Nevada licensing exam

Nevada C-1D Plumbing Contractor Exam: Practice Test & Licensing Guide

The PSI trade exam for Nevada's C-1D Plumbing license: 80 questions on the 2018 Uniform Plumbing Code, gas piping, water heaters, backflow and plumbing math, open book.

Questions
80
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Gas Systems

Under 2018 UPC 1212.6, where must the manual shutoff valve for a gas furnace be located?

Requirements at a glance

AgencyNevada State Contractors Board (NSCB); exams by PSI
Experience4 years as a journeyman, foreman, supervisor or contractor in the classification within the last 15 years (up to 3 years can be education)
Exams80 questions, 3 hours, 70%, plus the Construction Management Survey (business and law)
Books allowed2018 UPC, NFPA 54 (2012), NFPA 58 (2014) and the 2012 UMC
Fees$95 per PSI exam ($140 for a trade exam plus the CMS), plus NSCB application and license fees and a bond

Qualifying individuals for a Nevada C-1D Plumbing contractor license (water, drainage and vent systems, roof drains, gas piping, water heaters, small hydronic systems and medical gas).

How to get licensed, step by step

  1. Pick your classification

    Find the NSCB classification that covers your work, and name the qualifying individual (an owner or a qualified employee) with 4 years of experience in it.

    NSCB: License classifications (opens in a new tab)

  2. Apply to the NSCB

    Submit the application with your experience verification, financial statement and fingerprints. The Board sends you an exam eligibility notice once it accepts your qualifications.

    Nevada State Contractors Board (opens in a new tab)

  3. Schedule the CMS and C-1D trade exam with PSI

    Book both exams with PSI. Bring the allowed references, tabbed. If you fail, wait 2 weeks; you get three attempts and must pass within 6 months of filing.

    Schedule with PSI (Nevada contractors) (opens in a new tab)PSI: Nevada "C" classification bulletin and outlines (opens in a new tab)

  4. Post your bond and get licensed

    After you pass, the Board sets your monetary limit and bond amount ($1,000 to $500,000). File the bond and pay the license fee to receive your license.

How to prepare

  • Bring the exact editions on PSI's outline. Nevada's trade exams use the 2017 NEC, the 2018 IBC/IRC and the 2018 UPC/UMC; a newer book gives some wrong answers.
  • Tab your books with permanent tabs before exam day. Sticky notes are removed at check-in, and you can't write in the books.
  • OSHA 1926 isn't allowed in the room, but every trade exam has a safety section from it. Learn the common numbers (fall protection at 6 ft, ladders 3 ft above the landing, trenches 5 ft).
  • Nevada uses the Uniform Plumbing Code, not the IPC. Tab UPC Chapters 6 (water), 7 (drainage), 9 (vents), 10 (traps) and 12 (fuel gas).
  • Practice gas pipe sizing with the UPC Chapter 12 tables and DFU-based drain and vent sizing (Tables 702.1 and 703.2).
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 UPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • Uniform Plumbing Code (UPC), 2018, IAPMO (allowed in the exam room)
  • NFPA 54: National Fuel Gas Code, 2012, and NFPA 58: Liquefied Petroleum Gas Code, 2014 (allowed in the exam room)
  • Uniform Mechanical Code (UMC), 2012 (allowed in the exam room)
  • 29 CFR Part 1926, OSHA Construction (not allowed in the room)
  • Mathematics for Plumbers and Pipefitters; Modern Hydronic Heating; FSEC Solar Water and Pool Heating Manual; Pipefitter's Handbook (not allowed in the room)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Gas Systems8
Cleanouts4
Fixtures and Equipment3
Hydronics3
Water Heaters/Venting6
Piping, Valves, and Controls5
Water Supply8
Hangers and Supports4
Drain, Waste, and Vents8
Backflow4
Traps and Interceptors4
Isometric Analysis/Plumbing Mathematics6
Safety5
Joints and Connections3
Solar3
General Plumbing Requirements3
Storm Drainage3

Exam day details

  • Administered by PSI Services for the Nevada State Contractors Board (NSCB).
  • Fee: $95 to PSI for one exam, $140 for a trade exam plus the CMS. NSCB application and license fees are separate.
  • 80 questions in 3 hours; 56 correct (70%) to pass.
  • Nevada's plumbing exams use the Uniform Plumbing Code (UPC), not the IPC.
  • Open book: bring your own copies of the allowed references. You may highlight and add permanent tabs beforehand, but not write in them; sticky notes are removed.
  • PSI may add up to 10 unscored trial questions, which count against your time.
  • If you fail, wait 2 weeks to retake. You get three attempts, and you must pass within 6 months of filing your application; a third failure voids the application.
  • Every Nevada contractor license needs both the Construction Management Survey (business and law) and the trade exam for the classification, plus 4 years of experience in the last 15.

Frequently asked questions

Which plumbing code is the Nevada C-1D exam based on?

The 2018 Uniform Plumbing Code (UPC), plus NFPA 54 (2012) for fuel gas, NFPA 58 (2014) for LP-gas and the 2012 Uniform Mechanical Code.

What's on the Nevada C-1D plumbing exam?

80 questions across 17 areas. The biggest are gas systems, water supply and drain, waste and vents (8 each), then water heaters and venting and isometric analysis and plumbing math (6 each).

Is C-1D the same as the C-1 Plumbing and Heating exam?

No. C-1 is a 120-question, 5-hour exam that adds boilers, sheet metal, fire sprinklers, chilled water and industrial piping. C-1D is the plumbing-only subclassification.

Free questions with answers

Show all 10 free questions and answers
  1. Under 2018 UPC 1212.6, where must the manual shutoff valve for a gas furnace be located?

    Answer: Within 6 ft of the appliance, upstream of the connector, with a union or flange downstream of the valve

    UPC 1212.6 (from NFPA 54 9.6.5) requires each appliance to have an accessible, approved manual shutoff valve serving only that appliance, located within 6 ft of it, upstream of any connector, with a union or flanged connection downstream of the valve so the appliance controls can be removed. A valve only at the meter doesn't isolate the single appliance, and a valve concealed in a wall cavity isn't accessible. (Exceptions allow a valve accessibly located inside or under an appliance, such as a range, where it can be reached by removing an access panel.)

    Reference: 2018 Uniform Plumbing Code (IAPMO), 1212.6

  2. Under 2018 UPC 707.9, what clear space is required in front of a cleanout on a 3-inch drain?

    Answer: 24 in by 24 in

    UPC 707.9 requires at least 18 in × 18 in clearance in front of cleanouts on piping 2 inches or smaller, and 24 in × 24 in for piping larger than 2 inches. A 3-inch drain needs 24 × 24 inches.

    Reference: 2018 Uniform Plumbing Code (IAPMO), 707.9

  3. Under 2018 UPC Table 1002.2, what is the maximum horizontal length of a 2-inch trap arm (from trap weir to vent)?

    Answer: 60 in

    UPC Table 1002.2 limits trap arms to 30 in for 1-1/4 in, 42 in for 1-1/2 in, 60 in (5 ft) for 2 in, 72 in for 3 in and 120 in for 4 in, with minimums of twice the pipe diameter and 1/4 in per ft slope. Water closets are limited to 6 ft from the closet flange to the vent (note 2).

    Reference: 2018 Uniform Plumbing Code (IAPMO), Table 1002.2

  4. Under 2018 UPC Table 603.3.1, a fixture faucet has an effective opening of 3/4 inch and isn't affected by side walls. What minimum air gap is required?

    Answer: 1-1/2 in

    Table 603.3.1 requires air gaps (not affected by side walls) of 1 in for effective openings up to 1/2 in, 1-1/2 in for openings up to 3/4 in, 2 in up to 1 in, and twice the diameter above 1 in. Where affected by side walls the values are 1-1/2, 2-1/4, 3 in and three times the diameter.

    Reference: 2018 Uniform Plumbing Code (IAPMO), Table 603.3.1

  5. Under 2018 UPC Table 703.2, what is the maximum drainage fixture unit load on a 3-inch horizontal drain, and how many water closets may it carry?

    Answer: 35 DFU; not more than three water closets

    Table 703.2 allows 35 DFU on a 3-inch horizontal drain (48 DFU vertical). Note 4 limits a 3-inch vertical stack to four water closets or six-unit traps and a 3-inch horizontal branch or drain to three. 84 units is the 3-inch vent value.

    Reference: 2018 Uniform Plumbing Code (IAPMO), Table 703.2

  6. A house drain serves a private bathroom (1.6-gpf gravity water closet, lavatory, bathtub), a kitchen sink, a dishwasher with independent drain, and a clothes washer standpipe. Using Table 702.1, what is the total DFU load?

    Answer: 13 DFU

    From Table 702.1 (private): water closet 3 + lavatory 1 + bathtub 2 + kitchen sink 2 + dishwasher 2 + clothes washer 3 = 13 DFU. A 3-inch horizontal drain (35 DFU, Table 703.2) easily handles it, and the water closet requires at least 3 inches anyway.

    Reference: 2018 Uniform Plumbing Code (IAPMO), Table 702.1

  7. Under 2018 UPC 608.2, when must a pressure regulator be installed on the water supply?

    Answer: When static pressure exceeds 80 psi

    UPC 608.2 requires an approved pressure regulator, preceded by an adequate strainer (not required for regulators 1-1/2 in and larger), where static water pressure exceeds 80 psi, reducing static pressure to 80 psi or less. UPC 608.1 sets the minimum residual pressure at 15 psi.

    Reference: 2018 Uniform Plumbing Code (IAPMO), 608.2

  8. Under the 2018 UPC, a gas water heater in a residential garage must have its ignition source and burners how high above the floor?

    Answer: 18 in

    UPC 507.13 requires appliances in residential garages that generate a glow, spark or flame capable of igniting flammable vapors to be installed with the ignition source at least 18 inches above the floor, unless listed as flammable-vapor-ignition resistant. Gasoline vapors are heavier than air and collect near the floor.

    Reference: 2018 Uniform Plumbing Code (IAPMO), 507.13

  9. Under 2018 UPC Table 313.3, what is the maximum horizontal support spacing for 1-inch copper water tubing?

    Answer: 6 ft

    Table 313.3 requires horizontal supports for copper and copper alloy piping every 6 ft for 1-1/2 inches and smaller and every 10 ft for 2 inches and larger. Vertical copper is supported at each floor, not exceeding 10 ft.

    Reference: 2018 Uniform Plumbing Code (IAPMO), Table 313.3

  10. Under 29 CFR 1926.652(a)(1), at what depth must a sewer trench (not in stable rock) generally have cave-in protection?

    Answer: 5 ft

    1926.652(a)(1) requires a protective system (sloping, benching, shoring or shielding) for excavations 5 feet or deeper unless in stable rock; shallower trenches need protection if a competent person sees signs of potential cave-in. Ladders or other egress are required at 4 feet (1926.651(c)(2)).

    Reference: 29 CFR Part 1926, 1926.652(a)(1)

Sources

Questions last verified October 22, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.