Requirements at a glance
| Agency | Oregon Building Codes Division (BCD); state-run paper exam |
|---|---|
| Experience | 576 classroom hours plus 3,850 hours each of commercial and residential on-the-job experience, or 7,700 hours of each with a similar license |
| Exam | 64 questions, 4 hours, open book; 75% to pass |
| Books allowed | The materials listed on your Letter of Authorization; silent non-programmable calculator |
| Fees | $100 application fee (no separate exam fee); renewal every 3 years |
Plumbers applying to BCD for a journeyman plumber license with 576 classroom hours and 3,850 hours each of commercial and residential on-the-job experience, or 7,700 hours of each with a similar license.
Official links
How to get licensed, step by step
Apply to BCD
Send the journeyman plumber application, proof of classroom and on-the-job hours and the $100 fee. Choose your proctor site.
Oregon Building Codes Division: licensing (opens in a new tab)
Get your Letter of Authorization
BCD mails the letter with the approved testing materials. Call the proctor site to book within 60 days.
Take the exam
Bring the letter, photo ID, your approved code book, pencils and a calculator. 75% is the passing score.
Results and retakes
BCD grades the exam and mails the result in about 2 weeks. After a failure, wait 30 days and send a license reapplication form.
How to prepare
- The 2026 Oregon Plumbing Specialty Code (2024 UPC base) took effect October 1, 2026. BCD does not say which edition the exam tests, so our questions follow the currently adopted code. Confirm the approved materials on your Letter of Authorization.
- OAR 918-695-0040 lists the subjects: drawings and bill of materials, plumbing math, tools and materials, the Plumbing Specialty Code with plumbing rules and hydraulics, job safety and accessibility. It gives no weights, so ours are estimates.
- The exam is open book, so tab your code book and practice sizing, offsets, slopes and volume arithmetic against the clock.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the Plumbing Specialty Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Oregon Plumbing Specialty Code (2024 Uniform Plumbing Code base)Essential
The 2026 OPSC took effect October 1, 2026. Your Letter of Authorization lists the approved materials. We could not find BCD's plumbing materials list.
Official reference list (as published by the testing agency)
- Oregon Plumbing Specialty Code (OPSC). The 2026 OPSC, based on the 2024 Uniform Plumbing Code, took effect October 1, 2026.
- Oregon plumbing statutes and rules (ORS 693 and OAR Division 918)
- Your Letter of Authorization lists the approved testing materials. BCD's plumbing materials list was not available to us.
- A silent, non-printing, non-programmable calculator
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Drawings, Bill of Materials and System Layout | 8 | |
| Plumbing Math: Areas, Volumes, Slopes, Offsets and Pipe Weights | 8 | |
| Tools, Materials and Techniques | 8 | |
| Plumbing Specialty Code: Administration, Definitions and General Regulations | 6 | |
| Plumbing Specialty Code: Fixtures and Water Supply | 8 | |
| Plumbing Specialty Code: Drainage, Vents and Traps | 10 | |
| Oregon Plumbing Laws and Rules (ORS 693, OAR Division 918) | 6 | |
| Hydraulics and Scientific Principles | 4 | |
| Job Safety and OSHA Basics | 3 | |
| Accessibility Provisions Related to Plumbing | 3 |
Exam day details
- Administered by the Oregon Building Codes Division (state-run paper exam at a proctor site).
- Fee: No separate exam fee: the $100 journeyman plumber application fee covers it. Application fees are nonrefundable.
- 64 questions, 4 hours, open book, 75% to pass (BCD license directory). OAR 918-695-0040 lists what the written exam covers but gives no weights.
- BCD mails a Letter of Authorization when your application is approved. Call the proctor site named on it to book; you must test within 60 days of the letter. Bring the letter and photo ID.
- Proctor sites are in Bend, Eugene, Hermiston, Klamath Falls, Ontario, Pendleton, Portland, Roseburg, Salem and White City. BCD grades the paper exam and mails the result in about 2 weeks; results are not given by phone.
- The passing score for all BCD licensing exams is 75%. After a failed exam you wait 30 days and send a license reapplication form; the result includes a strength and weakness report.
- Bring your own pencils and, if you use one, a silent, non-printing, non-programmable calculator. Scratch paper is provided.
- The exam covers: engineering and architectural drawings and a bill of materials; areas, volumes, slopes, offsets, clearances and pipe weights; tools, materials and techniques; the Plumbing Specialty Code, plumbing rules and hydraulics; job safety; and disabled-access provisions related to plumbing (OAR 918-695-0040).
- Our questions follow the currently adopted Oregon Plumbing Specialty Code (2024 UPC base). BCD does not say which edition the exam tests.
Note: BCD lists the subjects the plumbing exam covers (OAR 918-695-0040) but publishes no weights, so our topic split is an estimate. The 2026 Oregon Plumbing Specialty Code (2024 UPC) took effect October 1, 2026; BCD does not state which edition the exam tests, and we could not read the Oregon amendments. Confirm the allowed materials on your Letter of Authorization.
Frequently asked questions
What's on the Oregon journeyman plumber exam?
OAR 918-695-0040 lists drawings and bill of materials, plumbing math, tools and materials, the Plumbing Specialty Code with plumbing rules and hydraulics, job safety and accessibility provisions. No weights are published, so ours are estimates.
Is the exam open book?
Yes, with the materials listed on your Letter of Authorization. Confirm the list before test day; we could not find BCD's plumbing materials list.
Does Oregon have reciprocity for plumbers?
BCD has reciprocity agreements for journeyman plumbers with some states; see its reciprocal license page and application.
What if I fail?
Wait 30 days and send a license reapplication form. Results come by mail in about 2 weeks.
Free questions with answers
Show all 10 free questions and answers
A water closet is being roughed in. Under the footnote to the trap arm table, what is the greatest developed length allowed between the face of the closet flange and the inner edge of its vent?
Answer: 6 feet
Footnote 2 to Table 1002.2 says the developed length between a water closet trap (measured from the face of the closet flange) and its vent shall not exceed 6 feet. The 4-foot and 5-foot values are shorter than the code limit, and the 10-foot value is the 4-inch trap arm limit for other fixtures, which does not apply to closets.
Reference: 2026 Oregon Plumbing Specialty Code, Section 1002.2, Table 1002.2 note 2
A residential kitchen faucet is designed to give a temporary burst of extra flow when the user pulls a spray head. Under Table 401.3.1, what is the highest flow it may reach during the burst?
Answer: 2.2 gpm at 60 psi, reverting to 1.8 gpm on valve closure
Note 4 to Table 401.3.1 lets residential kitchen faucets temporarily exceed the 1.8 gpm at 60 psi limit, but not beyond 2.2 gpm at 60 psi, and they must return to 1.8 gpm when the valve is closed. The other choices either deny the allowance, use the shower pressure of 80 psi, or invent a higher flow and a timer that the code does not contain.
Reference: 2026 Oregon Plumbing Specialty Code, Table 401.3.1 note 4
A 4-inch building drain, approved at 1/8 inch per foot, runs 37 feet. What is the total drop over the run?
Answer: 4-5/8 inches
Drop = 37 ft x 1/8 in per ft = 4.625 inches = 4-5/8 inches. Using 1/4 inch per foot would give 37 x 0.25 = 9.25 inches (9-1/4), which is the standard slope rather than the reduced slope allowed by Section 708.1. 4-1/8 and 5-5/8 are arithmetic slips.
Reference: 2026 Oregon Plumbing Specialty Code, Section 708.1 (slope); calculation
How is the State Plumbing Board made up, according to ORS 693.115?
Answer: Seven members appointed by the Governor, including a journeyman, a contractor, an inspector, an engineer and a public member
ORS 693.115 creates the State Plumbing Board in the Department of Consumer and Business Services with seven members appointed by the Governor and confirmed by the Senate. The seats include a journeyman plumber, a licensed plumbing contractor, a local plumbing inspector who is a journeyman, a registered mechanical engineer, an Oregon Health Authority representative, a supplier or building official, and a public member.
Reference: Oregon Revised Statutes chapter 693, ORS 693.115
Under the Oregon Plumbing Specialty Code, how many plumbing permits are required for a project involving two separate buildings on one lot?
Answer: A separate permit for each separate building or structure
Section 104.1 makes it unlawful to install, alter, repair, replace or remodel a plumbing system without first obtaining a separate plumbing permit for each separate building or structure, except as permitted in 104.2, OAR chapter 918 division 100 and OAR 918-780-0035. A single permit across buildings, per-fixture permits and per-worker permits are not what the section says.
Reference: 2026 Oregon Plumbing Specialty Code, Section 104.1
A plumber tunnels under a walk between two open trenches. The trench is 10 feet deep. Under Section 314.2, what is the longest tunnel allowed, and what clear height must be kept above the pipe?
Answer: 5 feet long, with a clear height of 2 feet above the pipe
Section 314.2 limits tunnel length to one-half the depth of the trench with a maximum length of 8 feet, and requires a clear height of 2 feet above the pipe. One-half of 10 feet is 5 feet, which is less than the 8 foot cap, so 5 feet governs. Eight feet applies only when the trench is 16 feet deep or more. Where pipe is driven, the drive pipe must be at least one size larger than the pipe laid.
Reference: 2026 Oregon Plumbing Specialty Code, Section 314.2
On a plan drawn to a scale of 1/4 inch = 1 foot, a drain measures 7-1/2 inches. How long is the drain?
Answer: 30 feet
At 1/4 inch per foot, each inch on the drawing is 4 feet. 7.5 in x 4 ft per in = 30 feet. Using 1/2 inch per foot would give 15 feet, and reading the inches as feet gives 7.5. Doubling again for 1/8 inch per foot would give 60 feet.
Reference: 2026 Oregon Plumbing Specialty Code, Calculation (drawing scale)
Water flows through a 2-inch (inside diameter) pipe at 8 ft/s. What is the flow in gallons per minute? Use flow = area x velocity and 7.48 gallons per cubic foot.
Answer: About 78 gpm
Area of a 2-inch pipe = 3.1416 x (1/12 ft) squared = 0.02182 sq ft. Flow = 0.02182 x 8 ft/s = 0.1745 cubic feet per second. Per minute = 0.1745 x 60 = 10.47 cubic feet, and 10.47 x 7.48 = 78.3 gpm. Using the diameter as the radius quadruples the area (313 gpm); 157 gpm doubles the correct flow; 39 gpm halves it; 10 gpm reports cubic feet per minute (10.47) without converting to gallons.
Reference: 2026 Oregon Plumbing Specialty Code, Calculation (flow = area x velocity); Section 610.12.1
A trench is 6 feet deep. What is the farthest an employee may need to travel laterally to reach a ladder, stairway or ramp?
Answer: 25 feet
29 CFR 1926.651(c)(2) requires a stairway, ladder, ramp or other safe means of egress in trench excavations 4 feet or more in depth, located so no more than 25 feet of lateral travel is needed to reach it. A 6-foot trench is over the 4-foot threshold.
Reference: OSHA 29 CFR Part 1926 Subpart P, 29 CFR 1926.651(c)(2)
Where accessible plumbing facilities are required, how does the Plumbing Specialty Code say they are to be installed?
Answer: In accordance with the building regulations that require them
Section 403.1 says that where accessible facilities are required in applicable building regulations, the facilities shall be installed in accordance with those regulations (for Oregon, that is the building code, the Oregon Structural Specialty Code, which OAR 918-695-0040 names for the exam). The plumbing code itself does not set the number or layout of accessible rooms.
Reference: 2026 Oregon Plumbing Specialty Code, Section 403.1
Sources
- Oregon BCD: license exams and locations (opens in a new tab)
- Oregon Building Codes Division (licensing) (opens in a new tab)
- Oregon BCD: Plumbing Specialty Code adoption (opens in a new tab)