Oklahoma licensing exam

Oklahoma Roofing Contractor Commercial Endorsement Exam: Practice Test & Licensing Guide

The PSI trade portion of the Oklahoma commercial roofing endorsement: 50 scored questions on general roofing knowledge, low slope roofing, architectural metal and flashing, moisture and energy control, repairs and reroofing, and safety. Open book, 70% to pass.

Questions
50
Time limit
2.5 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Roofing Knowledge

A crew leader quotes a job as 38 squares of membrane. How much roof surface is that?

Requirements at a glance

AgencyOklahoma Construction Industries Board (CIB); exams by PSI
ExperienceRoofing contractor registration with the CIB plus the commercial endorsement application (see OAC 158:85); residential roofers need a separate residential endorsement and exam from January 1, 2027 (59 O.S. 1151.25a)
Exam50 scored questions, 2.5 hours, 70% (35)
Books allowedSMACNA Architectural Sheet Metal Manual (2012), IBC (2018 or 2024 with Oklahoma revisions), NRCA Roofing Manuals (membrane 2023, metal panel and SPF 2024, steep slope 2021 or 2025, flashing and reroofing 2022), 29 CFR 1926
Fee$92 to PSI per exam portion (non-refundable), plus CIB application and license fees
Retest30 days after the first fail; 90 days after each later fail

Registered Oklahoma roofing contractors who want the commercial endorsement to install, renovate, reroof, repair, maintain or waterproof roofs on commercial and industrial buildings. The endorsement needs both parts, Business and Law plus this trade exam, at 70% each. Holding the commercial endorsement on January 1, 2027 also exempts you from the new residential roofing exam (59 O.S. 1151.25a).

How to get licensed, step by step

  1. Register and log your hours

    Register with the CIB as an apprentice and log your hours under a licensed contractor (1 year is 2,000 hours). Have your employer's affidavits notarized.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

  2. Apply to the CIB

    Send the CIB your application and notarized experience affidavits. When it approves you, you receive an Ok Con ID.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

  3. Schedule with PSI

    Book your exam with PSI online or at (855) 834-8750. Contractor applicants also take the Business and Law portion.

    Schedule with PSI (Oklahoma contractor exams) (opens in a new tab)PSI: Oklahoma CIB Candidate Information Bulletin (effective 9/11/2026) (opens in a new tab)

  4. Pass and get licensed

    After you pass, send the CIB your results and license fee to receive your license.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

How to prepare

  • All Oklahoma trade exams are open book, so the skill is finding answers fast: bound books, permanent tabs only, highlighting allowed, no writing.
  • Bring a silent, non-programmable calculator. The exam adds up to 10 unscored experimental questions that count against your time.
  • Low slope roofing (15) is the biggest section, followed by architectural metal and flashing (9) and repairs and reroofing (8): tab the NRCA membrane and flashing manuals.
  • Reroofing in the 2024 IBC is Section 1512; Oklahoma adds an exception to 1512.3 on roof recover over asphalt shingles.
  • Safety (7) comes from 29 CFR 1926, such as fall protection and ladders.
  • Both parts (this exam and Business and Law) must be passed at 70% each for the commercial endorsement.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the SMACNA manual and the NRCA manuals and the IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • SMACNA Architectural Sheet Metal Manual, 2012Essential

    First reference on the commercial roofing endorsement list; flashing, gutters, copings and metal roofing details.

  • NRCA Roofing Manuals (membrane 2023; metal panel and SPF 2024; steep slope 2021 or 2025; flashing, condensation and reroofing 2022)Essential

    Four manuals are listed. The 2021 steep slope manual is not allowed from 3/15/2026.

    NRCA store (opens in a new tab)

  • International Building Code (IBC) with Oklahoma revisionsEssential

    The bulletin allows the 2018 or 2024 edition; 2024 usable from 9/14/2026 and 2018 not allowed from 12/14/2026. Chapter 15 (roof assemblies and rooftop structures) is the part tested.

    ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)

  • 29 CFR Part 1926 (OSHA construction standards)

    Allowed in the exam room, either the full text or PSI's selections.

    Read free (OSHA) (opens in a new tab)

Official reference list (as published by the testing agency)
  • SMACNA Architectural Sheet Metal Manual, 2012
  • International Building Code, 2018 or 2024 edition, with Oklahoma revisions (2024 usable from 9/14/2026; 2018 not allowed from 12/14/2026)
  • NRCA Roofing Manual: Membrane Roofing Systems, 2023
  • NRCA Roofing Manual: Metal Panel and SPF Roof Systems, 2024
  • NRCA Roofing Manual: Steep Slope Roof Systems, 2021 or 2025 (2021 not allowed from 3/15/2026)
  • NRCA Roofing Manual: Architectural Metal Flashing, Condensation and Air Leakage Control, and Reroofing, 2022
  • 29 CFR Part 1926 (OSHA construction), or PSI's selections

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
General Roofing Knowledge5
Low Slope Roofing15
Architectural Metal Roofing Systems and Sheet Metal Flashing9
Moisture and Energy Control6
Repairs and Reroofing8
Safety7

Exam day details

  • Administered by PSI Services for the Oklahoma Construction Industries Board (CIB).
  • Fee: $92 to PSI per exam portion, non-refundable. CIB application and license fees are separate.
  • 50 scored questions in 150 minutes; 35 correct (70%) to pass.
  • Commercial endorsement: you must pass both parts (the Business and Law exam and this trade exam) at 70% each. If you pass only one, you can retake the other within 3 years (OAC 158:85-9-3).
  • Commercial endorsement fees are in OAC 158:85-2-5; check the CIB for current amounts.
  • Residential roofing: beginning January 1, 2027, residential roofing contractors need a residential roofing endorsement and must pass a residential roofing exam at 70%. Contractors registered on January 1, 2027 have a one-year grandfathering window (exam or 10 extra hours of continuing education); commercial-endorsed contractors are exempt (59 O.S. 1151.25a).
  • Edition note: the 2024 IBC may be used from 9/14/2026. Our code questions follow the 2024 IBC with Oklahoma amendments (reroofing is Section 1512).
  • If you fail, wait 30 days to retest; after each later failure the wait is 90 days.
  • Open book: bring your own bound copies of the allowed references. You may highlight, underline and index them beforehand with permanent tabs only; no writing and no sticky notes.
  • PSI may add up to 10 unscored experimental questions, which count against your time. A silent, non-printing, non-programmable calculator is allowed.
  • The CIB must approve your application first (you receive an Ok Con ID) before you can schedule with PSI.

Frequently asked questions

What's on the Oklahoma commercial roofing endorsement exam?

50 scored questions: low slope roofing 15, architectural metal roofing and sheet metal flashing 9, repairs and reroofing 8, safety 7, moisture and energy control 6 and general roofing knowledge 5.

What do I need for the commercial endorsement?

Roofing contractor registration plus a passing score of 70% on both parts: Business and Law and this trade exam. If you pass one part you have 3 years to pass the other.

Do residential roofers need this exam?

Not this one. From January 1, 2027, residential roofers need their own residential roofing endorsement and exam (59 O.S. 1151.25a). Contractors who hold the commercial endorsement on that date are exempt from the residential exam.

Free questions with answers

Show all 10 free questions and answers
  1. A crew leader quotes a job as 38 squares of membrane. How much roof surface is that?

    Answer: 3,800 square feet

    A roofing square is 100 square feet of roof surface, so 38 squares = 38 x 100 = 3,800 sq ft. Choosing 380 or 38,000 is a decimal slip; 1,444 comes from squaring 38.

    Reference: General roofing practice, Estimating unit: the roofing square

  2. What is the minimum design slope for drainage of a modified bitumen roof under the IBC?

    Answer: 1/4 unit vertical in 12 units horizontal

    1507.11.1 requires modified bitumen roofing to have a design slope of not less than 1/4:12 (2 percent) for drainage. 1/8:12 is only the coal-tar built-up allowance in 1507.10.1, and 2:12 is the asphalt shingle minimum.

    Reference: 2024 International Building Code (Oklahoma adoption), Section 1507.11.1

  3. A coal-tar pitch built-up roof is designed on a new commercial building. What is the lowest design slope the IBC allows for it?

    Answer: 1/8 unit vertical in 12 units horizontal

    1507.10.1 sets 1/4:12 (2 percent) for built-up roofs but lets coal-tar built-up roofs go down to 1/8:12 (1 percent). Coal-tar pitch is self-healing and tolerates slow-draining water better than asphalt. Dead level is never a design slope for drainage.

    Reference: 2024 International Building Code (Oklahoma adoption), Section 1507.10.1

  4. IBC 1503.2.1 sets a minimum thickness for corrosion-resistant metal flashing. What is it?

    Answer: 0.019 inch (No. 26 galvanized sheet)

    1503.2.1 requires metal flashing to be corrosion resistant and not less than 0.019 inch thick, which is No. 26 galvanized sheet. Thinner sheet fails the requirement, and thicker sheet is allowed but is not the minimum.

    Reference: 2024 International Building Code (Oklahoma adoption), Section 1503.2.1

  5. A lapped, nonsoldered seam metal roof panel system will use no applied lap sealant. What is the minimum roof slope under IBC 1507.4.2?

    Answer: 3 units vertical in 12 units horizontal

    1507.4.2 gives lapped nonsoldered seam panels without lap sealant a 3:12 minimum (25 percent). With applied lap sealant the minimum drops to 1/2:12 (4 percent), and standing-seam panel systems may go to 1/4:12 (2 percent).

    Reference: 2024 International Building Code (Oklahoma adoption), Section 1507.4.2

  6. A radiant barrier is placed above a roof deck and under the roof covering. Under IBC 1510.2, the barrier and covering together must comply with which fire test?

    Answer: FM 4450 or UL 1256

    1510.2 permits radiant barriers above decks where they are covered with an approved roof covering and the system complies with FM 4450 or UL 1256. 1510.4 adds ASTM C1313 as the material standard.

    Reference: 2024 International Building Code (Oklahoma adoption), Section 1510.2

  7. Oklahoma's amendment to IBC 1512.3 adds a condition. A building has one layer of asphalt shingles in sound condition. Which new covering is not permitted over it?

    Answer: Another layer of asphalt shingles

    The Oklahoma amendment (OAC 748:20-2-20) adds a fourth condition: where the existing roof has one or more applications of asphalt shingles, additional applications of asphalt shingles are not permitted. Other coverings may still be recovered over sound shingles under 1512.3 if the manufacturer's instructions are followed.

    Reference: Oklahoma Administrative Code Title 748, Chapter 20 (IBC 2024 amendments), OAC 748:20-2-20, Section 1512.3 Exception (4)

  8. During a reroof, which existing material may be reinstalled under IBC 1512.4?

    Answer: Sound slate or tile that is not cracked or broken

    1512.4 allows reinstalling existing slate, clay or cement tile, but not damaged, cracked or broken pieces. Rusted, damaged or deteriorated vent flashing, edgings, drain outlets, collars and counterflashings, damaged ballast and aggregate surfacing from built-up roofs may not be reinstalled.

    Reference: 2024 International Building Code (Oklahoma adoption), Section 1512.4

  9. Under OSHA's fall protection standard, a roof is considered a steep roof when its slope is greater than what?

    Answer: 4 in 12

    29 CFR 1926.500(b) defines a low-slope roof as 4 in 12 or less and a steep roof as greater than 4 in 12. Note that the IBC uses a different low-slope definition (less than 2:12) for roofing materials, so do not mix the two.

    Reference: 29 CFR 1926 (OSHA construction standards), 29 CFR 1926.500(b), definitions of Low-slope roof and Steep roof

  10. A crew is applying a membrane on a 5:12 roof with an unprotected eave 20 ft above the ground. Which fall protection is acceptable under 29 CFR 1926.501(b)(11)?

    Answer: Guardrails with toeboards, safety nets or personal fall arrest

    At 5:12 the roof is steep (over 4 in 12), so 1926.501(b)(11) applies: guardrail systems with toeboards, safety net systems or personal fall arrest systems. The warning line and safety-monitor options are low-slope provisions in (b)(10).

    Reference: 29 CFR 1926 (OSHA construction standards), 29 CFR 1926.501(b)(11)

Sources

Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.