South Carolina licensing exam

South Carolina Roofing Contractor Exam: Practice Test & Licensing Guide

PSI's open-book technical exam for South Carolina's commercial roofing classification: 65 questions on steep slope, metal panel, flashing, elastomeric, built-up and substrate work, repairs and safety.

Questions
65
Time limit
3 hours
Passing score
71%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Safety

A crew is reroofing a 9:12 house roof with unprotected eaves 18 feet above grade. Which choice is NOT, by itself, an OSHA-accepted fall protection method for this steep roof?

Requirements at a glance

AgencySouth Carolina Department of Labor, Licensing and Regulation (LLR), Contractor's Licensing Board; exams by PSI
ExperienceThe primary qualifying party needs 2 of the last 5 years of full-time experience in the classification, in a management role (S.C. Code 40-11-230)
ExamsRoofing: 65 questions, 3 hours, 70%, plus Business Management and Law (Commercial); 70% on each
Books allowedthe NRCA roofing manuals, Atcheson's Roofing Construction and Estimating, IBC 2021 or 2024 (SC) and 29 CFR 1926
FeesPSI exam fees ($64 to $78 per exam), plus the Board's application and license fees and a financial statement or bond

Applicants for a South Carolina Contractor's Licensing Board specialty license in the Roofing classification.

How to get licensed, step by step

  1. Check the work needs a license

    South Carolina requires a Contractor's Licensing Board license for commercial work above $10,000 in job cost (S.C. Code 40-11-30). Commercial licenses also cover residential work.

    SC Contractor's Licensing Board (LLR) (opens in a new tab)S.C. Code Title 40 Chapter 11 (contractors) (opens in a new tab)

  2. Apply to the Board

    Apply to the Contractor's Licensing Board for an eligibility letter before you register with PSI.

    SC Contractor's Licensing Board (LLR) (opens in a new tab)

  3. Schedule Business and Law and the roofing exam with PSI

    Register for each exam separately. You may take each trade exam twice in 12 months, then once every six months. Commercial Business and Law has no such limit.

    Schedule with PSI (commercial contractors) (opens in a new tab)

  4. Apply for the license

    After you pass, the business entity applies with its primary qualifying party, a financial statement or bond, and the license fee. The group (1 to 5) sets the dollar limit of work you may bid.

    SC Contractor's Licensing Board (LLR) (opens in a new tab)S.C. Code Title 40 Chapter 11 (contractors) (opens in a new tab)

How to prepare

  • Code editions are changing. From November 1, 2026 PSI accepts the 2021 or the 2024 South Carolina codes (ICC codes with state modifications) and the 2023 or the 2020 NEC. After July 1, 2027 only the 2024 codes and the 2023 NEC. Bring one edition you know well and expect questions that read the same in both.
  • Tab your books before exam day: highlighting, underlining and permanent tabs are allowed, but sticky notes and writing during the exam are not.
  • Steep slope roofing is 22 of 65 questions: the NRCA steep slope manual (2025) is the main source.
  • Substrate (8), metal flashing (8), metal panel (6), elastomeric (6), built-up bituminous (6), repairs (4) and safety (5) use the other NRCA manuals.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the SC IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • Roofing Construction and Estimating (Atcheson), 1995, any printing
  • International Building Code (IBC), 2021 or 2024 edition with South Carolina modifications
  • NRCA Roofing Manuals: Steep Slope Roof Systems 2025; Metal Panel and SPF Roof Systems 2024; Membrane Roofing Systems 2023; Architectural Metal Flashing, Condensation Control and Reroofings 2022
  • Code of Federal Regulations, 29 CFR Part 1926 (on PSI's list)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Safety5
Roofing - Substrate8
Roofing - Steep22
Roofing - Metal Panel6
Roofing - Metal Flashing8
Roofing Repairs4
Roofing - Elastomeric6
Roofing - Built-up Bituminous6

Exam day details

  • Administered by PSI Services for the South Carolina Department of Labor, Licensing and Regulation (Contractor's Licensing Board).
  • Fee: $78 to PSI. Board application and license fees are separate.
  • 65 scored questions plus 1 to 10 unscored experimental items (they count against your time) in 180 minutes; 46 of 65 correct (about 71%).
  • Code editions: from November 1, 2026 PSI accepts the 2021 or 2024 South Carolina codes (NEC 2023 or 2020); after July 1, 2027 only the 2024 codes and the 2023 NEC. Our questions are written to be correct under both.
  • Open book: bring the references on PSI's list. You may highlight, underline and add permanent tabs (tabs that would tear the page if removed); sticky notes and removable tabs are not allowed.
  • Apply to the Contractor's Licensing Board first. After approval you get an eligibility letter and register with PSI (855-340-3701) for each exam; the registration confirmation is valid 1 year or until a classification has been failed twice.
  • You may take each trade exam twice in 12 months, then once every six months.
  • Every Contractor's Licensing Board license needs the Business Management and Law exam and the technical exam for the classification, 70% on each (S.C. Code 40-11-230).

Frequently asked questions

What's on the South Carolina roofing exam?

65 scored questions, led by steep slope roofing 22, substrate 8, metal flashing 8, metal panel 6, elastomeric 6, built-up bituminous 6, safety 5 and repairs 4.

What is the biggest topic?

Steep slope roofing, with 22 of 65 questions, drawn from the NRCA steep slope manual.

What is the passing score?

46 of 65, about 71%.

Free questions with answers

Show all 10 free questions and answers
  1. A crew is reroofing a 9:12 house roof with unprotected eaves 18 feet above grade. Which choice is NOT, by itself, an OSHA-accepted fall protection method for this steep roof?

    Answer: A safety monitoring system used alone

    1926.501(b)(11) lists guardrails with toeboards, safety nets or personal fall arrest systems for steep roofs. Safety monitoring is permitted only for low-slope roofing work (b)(10), and a monitor alone is allowed only on low-slope roofs 50 feet or less wide. A steep-roof crew therefore cannot rely on a monitor.

    Reference: 29 CFR Part 1926 (OSHA construction standards), 1926.501(b)(10) and (b)(11)

  2. Under the IBC, what is the minimum net free ventilating area for an enclosed attic, as a fraction of the area of the space ventilated, when the reduced-ratio exception is not used?

    Answer: 1/150

    IBC 1202.2.1 sets the net free ventilating area at not less than 1/150 of the area of the space. The 1/300 ratio is allowed only when the exception's conditions are met. The IRC says the same in R806.2.

    Reference: International Building Code (2021 and 2024, SC edition), 1202.2.1

  3. What minimum airspace must the code leave between attic insulation and the underside of the roof sheathing in a ventilated attic?

    Answer: 1 inch

    IBC 1202.2.1 requires an airspace of not less than 1 inch between the insulation and the roof sheathing, and blocking and bridging must not interfere with air movement. IRC R806.3 repeats the 1-inch clearance at eave and cornice vents.

    Reference: International Building Code (2021 and 2024, SC edition), 1202.2.1

  4. Asphalt shingles are being installed on a 3:12 roof. What underlayment application does the IBC require?

    Answer: Double underlayment

    IBC 1507.2.2 requires double underlayment for slopes from 2:12 up to 4:12, applied per Section 1507.1.1. A single layer is the rule from 4:12 up. Shingle manufacturers also require two layers in this slope range.

    Reference: International Building Code (2021 and 2024, SC edition), 1507.2.2 Slope

  5. Under the IBC, adjacent pieces of drip edge on a shingle roof must be lapped at least how far, and fastened at what maximum spacing?

    Answer: 2 inches lap, fasteners at no more than 12 inches on center

    IBC 1507.2.8.3 requires a minimum 2-inch lap between segments, a vertical leg at least 1-1/2 inches that extends at least 1/4 inch below the sheathing, a leg extending at least 2 inches back on the roof, and mechanical fastening at no more than 12 inches on center. Note that the SC IRC (R905.2.8.5) only requires a drip edge where the manufacturer requires it, but the IBC requires it.

    Reference: International Building Code (2021 and 2024, SC edition), 1507.2.8.3 Drip Edge

  6. What minimum zinc coating designation, and under what ASTM standard, does the IBC list for galvanized steel metal roof panels (other than on Group U buildings)?

    Answer: G90 under ASTM A653

    The 2021 IBC lists galvanized steel at ASTM A653 G90 in Table 1507.4.3(2), Minimum Corrosion Resistance; the 2024 IBC merges the two tables into Table 1507.4.3 and keeps ASTM A653 G-90. Both editions allow G60 only for Group U buildings. ASTM A463 covers aluminum-coated steel and A792 AZ50 covers 55 percent aluminum-zinc coated steel.

    Reference: International Building Code (2021 and 2024, SC edition), 1507.4.3 Material Standards: Table 1507.4.3(2) (2021) / Table 1507.4.3 (2024)

  7. A chimney is 36 inches wide measured perpendicular to the roof slope. What must be installed on its ridge side?

    Answer: A cricket or saddle

    IBC 1503.5 requires a cricket or saddle on the ridge side of any chimney or penetration wider than 30 inches measured perpendicular to the slope. It may be sheet metal or the same material as the roof covering. Unit skylights flashed per the manufacturer are excepted.

    Reference: International Building Code (2021 and 2024, SC edition), 1503.5 Crickets and Saddles

  8. A building already has two layers of roof covering. May a third be applied as a roof recover under the IBC?

    Answer: No, because two or more existing applications bar a recover

    IBC 1512.2.1.1 (2021) / 1512.3 exception (2024) says a roof recover shall not be permitted where the existing roof has two or more applications of any type of roof covering, so the roof must be replaced down to the deck under 1512.2.

    Reference: International Building Code (2021 and 2024, SC edition), 1512.2.1.1 (2021 SC IBC); 1512.3 Exception (2024 SC IBC)

  9. A sprayed polyurethane foam roof is finished with a liquid-applied protective coating. What is the allowed timing of the coating after the foam is applied?

    Answer: Not less than 2 hours nor more than 72 hours

    IBC 1507.13.3 says the protective coating (acrylic, silicone or moisture-cured polyurethane) must go on not less than 2 hours nor more than 72 hours after the foam. Foam left uncoated deteriorates under UV, and waiting for the foam to cure fully is not part of the rule.

    Reference: International Building Code (2021 and 2024, SC edition), 1507.13.3 Application

  10. What is the minimum design slope for a conventional asphalt built-up roof, and for a coal-tar built-up roof, under the IBC?

    Answer: 1/4:12 for asphalt and 1/8:12 for coal tar

    IBC 1507.10.1: built-up roofs need a design slope of at least 1/4:12, except coal-tar built-up roofs, which may be 1/8:12. Coal tar self-heals and ponds less harmfully, which is why it may be flatter.

    Reference: International Building Code (2021 and 2024, SC edition), 1507.10.1 Slope

Sources

Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.