Requirements at a glance
| Agency | NYC Department of Buildings; exams by CPS HR Consulting at Pearson VUE |
|---|---|
| Exam | Written: 80 questions, 3 hours, 56 correct (70%). No practical exam |
| Books allowed | None; closed book |
| Fees | $585 written exam fee per DOB's pages (older 2023 bulletins print $525), plus DOB license and registration fees |
Applicants for a NYC Department of Buildings site safety manager license, who manage safety on major buildings (10 or more stories, 125 feet or taller, or a 100,000 square foot footprint, per 2014 BC 3302.1) under Building Code Chapter 33. There is no practical exam; after the written exam DOB runs a background investigation.
Official links
How to get licensed, step by step
Apply to DOB for the exam
Submit a typed exam application (form LIC41 or DOB NOW) with the exam fee to the NYC Department of Buildings. DOB reviews it before CPS HR can schedule you.
Schedule the written exam
CPS HR emails scheduling instructions in about 2 to 3 weeks. Tests are taken at Pearson VUE centers, and you have 6 months from your application date to sit. Each eligibility notice covers one attempt; after a fail you reapply and pay again.
CPS HR: NYC DOB exams and candidate bulletins (opens in a new tab)
Background investigation and license
There is no practical exam for this license. After you pass the written exam DOB runs a background investigation and issues the license. You need a 40-hour DOB site safety course taken within the last year, a valid Site Safety Training Supervisor card and one of DOB's nine experience routes.
How to prepare
- The 4/7/2026 candidate bulletin tests the 2014 NYC Building Code Chapter 33, the 2014 Fire Code chapters 9 and 33 and the 1 RCNY 3310-01 site safety rules, not the 2022 codes now in force.
- Construction operations (56 questions) outweigh requirements (24): construction of a major building is the largest topic at 24.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
Official reference list (as published by the testing agency)
- 2014 NYC Administrative Code Title 28, Chapters 1 and 4
- 2014 NYC Building Code (BC), Chapters 14, 18, 19, 22 and 33
- 2014 NYC Fire Code (FC), Chapters 9 and 33
- 1 RCNY 104-08 and 1 RCNY 3310-01 (site safety rules)
What's on the exam
Official content outline from CPS HR Consulting (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Requirements for Construction or Demolition of a Major Building | 12 | |
| Administrative Requirements | 12 | |
| Construction of a Major Building | 24 | |
| Alterations of a Major Building | 11 | |
| Temporary Construction Equipment | 13 | |
| Demolition Operations | 8 |
Exam day details
- Administered by CPS HR Consulting for the NYC Department of Buildings (tests at Pearson VUE).
- Fee: $585 written exam fee per DOB's page (the candidate bulletin prints $525). DOB license, background investigation and registration fees are separate.
- 80 written questions in 3 hours; 56 correct (70%) to pass. The exam is closed book.
- The outline is from the CPS HR candidate information bulletin dated 4/7/2026. It groups the exam as Construction and Demolition Requirements (24 questions) and Construction and Demolition Operations (56 questions).
- The current candidate bulletin still tests the 2014 NYC codes, not the 2022 codes now in force for work, so our questions follow the 2014 text.
- This is the written exam only. There is no practical exam for this license. Our practice tests cover the written exam.
- Candidates must be 18, read English, hold a 40-hour DOB site safety course certificate taken within the last year and a valid Site Safety Training Supervisor card, and meet one of DOB's nine experience routes (for example 3 of the last 5 years as a registered design professional or site safety coordinator).
- If you fail, you wait 14 days; you can sit up to 3 times in 6 months, then wait 6 months. Eligibility is good for 6 months.
- Apply to DOB first (form LIC41 or DOB NOW). CPS HR then emails scheduling instructions in about 2 to 3 weeks, and you have 6 months from the date of your application to sit.
- Each eligibility notice covers one attempt. If you fail, you must reapply to DOB and pay the exam fee again.
- Pearson VUE test centers: CPS HR candidate line 855-224-6977, NYCDOB@cpshr.us.
Note: The code editions and topic counts come from the CPS HR candidate bulletin dated 4/7/2026, which tests the 2014 NYC codes although the 2022 codes are in force for work. The bulletin prints a $525 exam fee where DOB's page says $585. Major building size thresholds changed 12/11/2024; check the current bulletin.
Frequently asked questions
What is on the NYC site safety manager written exam?
80 questions: construction and demolition requirements 24 (major building requirements 12 and administrative requirements 12) and operations 56 (construction 24, alterations 11, temporary equipment 13, demolition 8).
Which code edition does the exam test?
The 4/7/2026 candidate bulletin names the 2014 NYC Building Code, Fire Code and Administrative Code plus the 1 RCNY site safety rules, not the 2022 codes.
Is there a practical exam for site safety manager?
No. The license has a written exam and a background investigation, with no practical.
Free questions with answers
Show all 10 free questions and answers
A 12-story, 170-foot major building with a 90,000 square foot footprint is being constructed. Who may DOB-certified personnel designate to monitor site safety there?
Answer: A certified site safety coordinator may be designated in place of a site safety manager
Section 3310.5 allows a site safety coordinator (Article 403 certification) instead of a manager for construction, enlargement or demolition of a major building that is less than 15 stories or 200 feet tall and has a footprint of 100,000 sq ft or less. This building meets both limits. A concrete safety manager is extra personnel under 3310.9 and does not replace the primary manager or coordinator.
Reference: 2014 NYC Building Code, Section 3310.5 (Exception)
During the full demolition of a major building, the primary site safety manager's required presence continues until which point?
Answer: The site has been backfilled to grade
Under Section 3310.5.2, presence for demolition starts with removal of glass, asbestos or façade and, for a full demolition, runs until the site is backfilled to grade. For a partial demolition it runs until the building is enclosed and the sidewalk shed is removed.
Reference: 2014 NYC Building Code, Section 3310.5.2
How often must a site safety manager meet with the designated representative of each subcontractor, at a minimum?
Answer: Weekly
Section 3310.8.1 requires meeting at least weekly with each subcontractor's designated representative to confirm compliance with Chapter 33. Daily is the standpipe check frequency, not the meeting frequency.
Reference: 2014 NYC Building Code, Section 3310.8.1
At what spacing must the permanent stair be kept behind the working deck during construction of a new building?
Answer: Within 40 feet or 4 floors below the working deck at all times
Section 3303.11 item 1 requires at least one permanent stair to be brought to within 40 feet or 4 floors of the working deck. The 75 feet / 7 stories figure belongs to the elevator or hoist exception in 3303.12.2, so it is a common mix-up.
Reference: 2014 NYC Building Code, Section 3303.11, item 1
Where a dry standpipe with an air pressurized alarm is used on a site, what is the maximum system pressure?
Answer: 25 psig
Section 3303.8.1 item 4.1 requires pressure maintained at all times, not exceeding 25 psig, using nitrogen or an air compressor with a dryer. The alarm activates when pressure falls below the supervisory pressure or rises above 25 psig.
Reference: 2014 NYC Building Code, Section 3303.8.1, item 4.1
What records must the permit holder keep for pre-shift safety meetings under Section 3301.12.3?
Answer: Per worker, one meeting a week: date, time, attendees, and the signed name of the competent person leading it
Section 3301.12.3 requires a record for each worker of one pre-shift meeting per week. It lists date and time, name, title and company of each participant, and the name, title, company and signature of the competent person who conducted it. Meetings are held at the start of each shift before work begins (3301.12).
Reference: 2014 NYC Building Code, Sections 3301.12 and 3301.12.3
How many days in advance must adjoining property owners be notified in writing of upcoming demolition under Section 3306.3.2?
Answer: Not less than 10 days
Section 3306.3.2 requires written notice to adjoining owners at least 10 days before the scheduled start, describing the work, timeframe and contacts. Notice to DOB is separate: 24 to 48 hours before work begins under 3306.3.1.
Reference: 2014 NYC Building Code, Sections 3306.3.1 and 3306.3.2
What is the minimum height of a guardrail toeboard on an unenclosed perimeter, and the maximum post spacing for standard lumber or pipe rails (Sections 3308.7.2 and 3308.7.3)?
Answer: 3 1/2 inches high; posts not more than 8 feet apart
Toeboards are at least 3 1/2 inches high (1 x 6 lumber or metal plank) and the rails and toeboards are fastened to posts spaced not more than 8 feet apart. The 5 1/2 inch toeboard is the excavation-edge guardrail value in Section 3304.4.4, which is a common mix-up.
Reference: 2014 NYC Building Code, Sections 3308.7.2 and 3308.7.3
Apart from the small-platform and licensed-rigger exceptions, who must design a suspended scaffold under Section 3314.3.2?
Answer: A registered design professional
Section 3314.3.2 requires suspended scaffolds to be designed by a registered design professional. Supported and outrigger scaffolds also need an RDP design unless the narrow exception in 3314.3.1 applies.
Reference: 2014 NYC Building Code, Section 3314.3.2
The general contractor schedules a safety coordination meeting for tower crane erection. How far ahead must DOB be notified, and what is the timing for the pre-jump meeting before a climb (Sections 3319.8.3 and 3319.8.4.1)?
Answer: DOB at least 48 hours in advance; pre-jump meeting no more than 24 hours before each jump or climb
Section 3319.8.4.1 requires notice to the department at least 48 hours before any safety coordination meeting or pre-jump meeting. Section 3319.8.3 requires a pre-jump meeting no more than 24 hours before each instance of a jump or climb, so it is fresh. No work proceeds without it.
Reference: 2014 NYC Building Code, Sections 3319.8.3 and 3319.8.4.1
Sources
- NYC Department of Buildings: exams and qualifications (opens in a new tab)
- CPS HR Consulting: NYC DOB license exams and candidate bulletins (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.