrical contractors also take a separate Business and Law exam ($86 to Prov); it is not part of this practice bank.
- Prov (provexam.com, (801) 733-4455) gives the exam for the Alabama Electrical Contractors Board (AECB). The exam fee is paid to the Board with your application, not to Prov.
- A new Board approval is required before each attempt, and you wait 30 days to retest.
- The Prov bulletin (AL CIB 2026.11.09) lists the 2023 NEC. Our research notes say the Board plans to move testing to the 2026 NEC on January 1, 2027; check the current bulletin for the edition on your test date.
- Highlighting and underlining in pen and permanent tabs are allowed in open-book references; sticky notes and handwritten notes are not.
Frequently asked questions
What's on the Alabama electrical contractor exam?
110 questions. About 30 cover business topics (estimating 4, licensing laws 4, payroll and employment taxes 4, financial management 4, labor laws 3, contracts 3 and more) and the rest cover electrical knowledge: general electrical knowledge 10, conductors and cables 10, service, feeders and branch circuits 10, grounding and bonding 9, raceways and boxes 8, motors 6, overcurrent protection 6 and others.
Which books are allowed?
The 2023 NEC, American Electrician's Handbook (17th), the NASCLA Contractors Guide (13th or 14th edition) and the 2014 Alabama Supplement.
How much experience do I need?
8,000 hours, which can be met by 8,000 hours as a journeyman electrician in charge of jobs. Up to 2,000 hours may be replaced by school or apprenticeship credit.
Free questions with answers
Show all 10 free questions and answers
A 120-volt branch circuit uses 8 AWG stranded uncoated copper, which Chapter 9 Table 8 lists at 0.778 ohm per 1,000 ft at 75 degrees C. The load is 80 ft from the panel (one-way) and draws 40 A. What is the approximate voltage drop?
Answer: 5.0 V
Current flows out and back, so the circuit length is 160 ft. R = 0.778 x 160 / 1,000 = 0.1245 ohm, and VD = 40 x 0.1245 = 4.98 V, about 5.0 V (4.1 percent of 120 V). 2.5 V uses only the one-way length, and 10.0 V counts the round trip twice.
Reference: NFPA 70, National Electrical Code, 2023, Chapter 9, Table 8 and 210.19(A) Informational Note
A service has three parallel sets of 350 kcmil copper ungrounded conductors per phase, all in the same raceway. Using Table 250.102(C)(1), what is the minimum size copper main bonding jumper?
Answer: 2/0 AWG
For the main bonding jumper, 250.28(D)(1) uses Table 250.102(C)(1) based on the total area of the parallel conductors: 3 x 350 = 1,050 kcmil. That falls in the 'over 600 through 1100 kcmil' row, which requires 2/0 AWG copper. 1/0 AWG is the row for over 350 through 600 kcmil, which results from using only one 350 kcmil set. The 12.5 percent rule applies only above 1,100 kcmil.
Reference: NFPA 70, National Electrical Code, 2023, 250.28(D)(1) and Table 250.102(C)(1)
A branch circuit supplies 28 A of continuous load and 12 A of noncontinuous load. What is the minimum standard-size overcurrent device permitted by 210.20(A)?
Answer: 50 A
210.20(A) requires the overcurrent device to be at least the noncontinuous load plus 125 percent of the continuous load: 12 + (28 x 1.25) = 12 + 35 = 47 A. The next standard size in 240.6(A) is 50 A. 40 A is the plain sum of 28 + 12 with no 125 percent factor, 45 A is a standard size but is below the 47 A minimum, and 60 A is larger than needed.
Reference: NFPA 70, National Electrical Code, 2023, 210.20(A) and 240.6(A)
A 480Y/277-volt overhead service crosses a commercial parking area that is not subject to truck traffic. What is the minimum clearance from final grade under 230.24(B)?
Answer: 12 ft
Under 230.24(B)(2), 12 ft applies over residential property and driveways and over commercial areas not subject to truck traffic where the voltage does not exceed 300 volts to ground. 277 V to ground qualifies. 15 ft would apply if the voltage to ground exceeded 300 V, and 18 ft is for areas subject to truck traffic. 10 ft applies only to pedestrian-only areas at 150 V to ground or less.
Reference: NFPA 70, National Electrical Code, 2023, 230.24(B)(2)
Type NM cable is stapled to wood framing near a metal switch box. What is the maximum distance from the box within which the cable must be secured under 334.30?
Answer: 12 in.
334.30 requires NM cable to be supported and secured within 300 mm (12 in.) of every cable entry into outlet boxes, junction boxes, cabinets or fittings, and at intervals not exceeding 4-1/2 ft. The cable length between the entry and the closest support may not exceed 18 in. under the same section. 24 in. and 30 in. are longer than permitted, and 6 in. is stricter than the Code requires.
Reference: NFPA 70, National Electrical Code, 2023, 334.30
A device box contains two 12-2 NM cables with ground (each entering through an internal cable clamp) and one single-pole switch on a single yoke. All conductors are 12 AWG. What minimum box volume is required? Use Table 314.16(B)(1) (2.25 cu in. for each 12 AWG).
Answer: 18.0 cu in.
Count 2.25 cu in. allowances: four insulated conductors from the two cables = 4; the two equipment grounding conductors together = 1; the internal clamps together = 1; the switch yoke = 2. Total 8 allowances x 2.25 = 18.0 cu in. 15.75 leaves out the clamp allowance, 20.25 counts one extra allowance, and 22.5 counts the two grounding conductors separately.
Reference: NFPA 70, National Electrical Code, 2023, 314.16(B)(1) through (B)(5) and Table 314.16(B)(1)
A 40-hp, 460-volt, 3-phase squirrel-cage induction motor drives a compressor. The branch-circuit conductors are copper, all terminations are rated 75 degrees C and no correction or adjustment factors apply. What is the smallest conductor permitted?
Answer: 6 AWG
Use the full-load current from Table 430.250, not the nameplate: 40 hp at 460 V is 52 A. Branch-circuit conductors for a single continuous-duty motor must carry at least 125 percent of that value (430.22(A)): 52 x 1.25 = 65 A. In the 75 degree C copper column of Table 310.16, 8 AWG is only 50 A and 6 AWG is 65 A. 4 AWG (85 A) is larger than necessary.
Reference: NFPA 70, National Electrical Code, 2023, 430.6(A)(1), 430.22(A), Table 430.250 and Table 310.16
Live parts of electrical equipment operating at 480 volts nominal are not in an enclosed cabinet. Which arrangement satisfies 110.27(A) for guarding against accidental contact?
Answer: Locating them in a room accessible only to qualified persons
110.27(A) requires live parts operating at 50 to 1000 volts nominal to be guarded against accidental contact by approved enclosures or by location in a room, vault or similar enclosure accessible only to qualified persons, by permanent partitions or screens, or by location on an elevated balcony, gallery or platform arranged to exclude unqualified persons. A sign alone, a mounting height in a public area or a drape does not qualify.
Reference: NFPA 70, National Electrical Code, 2023, 110.27(A)
A contractor estimates total job cost at $92,000 and applies a 30% markup on cost. What is the bid price?
Answer: $119,600
Markup is applied to cost: price = cost x (1 + markup) = $92,000 x 1.30 = $119,600. $27,600 is only the markup amount, $131,429 treats 30% as a margin on price ($92,000 / 0.70), and $128,800 uses a 40% markup.
Reference: General contracting business practice (NASCLA guide topic area), Estimating: markup versus margin
An employee earns gross wages of $1,850 for the week and is well under the year's Social Security wage base. How much Social Security and Medicare (FICA) tax must the employer withhold from this paycheck?
Answer: $141.53
The employee share of FICA is 6.2% Social Security plus 1.45% Medicare = 7.65%. Social Security = $1,850 x 0.062 = $114.70; Medicare = $1,850 x 0.0145 = $26.83 (rounded); total withheld = $141.53. $114.70 and $26.83 are each only one of the two taxes, and $283.05 is the combined employee-plus-employer amount (15.3%).
Reference: IRS Publication 15 (2026), Employer's Tax Guide, Section 9 (Social Security and Medicare Taxes)
Sources
- Prov: Alabama Electrical Contractors Board Candidate Information Bulletin (AL CIB 2026.11.09) (opens in a new tab)
- Alabama Electrical Contractors Board (opens in a new tab)
- Alabama Administrative Code chapter 303-X (Electrical Contractors Board, revised 2/14/2026) (opens in a new tab)
Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.