New York licensing exam

NYC Master and Special Electrician Written Exam (NYC DOB): Practice Test & Licensing Guide

The written exam for a New York City master or special electrician license: 80 questions in 3 hours on wiring and protection, wiring methods, conduit fill and special occupancies. Closed book, 56 correct (70%) to pass. Our questions follow the 2011 NYC Electrical Code (NEC 2008 plus NYC amendments) named in the 7/24/2023 candidate bulletin.

Questions
80
Time limit
3 hours
Passing score
70%
Books
Closed book

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Wiring and Protection

A branch circuit will supply a 24-ampere continuous load, and the breaker is a standard one not listed for 100 percent operation. What is the minimum overcurrent device rating that can be used for this load under NEC 2008?

Requirements at a glance

AgencyNYC Department of Buildings; exams by CPS HR Consulting at Pearson VUE
ExamWritten: 80 questions, 3 hours, 56 correct (70%), shared by master and special electrician. Then a practical exam
Books allowedNone; closed book
Fees$585 written exam fee per DOB's pages (older 2023 bulletins print $525), plus DOB license and registration fees

Applicants for a NYC Department of Buildings master electrician or special electrician license. Both licenses use the same written exam. The license applies within the five boroughs.

How to get licensed, step by step

  1. Apply to DOB for the exam

    Submit a typed exam application (form LIC41 or DOB NOW) with the exam fee to the NYC Department of Buildings. DOB reviews it before CPS HR can schedule you.

    NYC DOB: exams and qualifications (opens in a new tab)

  2. Schedule the written exam

    CPS HR emails scheduling instructions in about 2 to 3 weeks. Tests are taken at Pearson VUE centers, and you have 6 months from your application date to sit. Each eligibility notice covers one attempt; after a fail you reapply and pay again.

    CPS HR: NYC DOB exams and candidate bulletins (opens in a new tab)

  3. Pass the written, then the practical

    After the written exam you apply for the practical exam. It is a separate fee and is not covered by our practice tests.

    NYC DOB: exams and qualifications (opens in a new tab)

  4. Background investigation and license

    DOB runs a background investigation, then issues the license. The 7/2023 bulletin asks for 7.5 years of electrical experience (10,500 hours) within the 10 years before the background application, with shorter routes for some degree and trade school holders. Check the bulletin for your route.

    NYC DOB: exams and qualifications (opens in a new tab)

How to prepare

  • Edition notice: the 7/2023 bulletin and the current CPS HR page name the 2011 NYC Electrical Code (NEC 2008 plus NYC amendments) and 1 RCNY 34-05. The 2025 NYC Electrical Code (Local Law 128 of 2024, NEC 2020 based) took effect 12/21/2025 and no updated bulletin has been published. Confirm the tested edition with CPS HR (NYCDOB@cpshr.us) before your exam.
  • Wiring and protection and wiring methods are 24 questions each; conduit fill and communications and special occupancies are 16 each.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

    Official reference list (as published by the testing agency)
    • 2011 NYC Electrical Code (NEC 2008 with NYC amendments), as listed in the 7/24/2023 candidate bulletin
    • NFPA 70 (NEC) 2008, Articles 90 to 830 and Chapter 9 tables
    • 1 RCNY 34-05

    What's on the exam

    Official content outline from CPS HR Consulting (number of questions per topic):

    TopicQuestions
    Wiring and Protection24
    Wiring Methods, Materials, and Equipment for General Use24
    Equipment for General Use, Communications and Conduit Fill16
    Special Occupancies, Equipment, and Conditions16

    Exam day details

    • Administered by CPS HR Consulting for the NYC Department of Buildings (tests at Pearson VUE).
    • Fee: $585 written exam fee per DOB's page (the 2023 candidate bulletin prints $525). The practical exam is a separate fee. DOB license and background investigation fees are separate.
    • 80 written questions in 3 hours; 56 correct (70%) to pass. The exam is closed book.
    • The outline is from the CPS HR candidate information bulletin dated 7/24/2023. Wiring and protection and wiring methods are 24 questions each; conduit fill and communications and special occupancies are 16 each.
    • Edition notice: the 2025 NYC Electrical Code (Local Law 128 of 2024, based on NEC 2020) took effect 12/21/2025, but no updated bulletin has been published. The 7/2023 bulletin and the current CPS HR page still name the 2011 NYC Electrical Code (NEC 2008) and 1 RCNY 34-05, so our questions follow those. Confirm the tested edition with CPS HR (NYCDOB@cpshr.us) before your exam.
    • Master and Special Electrician candidates take the same written exam.
    • This is the written exam only. After it you take a hands-on practical exam. The practical is not covered by our practice tests.
    • Apply to DOB first (form LIC41 or DOB NOW). CPS HR then emails scheduling instructions in about 2 to 3 weeks, and you have 6 months from the date of your application to sit.
    • Each eligibility notice covers one attempt. If you fail, you must reapply to DOB and pay the exam fee again.
    • Pearson VUE test centers: CPS HR candidate line 855-224-6977, NYCDOB@cpshr.us.

    Note: The code edition and topic counts come from the CPS HR candidate bulletin dated 7/24/2023, which names the 2011 NYC Electrical Code (NEC 2008). The 2025 NYC Electrical Code (Local Law 128 of 2024, based on NEC 2020) took effect 12/21/2025 and no updated bulletin has been published. The tested edition is unconfirmed: ask CPS HR (NYCDOB@cpshr.us) before you test. The bulletin prints a $525 written fee where DOB's page says $585.

    Frequently asked questions

    What is on the NYC master electrician written exam?

    80 questions: wiring and protection 24, wiring methods, materials and equipment for general use 24, equipment for general use, communications and conduit fill 16, and special occupancies, equipment and conditions 16.

    Is the master electrician exam the same as the special electrician exam?

    Yes. Master and special electrician candidates take the same written exam.

    Which code edition is tested?

    The 7/24/2023 bulletin and the current CPS HR page name the 2011 NYC Electrical Code (NEC 2008 plus NYC amendments) and 1 RCNY 34-05. The 2025 NYC Electrical Code took effect 12/21/2025 and no updated bulletin has been published, so confirm the edition with CPS HR (NYCDOB@cpshr.us) before you test.

    Does this cover the practical exam?

    No. The practical is a separate hands-on exam and is not covered by our practice tests.

    Free questions with answers

    Show all 10 free questions and answers
    1. A branch circuit will supply a 24-ampere continuous load, and the breaker is a standard one not listed for 100 percent operation. What is the minimum overcurrent device rating that can be used for this load under NEC 2008?

      Answer: 30 A

      The overcurrent device must carry the noncontinuous load plus 125 percent of the continuous load. Here that is 24 x 1.25 = 30 A, and 30 A is a standard rating (240.6). 25 A uses only the load itself and is too small; 35 A and 40 A are larger than needed.

      Reference: NFPA 70 (NEC) 2008, 210.20(A)

    2. Under the NYC amendment to 215.2(A)(1), what is the smallest copper feeder conductor that may supply a dwelling unit?

      Answer: 8 AWG

      NYC sets a minimum feeder size to a dwelling unit of 8 AWG copper (or 6 AWG aluminum or copper-clad aluminum). 10 AWG is too small for NYC; 6 AWG is the aluminum minimum, not the copper one.

      Reference: 2011 NYC Electrical Code (NEC 2008 amendments), 215.2(A)(1) (NYC amendment)

    3. Two household electric ranges, each rated 12 kW, are supplied from one feeder in a multifamily building. Using Table 220.55, Column C, what is the demand load for the two ranges?

      Answer: 11 kW

      Column C of Table 220.55 gives a maximum demand of 8 kW for one range and 11 kW for two ranges not over 12 kW. 8 kW is the one-range value, 24 kW is the connected load with no demand factor, and 15.6 kW comes from a percentage that Column C does not use.

      Reference: NFPA 70 (NEC) 2008, Table 220.55, Column C

    4. What is the maximum length of liquidtight flexible metal conduit (LFMC) permitted in a NYC installation under the NYC amendment to 350.12?

      Answer: 6 ft

      NYC adds 350.12(3), which prohibits LFMC in lengths exceeding 1.83 m (6 ft). The same 6 ft limit appears in 230.43(10) for flexible metal conduit used on services and requires an equipment bonding jumper to be routed with it.

      Reference: 2011 NYC Electrical Code (NEC 2008 amendments), 350.12(3) (NYC amendment)

    5. What is the maximum number of 90-degree bends (total 360 degrees) permitted in one EMT run between pull points under 358.26?

      Answer: Four

      358.26 allows no more than the equivalent of four quarter bends (360 degrees total) between pull points such as boxes and conduit bodies. The same limit applies to rigid metal and intermediate metal conduit.

      Reference: NFPA 70 (NEC) 2008, 358.26

    6. Under the NYC amendment to 334.10, where may Type NM cable be used?

      Answer: In one- and two-family and multifamily dwellings

      NYC revises 334.10 to permit Types NM, NMC and NMS only in one- and two-family dwellings and multifamily dwellings, except as prohibited in 334.12. 334.12(A) adds that it is not permitted in multifamily dwellings exceeding three floors above grade or in any non-residential building.

      Reference: 2011 NYC Electrical Code (NEC 2008 amendments), 334.10 and 334.12(A) (NYC amendments)

    7. What is the maximum number of 12 AWG THHN conductors (0.0133 sq in. each) permitted in 3/4 in. EMT, whose 40 percent fill area is 0.213 sq in.?

      Answer: 16

      0.213 sq in. / 0.0133 sq in. = 16.0, so 16 conductors fit. 18 conductors would be 0.2394 sq in., which exceeds the 40 percent area. Table 4 lists 0.213 sq in. as the 40 percent area for 3/4 in. EMT and Table 5 gives 0.0133 sq in. for 12 AWG THHN.

      Reference: NFPA 70 (NEC) 2008, Chapter 9, Table 1, Table 4 (Article 358) and Table 5

    8. What is the maximum number of 4 AWG THHN conductors (0.0824 sq in. each) that may be installed in a 1-1/4 in. EMT with a 40 percent fill area of 0.598 sq in.?

      Answer: 7

      0.598 sq in. / 0.0824 sq in. = 7.26, which rounds down to 7 conductors because the decimal is under 0.8. Seven conductors occupy 0.5768 sq in., within the limit; eight would occupy 0.6592 sq in., which is over 0.598 sq in.

      Reference: NFPA 70 (NEC) 2008, Chapter 9, Table 1, Note 7 to Tables, Tables 4 and 5

    9. In a NYC hospital emergency power system, which load must have its own separate automatic transfer switch under the NYC amendment to 517.30(B)(4)?

      Answer: Stair pressurization systems

      NYC adds to 517.30(B)(4) that a separate automatic transfer switch is required for the fire pump, alarm and alerting systems, automatic smoke control or venting, and stair pressurization systems. Corridor lighting, bedroom receptacles and nurse call equipment are served from the regular branches. The 2025 NYC code amendments no longer carry this separate-transfer-switch list.

      Reference: 2011 NYC Electrical Code (NEC 2008 amendments), 517.30(B)(4) (NYC amendment)

    10. In the hoistway pit of a NYC elevator, which load may NOT be connected to the load side of a ground-fault circuit interrupter under the amended 620.24(A)?

      Answer: The required pit lighting or a sump pump

      NYC revises the second sentence of 620.24(A) so that required lighting and/or a sump pump shall not be connected to the load side of a GFCI, so a ground-fault trip cannot leave the pit dark or let it flood. The pit duplex receptacle itself is required to be GFCI protected. (The 2025 code keeps only the NEC lighting sentence.)

      Reference: 2011 NYC Electrical Code (NEC 2008 amendments), 620.24(A) (NYC amendment)

    Sources

    Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.